Post on 28-Jul-2015
transcript
Contents
• FORCE Project Flow
• FORCE Working Principals
• FORCE Pilot Process
• FORCE vs. other technologies
• FORCE Reference Sites
• FORCE Patent & Performance
Test Results
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
Force Pilot Project process Flow
Initial Presentation
Analyzing Existing
Power Usage
(Electricity Bill & Main Panel Capacity)
Customer proposal, Pilot Contract signing and
Installing Power Saver
Gathering Power usage
Data (2 Months)
Savings Analysis/Review
Post Pilot Savings Presentation to
Customer
Customer Purchase and
Payment
Power Savings (15 yrs.)
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
FORCE working principals
Effects of harmonic distortion on existing system
◈ FORCE reduces the loss of electrons and stabilizes the Sine wave of current thereby adjusting harmonic distortion and high frequency and other conditions.
The 3rd,5th,7th,9th level of harmonic distortion -> causes electric leakage By installing FORCE ESS there is a 20~30% reduction of harmonic distortion Reduction of harmonic distortion alone will save between 1-5% of electrical energy consumption.
Before THD : 25.5% THD : 14.5%
Motor and generator
1. Overheating
2. Efficiency drop
3. Loss of power and pulse generation
4. Reduced life of the equipment
Transformer
1, Increase of self Resistance, Hysteresis
and Eddy Current Loss
2. Noise and Heat
3. Reduction of Capacity
Power Cable
1. Overheating
2. Generation of Corona
3. Reduction of Capacity
4. Distortion of temperance
Electronic condenser
1. Electronic Resonance
2. Poor insulation from high temperature
3. Shorter life time for Condenser
Electrical Energy Cost Saving
Reduction of Impedance
Improved Reactive Power
Harmonic Distortion
Adjustment
Reduction of Electricity
Leakage
After
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
FORCE working Principals (cont’d)
• The major material is EMF-7 which is made of Nano-sized mineral materials.
• EMF-7 has the special characteristic generating small amount of surplus negative electrons
through electro-chemical reaction.
• The surplus negative electron is introduced into the electrical system thereby stabilizing
electron balance. And increasing the electron density.
• The surplus negative electron (reduces electric cable’s resistance, 0.1mA) immediately
diminishes leakage, and harmonic distortion.
Internal Component and explanation of Power Saver
EMF-6: emission anion layer
EMF-7: emission subtle current layer
(produce electric/magnetic field)
Copper plate layer: part of ionization
electrification
FORCE working principals (cont’d)
Working Principal of FORCE
Surplus electron emission conditions
harmonic distortion and leakage
Surplus negative electron introduction
= Increase in electron balance,
Increases efficiency of system electron
transfer and flow.
FORCE working principals (cont’d)
Diminish Impedance; Improvement Principle
• Minimizes the power wasting by reducing Impedance. The value of I is influenced by R(Resistance) and the actual alternating
current electricity the value of Impedance give influence over the phase difference at the value of I and the alternating voltage.
• Impedance presents problems with the electron flow at alternating current circuit.
• As the complex number, the real income in part is the resistance and the imaginary quantity in part is reactance and is the
vector that can present the size as well as the phase.
• The complex number Z = R + 1/jwc + jwL (j is the imaginary number)
• In case of high frequency, the FORCE increases the phase gap of the load. The power saving system of FORCE reduces
resistance by the high speed surplus negative electron.
• The FORCE power saving system provides the stability and restores balance. The surplus negative electron is similar to a
special Task Force.
• Besides the electron wave of 50Hz~60Hz at the electric line, the various waves such as low frequency, extremely low
frequency, harmonic distortion and high frequency interrupt the sine wave which results in loss of efficiency.
• FORCE is an entirely new technology and is very different from current competing technology that are on the market which use
condenser, capacitors and transformers.
• The conducting resistance at the end load is reduced thereby diminishing the level of heat occurrence.
• FORCE affects the devices which cause Harmonic Distortion and High Frequency because of the EMI shielding effect of
FORCE elements.
