PRACTITIONERFORM
PartL:Statementof Experience forDomesticBuilder(Limited)‒Carpentrywork
Howtofilloutthisstatement
STEP1Readabouttheskills,knowledgeandexperiencethatyouneedtodemonstratetotheVictorian Building Authority (VBA) ifyouareapplyingforregistrationintheclassofDomesticBuilder(Limited)‒Carpentrywork.
STEP2Fillouttables1and2:
Intable1,tellusaboutyourgeneralexperienceinCarpentrywork.
Intable2,tellusaboutspecificprojectsthatdemonstrateyourexperienceinCarpentrywork.
STEP3Readtable3.Itexplainsthetypesofevidencethatyoucanusetodemonstratetheexperiencethatyounoteintable2.YouwillneedtopresentyourevidenceportfoliototheVBAwhenyoulodgeyourapplication.
Remember
• Pleaseincludeasmuchdetailaspossible,becausethis statementis used toworkoutwhetheryouhaveenoughexperienceforregistration.
• Inyourapplication,youwillneedtoprovidereferencestoconfirmyouhavecompletedthiswork.
• Itisanoffenceundersection246oftheBuildingAct1993togiveanyfalseormisleadingstatementorinformationinyourapplication.
• Tomeettheexperiencerequirementsforregistration,youdon’tneedtohavedonealltheworkitemslistedincolumn1oftable1.Butyoudoneedexperienceinmostofthem.
• Wewillreturnyourapplicationifthisstatementisincompleteordoesn’thave enoughdetail,andaskyouformoreinformation.
©StateofVictoria,VictorianBuildingAuthority2016 (published September 2016) 1
2
PRACTITIONERFORM
STEP1.Learnaboutskills,knowledgeandexperiencethatyouneed
QualificationsIfyouhavesuccessfullycompletedthefollowingqualification,youwillsatisfysomeofthetechnicalknowledgerequiredforCarpentrywork:
• CPC30111CertificateIIIinCarpentry.
Ifyouhavenotcompletedthiscertificate,theVBAwillassessyourCarpentryknowledgeagainstthecompetenciesincludedinthecertificate.
ExperienceSotheVBAcanassesswhetheryouhavetherequiredexperienceinthiscomponentofdomesticbuildingwork,youshouldprovideaportfolio(tables1,2and3)ofevidencethatdemonstratesyourexperience.Thisevidencemustshowyoucancarryout,andmanageandarrangetocarryoutofalltheactivitiesassociatedwithCarpentryworkinacompetentmannerandtoaprofessionalstandard.
Yourportfolioshouldincludeevidenceof:
• yourexperienceintheareasthatyoutickintable1• yourparticipationintheconstructionofnon-habitablebuilding
structures(abovegroundandfreestanding)fortwodifferentresidentialprojects,includingonethatinvolvedinstallingmasonry.Thisworkcaninclude:o planningandsettingouttheconstructionofnon-habitablebuildings
andstructureso installingfootings,slabsandsetoutfornon-habitablebuildingsand
structureso erectingframingfornon-habitablebuildingsandstructures
o installingmasonryworkfornon-habitablebuildingsandstructureso constructingretainingwallswheretheyarepartofthe
non-habitablestructureo installingcompliantdoorsandwindows
• yourparticipationinconstructingtimberframingforthreehomes.Thisworkcaninclude:o constructingframingforceilingsandroofs,floorsandwalls
includingloadbearingandnon-loadbearingwallso installingwallandceilingliningsincludingwetarealiningo constructingframingforexternaldeckingandverandaso constructingframingforsub-floorso installingsheetflooringo constructingframingforandinstallingdoorsandwindows
• yourparticipationinconstructingandinstallinginternalstaircasesforatleasttwohomes
• threeexamplesofyourparticipationinconstructingandinstallingcabinetsandtheirassociatedhardware
• threeexamplesofyourparticipationinselectingandapplyingwaterproofingtobathrooms,kitchens,laundriesorthelike
• yourparticipationinconstructingonesafetybarrierforaswimmingpoolorspa
