Post on 05-Apr-2018
transcript
DAVID MULLER – MANAGING DIRECTOR
11th March 2013
INVESTORIUM MEETING
THE BASEMENT, SYDNEY
DISCOVERY AND DEVELOPMENT OF
FERTILISERS (POTASH AND PHOSPHATE) IN
THE NT OF AUSTRALIA BY RUM JUNGLE
RESOURCES LTD
For
per
sona
l use
onl
y
ASX CODE: RUM
Rum Jungle Resources Ltd is a Darwin based, NT focused diversified explorer.
Listed on the ASX in November 2007 after raising $12 million in the IPO.
Significant new institutional shareholder base has emerged in 2012
$16 million cash on deposit end December 2012.
Market Capitalisation 241 million shares @ $0.25 is A$60 million.
Announces JORC inferred resource of 253,000,000 tonnes at 15% P2O5 in Dec 2011
Includes now measured 138 million tonnes at 15.7% P2O5 announced December 2012
Over 2000 RC holes now completed for over 60,000 meters.
Full scoping study of phosphate commenced in September
Total Potash resource of 5,500,000 tonnes potassium sulphate in brine announced November 2012
TAKEOVER ANNOUNCED FOR CENTRAL AUSTRALIAN PHOSPHATE LTD FEB 2012
DIRECTORS
Rob Annells(Chairman)
David Muller (Managing Director)
Jeff Landels
SENIOR STAFF
Chris Tziolis (Chief Development Officer)
Chris Moyle (CFO and Company Secretary)
Nigel Doyle (Exploration Manager)
John Dunster (Chief Geologist)
Top Shareholders
Washington H Soul Pattinson 18.8%
Lion Selection 5.7%
Acorn Capital 4.9%
Farjoy Pty Ltd 6.5%
Merrill Lynch Nominees 4.3%
For
per
sona
l use
onl
y
THE BARROW CREEK 1 PHOSPHATE
DISCOVERY BY RUM JUNGLE RESOURCES LTD,
AMMAROO, NORTHERN TERRITORY AUSTRALIA
For
per
sona
l use
onl
y
KEY FACTORS FAVOURING DEVELOPMENT
• ACCESS TO RAIL AND PORT VIA DARWIN OPENS ASIAN
EXPORT OPPORTUNITY FOR SUPPLY STABILITY
• PROXIMITY OF WESTERN GEORGINA BASIN TO
RAILHEAD
• HIGH GRADE ORE CLOSE TO SURFACE PROMOTES
CHEAP EXTRACTION
• BLANKET UNIFORMITY OF DEPOSIT AIDS MINE
PLANNING
• HUGE POTENTIAL FOR BILLION TON PLUS DEPOSIT
GEOGRAPHY AND GEOLOGY UNIQUELY COMBINE
For
per
sona
l use
onl
y
WORLD PRODUCTION PHOSPHATE
For
per
sona
l use
onl
y
7 MAIN NORTH AFRICAN & MED PLAYERS
For
per
sona
l use
onl
y
DARWIN’S PROXIMITY TO ASIA
Jakarta: 1470nm
Singapore: 1807nm
Ho Chi Minh: 2003nm
Hong Kong: 2305nm
Taipei: 2315nm
Bangkok: 2393nm
Shanghai: 2677nm
Yokohama: 2918nm
Seoul: 3010nm
Melbourne: 3755km
Adelaide: 3241km
For
per
sona
l use
onl
y
DELIVERY ORE CONCENTRATES BY RAIL TO DARWIN
For
per
sona
l use
onl
y
For
per
sona
l use
onl
y
DISTRIBUTION OF PHOSPHATE IN GEORGINA BASIN
For
per
sona
l use
onl
y
For
per
sona
l use
onl
y
For
per
sona
l use
onl
y
COSTEAN 4 FROM SURFACE TO 7 METERS DEPTH
32% P2O5
28% P2O5
For
per
sona
l use
onl
y
Model Barrow Creek 1 Looking NW
For
per
sona
l use
onl
y
Barrow Creek 1 JORC Resource of 238 Mt at 14.6% P2O5 using a 10% cut off. This includes a Measured Resource of 136 Mt at 15.7%,
some as shallow as 3 m depth.
RUM JUNGLE RESOURCES LTD AMMAROO PHOSPHATE PROJECT
•Shallow high grade phosphate, easily mined and
located only 90km from rail
•Scoping study almost complete
Low Strip
Ratios
Proximity to
rail Shallow high grade
phosphate exposed
in costeans
For
per
sona
l use
onl
y
WHAT THE OPERATION MAY LOOK LIKE
RECENT AERIAL PHOTOS DUCHESS MINE ,
GEORGINA BASIN QUEENSLAND
For
per
sona
l use
onl
y
EXCAVATOR MINING
MINING HORIZONTAL PHOSPHATE BEDS IN EASTERN GEORGINA BASIN AT DUCHESS MINE
QUEENSLAND,JULY 2012
For
per
sona
l use
onl
y
RESOURCE DEFINITION COMPLETE AT BARROW
CREEK 1
SUBSTANTIAL RESOURCE ALSO LIKELY AT
AMMAROO 1, 80KM EAST OF BC 1.