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
FORCE Pilot Process
Before installation of FORCE
• Install Power Analyzer or Power Meter to Main or sub panel where FORCE is to be
installed and obtain all power consumption details such as Power Factor, Harmonics,
High/Low Frequencies, KW, KVA, etc. for a period of two weeks. This is very important for
final comparison as well as FORCE product size determination.
• All of the information obtained will be converted into excel format to easily generate
graphs, source data is never changed and will always be available to Customer.
After installation of FORCE
• Install FORCE and Power Meter to same panel as described above.
• Obtain all power consumption details such as Power Factor, Harmonics, High/Low
Frequencies, KW, KVA, etc. for a period of two months.
• All of the gathered information is converted into excel format to easily generate
graphs
• Compare all the data gathered by Power Meter before and after installing FORCE and
generate graphs for easy savings demonstration and explanation.
FORCE Energy Savings effect VS. other technologies.
Capacitor TVSS (SPD) AVR FORCE
Process Improving Power Factor
Controlling Equipment
overload
Protecting against
equipment
overload
Stabilizes system
through electron
generation
Savings Type Capacitor Built In Inverter Voltage Drop Power
Connection Parallel Serial Serial Parallel
Voltage Drop No Yes Yes No
Reactive Power Improved Improved None Improved
Active Power None Reduced Reduced Reduced
Weakness Fails Easily, negative side
effects such as harmonic
distortion, high
frequency, buzzing noise
Additional Expense
required, high failure rate,
high maintenance costs
Extremely Unsafe,
damaging to loads
and fires can also
occur
N/A
Lifetime 2-5 Years 5-10 Years About 7 Years Over 15 years
Savings 2% to 3% 2% 1% to 2% 5% to 20%
PERFORMANCE TESTED AND SAVINGS
PROVEN BY TWO INDEPENDENT
LABORATORIES. SGS GLOBAL AND TUV,
DETAILED REPORTS ARE AVAILABLE
UPON REQUEST.
FORCE Reference Example
Sector: Industrial
Details: Total Install
Installed capacity : 400kw
Energy Savings Rate : 10.88 %
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
FORCE Reference Example
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
• Sector: Education• Details : Partial Install• Capacity : 200kw• Energy Savings Rate : 12%
Parallel connected at R.S.T.N phase.
FORCEs inside switch panel.
FORCE Reference Example
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
• Sector: Industrial• Details : Partial Install• Capacity : 500kw• Energy Savings Rate : 7.83%
FORCE Reference Example
• Sector: Housing• Details: Partial Install• Capacity: 1,000kw• Energy Savings Rate:9.02%
Parallel connection at
R.S.T.N phase.
TR 1 -500 kva TR 2 -500 kva
Place units inside
switching box.
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
FORCE Reference Example
• Sector: Retail Shopping• Details: Total Install• Capacity : 1,000kw• Energy Savings Rate: 18.59%
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
Additional FORCE Reference Sites
Sector When Capacity Efficiency Sale type
Gas station 2007.09.15 20kw 11.06% Finance
Printing 2007.11.08 200kw 7.43% Purchase
Manufacturer 2007.02.28 100kw 14% Purchase
MART 2007.11.22 20kw 10% Finance
Manufacturer 2007.12.04 75kw 13.6% Finance
Restaurant 2008.05.03 30kw 11.6% Purchase
Restaurant 2008.05.09 30kw 12.1% Purchase
Manufacturer 2007.11.17 400kw 14.45% Purchase
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
Total FORCE Sites-By Industry Type (Over 700 installations completed worldwide)
8.9% 3.2%
15.4%
9.9%
14.7%
10.2%
Manufacturing Industry 10.9%
8.1%
8.3%
Total
Education
Service Manufacture
Press Furniture
Casting/Welding
Food
Injection Molding
Others
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
FORCE Active Patents
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com
FORCE Performance Tests (Others Available)
※ Field Test Results -Electric Energy
Saving( % ) per each Transformers
TR-1 : 11.3%
TR-2 : 4.5%
TR-3 : 6%
TR-1 (Before) TR-2 (Before) TR-3 (Before)
TR-1 (After) TR-2 (After) TR-3 (After)
8044 Montgomery Rd. Suite 700/ Cincinnati, OH 45236/ ray.barnes@completelux.com