• twoexamplesofyourparticipationinerecting,alteringanddismantlingformworkforstairsandramps,andsuspendedslabs,columns,beamsorwalls
• thefollowingAustralianStandards:o AS2870Residentialslabsandfootingso AS/NZS4505Garagedoorsandotherlargeaccessdoors
3
PRACTITIONERFORM
o AS1397,Steelsheetandstrip–Hot-dippedzinc-coatedoraluminium/zinccoated
o AS1684TimberFramingCodeo AS3660Termitemanagemento AS4055Windloadsforhousingo AS4440Installationofnailplatedtimberroofedtrusseso AS/NZS1170series,Minimumdesignloadsonstructureso AS/NZS4600Cold-formedsteelstructureso AS3700Masonrystructureso AS/NZS4455Masonryunits,paversandflagso AS/NZS1170.2Windactionso AS2047Windowsandexternalglazeddoorsinbuildingso AS1288Glassinbuildings:selectionandinstallationo AS1926Swimmingpoolsafetystandardsseto AS3740Waterproofingofdomesticwetareas
• yourresponsibilityforandinvolvementin:o establishingtherequirementsforabuildingpermitforthe
proposedworko havingcompliedwiththebuildingpermitissuesfortheworko producingestimatesofcosts,andproducingaccuratelabourand
materialscheduleso engagingandsupervisingrelevanttradestoundertakelicensed
works.
4
PRACTITIONERFORM
STEP2.Completetables1and2
Table1.FilloutthistabletodescribeallCarpentryworkthatyouhavedone
Whattypeofworkhaveyoudone?Tickthebox.
Howmanytimeshaveyoudonethistypeofwork?Tickthebox. Whatwereyourexactresponsibilities?Listinpointform.
Establishedtherequirementforabuildingpermitfortheproposedwork
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Appliedforandobtainedabuildingpermitforproposedwork
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
5
PRACTITIONERFORM
Compliedwithabuildingpermit
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Arrangedrelevantcertificationofcompletedbuildingwork
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Producedcostestimatesandquotesforproposedwork
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Interpretedplans,drawingsandspecifications
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
PRACTITIONERFORM
Identifiedsiteandtaskrelatedhazardsanddevelopedriskcontrolstrategies
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
DevelopedandinterpretedtheSafeWorkMethodsStatements(SWMS)orJobSafetyAnalysisworksheets(JSAs)
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Supervisedsubcontractorsandothertrades(includingtradesforalteringsanitary,water,gas,drainageandelectricalworks)toensureworkisconductedsafelyandtorequiredstandards
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
6
7
PRACTITIONERFORM
Bathroom,KitchenandLaundryRenovationwork
Demolishedanexistingbathroom,kitchenorlaundry
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Alteredorconstructedwallframingandceilings
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedfixturessuchasbaths,showersbases,spasandthelike
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
8
PRACTITIONERFORM
Installedwallandceilinglinings,includingwetarealining
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Selectedandappliedappropriatewaterproofingsystems
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Alteredwindowsand/ordoors
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedskylights(withflashinginstalledbyregistered/licensedplumber)
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
9
PRACTITIONERFORM
Installedorrepairedwalland/orfloortiling,includingsplashbacks
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedjoineryforbasins,sinks,troughs,WCsuites,tapware,floorwastesetc.