For
per
sona
l use
onl
y
RESOURCE ESTIMATE DRILLING COMPLETED SEPTEMBER 2012. TOTAL 2082 RC HOLES
FOR 61,221 METERS. TOTAL 32 DIAMOND DRILL CORE INTERSECTIONS. INITIAL INFERRED
RESOURCE OF 253,000,000 TONNES AT 15.0% P2O5 UPGRADED DEC 2012 TO INCLUDE
138,000,000 MEASURED RESOURCE AT 15.7%
For
per
sona
l use
onl
y
RUM ANNOUNCES TAKEOVER FOR CEN
For
per
sona
l use
onl
y
For
per
sona
l use
onl
y
Combined Resource Map F
or p
erso
nal u
se o
nly
For
per
sona
l use
onl
y
TENEMENT HOLDINGS MARCH 2012
20m@
20%P2O5
For
per
sona
l use
onl
y
COMBINED TENEMENTS CEN AND RUM
For
per
sona
l use
onl
y
THE KARINGA CREEK POTASH DISCOVERY BY
RUM JUNGLE RESOURCES LTD, LASSITER
HIGHWAY, NORTHERN TERRITORY, AUSTRALIA
For
per
sona
l use
onl
y
Source:
http://www.marketoracle.co.uk/
• Increasing demand,
particularly from India,
China, US
• Price tripled since 2007
For
per
sona
l use
onl
y
For
per
sona
l use
onl
y
ACCUMULATION OF POTASH SALTS IN CENTRAL AUSTRALIAN
GROUNDWATER DISCHARGE ZONE
For
per
sona
l use
onl
y
Joint Venture with Reward Minerals (Lake Disappointment,
WA) RUM holds around 90%.
First pass environmental surveys completed
Extensive brine sampling in 2010 and 2011 produced
encouraging results
Bench-scale tests confirm schoenite can be produced by two-
stage evaporation
Deep drilling, sampling and flow testing completed 2012 to
upsize potential
New resource of 5,530,000 tonnes K2SO4 announced in
November 2012.
Karinga Creek Potash Project 2010 - 2012
For
per
sona
l use
onl
y
Rum Jungle test pit 2010
RUMs 2010 Sampling • hand-dug holes to geochemically sample brines
• brine chemistry varies considerably within and between lakes
• bench scale tests confirmed that two-stage evaporation can produce
schoenite from at least some of the lake brines
• small test pits for pump tests to check recharge rates
• encouraging over short time frame, need much longer duration tests to
account for seasonal fluctuations
For
per
sona
l use
onl
y
Vibracore drilling September 2011
Sonic drilling October 2011
a dozen piezometers installed
For
per
sona
l use
onl
y
FLOW TESTING OF BORES
For
per
sona
l use
onl
y
FLOW TESTING OF BORES
For
per
sona
l use
onl
y
For
per
sona
l use
onl
y
SILTSTONE AQUIFER LIKELY TO GREATLY
EXCEED LAKE BRINE RESOURCE
AQUIFER 1 AND AQUIFER 2 DEMONSTRATED TO BE A
SINGLE LARGE AQUIFER OF THE CENTRAL AUSTRALIAN
GROUNDWATER DISCHARGE ZONE
For
per
sona
l use
onl
y
CENTRAL LAKES FLOW RATES FROM DRILL
HOLES
For
per
sona
l use
onl
y
Waterbore Drilling May 2012, dozens of
piezometers to be installed
Supa-mats
For
per
sona
l use
onl
y
ADDITION OF LAKE HOPKINS COULD ADD
ANOTHER MAJOR RESOURCE
For
per
sona
l use
onl
y
LABORATORY TRIALS
Two step process:
Evaporation to remove bulk of halite
Flotation to improve purity
Process Path 1 Process Path 2
Initial Brine Water
Evaporation
(1st
Stage) Halite
(NaCl)
Evaporation
(2nd
Stage)
Residual Bittern
Mixed Salts
Flotation
Process
Schoenite
(K2SO4.MgSO4. 6H2O)
Evaporation +
Cooling @ 0°C
Epsomite
(MgSO4.7H2O)
Spent
Brine
Residual bittern for bittern adjustment
In plant
Initial Brine Water
Evaporation
(1st
Stage)
Mirabilite
(Na2SO4.10H2O)
Cooling
@ -10°C
Concentrated Brine
Spent Brine
Evaporation
(2nd
Stage)
Schoenite
(MgSO4.K2SO4.6H2O)
Evaporation
(3rd
Stage)
Residual
Bittern
Flotation
Process
Halite
(NaCl)
Mixed
Salts
Residual bittern for bittern
adjustment in plant
For
per
sona
l use
onl
y
FLOTATION TRIALS
Mixed salts preparation
Drying
Crush and sieve to the right size
Flotation steps
Mix crushed mixed salts with bittern
Dose flotation agents and allow to age
Introduce air (single stage flotation)
Collect froths that are rich in potassium salts
For
per
sona
l use
onl
y
EVAPORATION TRIALS
Harvest
Mixed salts
Residual bittern
Improve potassium content from 0.5%-1% to 6%-7%
K mostly in the form of schoenite (approximately 30% of mixed
salts)
For
per
sona
l use
onl
y
EVAPORATION TRIALS F
or p
erso
nal u
se o
nly
EVAPORATION TRIALS – HALITE REMOVAL F
or p
erso
nal u
se o
nly
EXAMPLES OF OPERATIONS IN
CHINA AND CHILE
For
per
sona
l use
onl
y
Chinese Schoenite Operation F
or p
erso
nal u
se o
nly
EVAPORATION PONDS UTAH F
or p
erso
nal u
se o
nly
FLOTATION FACILITY F
or p
erso
nal u
se o
nly
SALT FEED TO FLOTATION PLANT F
or p
erso
nal u
se o
nly
LINED PONDS ATACAMA CHILE F
or p
erso
nal u
se o
nly
ATACAMA EVAPORATION PONDS F
or p
erso
nal u
se o
nly
THE WAY FORWARD
Get approval for trenching and then flow test
trenches for 5 days
Drill deeper holes to 50 meters to increase brine
volume and extend resource
Geotechnical testing of soils for evaporation pond
lining (either lake sites or flat lying areas)
Process route testing to prove up final products