Green Energy Prefab Homes and All

Post on 16-Apr-2017

2,762 views 0 download

transcript

Green Energy Worldwide Solutions Inc.

Presents Affordable Solutions

Affordable Solutions

=

Affordable Living

Green Energy Worldwide Solutions Inc.

Objective

1. Provide affordable housing solutions for poverty stricken areas, to make homes completely Energy Independent, and water dependent.

2. Seek and assist those in need of our program

Social Solutions, S.A.Type of Organization:

• Fabricators and designers of kits for homes • Kits are manufactured in our strategically

located plants

• Our product has been designed to meet requirements of social housing and emergency aid programs

Fiber CementExclusive advanced technology developed

and patented by Plycem®Consists of Portland cement, mineral fibers,

and other inorganic additivesLightweight material with manageability of

woodOf equal to or greater strength than

constructive cementSample:

Fiber Cement Cont.Structure passes general building codes

Standard Designs resist category 3 hurricane force winds

Optional Designs can withstand impacts up to category 5 hurricane force winds

Resistance against termites, fire, asbestos, and bacteria

Customer Benefits

Conscious of limited resources. Completely Energy Independent, and water dependent

Alleviates housing needs of areas of little or no resources

Social Impact

Quality EconomicEnergy Independent

Production Flexibility

Product AdvantagesVariety in panels adapt to different housing needsSimplicity and speed of constructionNo need for expensive equipment and man power

specialistEconomical construction and maintenanceQuick AssemblyCompletely Energy Independent, and water

dependent

Advantages Cont.

Designs are comfortable, functional, and allow for future expansions

Can use workers of little or no experienceCreates many job opportunitiesWe offer training and supervisionHigh quality products for a fraction of the

cost

Assembly Sequence and Times

•Build frame

•Installation of the pipes

•Installation of the barrier steam

•Installing the Mayan electro-welded

Day 1

Day 1

•Pouring of concrete •Leveling and finishing of floor plate •Showing rails basis

Day 2

Day 2

Installing rails basisInstalling rails basisFiber cement

Finish Concrete

Plate Concrete

Screws Anchoring Bolts

Anchoring

Riel Base

•Building of steel structure•Installation of walls•Installation of door(s) and window frames•Installation of the water network•Installation of interior walls

Days 3 & 4

Steel Structure

Armed Walls

Union Corners

Unions Walls

Union Walls (View Court)

Install Walls

Days 3 & 4

•Installation of power source•Mounting of steel girders•Installation of roof

Day 5

Day 5Support higher

Day 5

Day 5

Roof completely installed

Roof of Fiber cement

•Installation of interior walls•Installation of bathroom accessories

Day 6

Day 6

•Interior and exterior painting•Cleanup work

Day 7

Green Prefab Model A 505Sf.

Green Prefab Model B 753Sf.

Green Prefab External walls

Green Prefab Internal Living Area

Green Prefab Internal Kitchen Area

Green Prefab External doors

Final Notes

Our system of industrialized construction will be designed, manufactured, and supplied in full.

The shipment will be made in "container" closed or open, loose way or another depending on the port facilities.

The materials and equipment will be provided with new and relevant specifications and drawings.

The company sends qualified personnel to supervise and train in the development of the houses. Please free to contact us for more information.