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedshowerscreensandmirrors
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Undertookplastering ☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
10
PRACTITIONERFORM
Undertookpainting ☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
CabinetMaking,JoineryandStairMakingwork
Constructedcabinetsandcomponentsonsite
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Manufactured,assembledandinstalleddoorsandwindows;componentsfordoorsandwindowframes,doorsandsashes,andstairs;joineryunitcomponents
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
11
PRACTITIONERFORM
Manufactured,assembledandinstalledinternalstairsonsite
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
ExternalFixtureswork
Fixedhardwareaccordingtomanufacturerspecifications,usingappropriatetoolsandequipment
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedblindsorawningstomanufacturerspecifications
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
PRACTITIONERFORM
Testedtheoperationoftheproductandrectifiedanyfaults
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
ConstructionofNon-habitableBuildingStructureswork
Plannedandsetoutthesiteofconstructionofthenon-habitablebuildingstructureaccordingtoplansandspecifications
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Carriedoutormanagedexcavationsforthesiteofthenon-habitablebuildingstructure
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
12
PRACTITIONERFORM
Establishedthelevelsandpreparedfootings(includingstumps,slabs,padfootingsetc.)fornon-habitablebuildingstructures
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Erectedframes,floorsandwallsfornon-habitablebuildingsandstructures
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedappropriatedoorsandwindowstospecification
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Constructedretainingwallsthatarepartofanon-habitablestructure
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
13
14
PRACTITIONERFORM
Erected,alteredandismantledformworkforstairsandramps
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Erected,alteredanddismantledformworkforsuspendedslabs,columns,beamsandwalls
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
ConstructionofGatesandFenceswork
Constructedswimmingpoolorspasafetybarriers
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
15
PRACTITIONERFORM
DoorandWindowReplacement/Installationwork
Removedexistingwindowsordoorsandtheircomponenthardware
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Ensuredadequatestructuralsupportforthewindowordoortobeinstalled
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Preparedtheopeningandframefortheinstallationofthewindowordoor
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
16
PRACTITIONERFORM
Positionedneworreplacementwindowordoorunitsandfixedthemtotheframeaccordingtoplans,specificationanddrawings
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
ExternalWallCladdingwork
Straightenedandpreparedexteriorwalls
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Fixededgefinishing,flashingandinsulation
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
17
PRACTITIONERFORM
Setout,cutandfixedhorizontalweatherboards
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Fixedpanelling ☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Framingwork
Connectedandbracedframesaccordingtodesignspecifications
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
18
PRACTITIONERFORM
Prepared,fabricatedandinstalledframingsupportworkassociatedwithglazing
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Constructedanderectedtimberandmetalwallframingandroofstructures
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Constructedandinstalledsub-floorframing,includingbearers,joistsandstumps
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedwindowanddoorframes
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
19
PRACTITIONERFORM
Erectedceilings ☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Erectedsub-floorframing ☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Installedsheetflooring ☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Placedrooftrusses ☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
PRACTITIONERFORM
Assembledanderectedpartitionframes
☐ 1–5
☐ 6–10
☐ 11–20
☐ 20+.
Pleasecontinuetonextpage
20
21
PRACTITIONERFORM
Table2.FilloutthistabletodescribetheCarpentryprojectsthatyouhavedone
BriefdescriptionPeriodofwork(mustincludeactualdates)
Workaddress(orwhereworkwasundertaken)
Nameandcontactnumberofyouremployer
Buildingpermitnumber
Constructionoftwonon-habitablebuildingstructures
Project1
Startdate:
Enddate:
Project2
Startdate:
Enddate:
PRACTITIONERFORM
Constructionandinstallationofframingforthreehomes
Project1
Startdate:
Enddate:
Project2
Startdate:
Enddate:
Project3
Startdate:
Enddate:
22
23
PRACTITIONERFORM
Constructionandinstallationofinternalstaircasesfortwohomes
Project1
Startdate:
Enddate:
Project2
Startdate:
Enddate:
Constructionandinstallationofthreebathroom,kitchenorlaundrycabinets
Project1
Startdate:
Enddate:
PRACTITIONERFORM
Project2
Startdate:
Enddate:
Project3
Startdate:
Enddate:
Selectionandapplicationofwaterproofingtobathrooms,kitchens,laundriesorthelikeforthreeprojects
Project1
Startdate:
Enddate:
24
PRACTITIONERFORM
Project2
Startdate:
Enddate:
Project3
Startdate:
Enddate:
Constructionofonesafetybarrierforaswimmingpoolorspa
Project1
Startdate:
Enddate:
25
PRACTITIONERFORM
Erection,alterationanddismantlingofformworkforstairsandramps,andsuspendedslabs,columns,beamsorwallfortwoprojects
Project1
Startdate:
Enddate:
Project2
Startdate:
Enddate:
Pleasecontinuetonextpage
26
27
PRACTITIONERFORM
STEP3.Usetable3tocreateyourevidenceportfolio
Table3.Usethistabletocreateanevidenceportfoliothatsupportsyourexperienceintable2
Areaofexperience Suggestedevidenceordocumentation
Applyforabuildingpermitforthe work Copiesofdocumentsthatyoupreparedinsupportofanapplicationforabuildingpermit
Detailedplans,drawingsandspecificationsforeachprojectsubmittedaspartofthepermitapplication
Enterintoandadministerappropriatecontracts Copiesofcontractsbetweenyouandtheclientorbuilderforthework
Documentationthatdemonstratesyourcapacitytocorrectlycompleteadomesticbuildingcontract
Evidenceyousuccessfullycompletedtraininginthefollowingunitsofcompetency:
• Selectandprepareaconstructioncontract• Administeraconstructioncontract
Producecostestimatesforrenovationwork Copiesofquotesthatyouhavepreparedforeachproject
Materialsliststhatyouhavepreparedrelevanttothetasksthatyouundertook
Workingcalculationsformaterialquantitiesthatdemonstratehowyouestimatedmaterialrequirements
Labourschedulingandcostingsforeachproject
Copiesofpaidinvoices,indicatingmaterialspurchasedthatrelatedtoeachproject
Ownprofitandlossstatementforeachprojectshowingactualcostsofconstructionforeachproject
28
PRACTITIONERFORM
Carryoutcarpentrywork,including:
• constructionofnon-habitablebuildingstructures
• constructionofgatesandfences• bathroom,kitchenandlaundryrenovations• framing• wallcladding• doorandwindowreplacement• cabinetmaking,joineryandstairmaking• attachinganexternalfixture
Theevidencesamplesthatyoumustproviderelatetotheareasofexperiencelistedinthecolumntotheleft.Thedocumentslistedbelowareexamplesofevidencethatyoucanprovidetodemonstrateyourexperienceincarpentrywork.
Plansandspecificationsrelatingtoworkyouconstructedandinstalled
Photographsofworksinprogressandfinalisedworksthatyouconstructedandinstalledtospecification,withassociateddrawings
Copiesofcuttinglistsforcarpentryprojectsyouaresubmittingasevidence,alongwiththeassociatedplans,drawingsandspecifications
Copiesofinspectionreportsundertakenbytherelevantregisteredbuildingsurveyororregisteredbuildinginspector
Copiesofany‘minorbuildingworks’noticesindicatingrectificationworksrequired,anddemonstrationofhowyouundertooktorectifyfaults
Planandprovideonsitesupervision Projectmanagementschedulesorspreadsheetsusedforeachproject,indicatingeachstageoftheconstruction,keytradesinvolved,timelinesandmilestones
CopiesoftherelevantSafeWorkMethodStatements(SWMS)orJobSafetyAnalysisworksheets(JSAs)forasampleofprojects
Otherdocumentationrelatingtoonsitesupervision
Pleasecontinuetonextpage
29
PRACTITIONERFORM
Remember:Theinformationprovidedinthisformmustbetrueandcorrect.Itisanoffenceundersection246oftheBuildingAct1993togivefalseormisleadinginformationinrelationtoanapplicationforregistration,andthisoffencecarriesamaximumpenaltyof120penaltyunits.
Ideclarethattheinformationcontainedinthisformiscompleteandtruetothebestofmyknowledge.AndIunderstandthattheVBAmaymakeenquiriestoverifyanyoftheinformationIhavegivenonthisform,andIconsentfortheinformationprovidedinthisformtobesharedwithanyotherthirdpartyforthatpurpose.
Applicantname
Applicantsignature
Date