Finalized TX/RX Board Design Ordered TX/RX Boards from Express PCB Ordered Passives, VCSEL, and PD Soldered components Tested TX/RX Aggressive and Non-

Aggressive Revised Gantt Chart Published Midterm Report

TX/RX Board Design

Aggressive DesignStandard Design

PCB Board – Solder Side

PCB Board – Ground Plane

PCB Board – VCSEL, PD, Passives

PD Hamamatsu S5973VCSEL Lasermate

Hamamatsu S5973

PCB Board – Soldered Components

PD

VCSEL

TX/RX Test Results

Initial Tests Revealed no power to TX chips. Board was getting hot.

Found solder link between power and ground, etched it out.

Retested and obtained decent eye results using the probe. (VCSEL not attached yet)

TX/RX Test Results – using probe

TX/RX Test Results

Received visible eye on Agilent osciliscope.

TX/RX Test Results

RX board powered up, chips receiving power Aligned fiber using XYZ stage in lab No signal from the SMA connector Tried to detect signal with probe, no luck

TX/RX Test Results

Using the XYZStage to align The fiber and PD

Future Plans

Solder VCSEL and test today Test PD separately to double check pins/light

detection Pray

Jan F e b M arch Ap ril

Pro je ct Ste p s: 1 -10 11 -2 0 21 -3 1 1 -10 11 -2 0 21 -2 9 1 -10 11 -2 0 21 -3 1 1 -10 11 -2 0 21 -3 0

ba ckg roun d resea rch (Jan 8 - Ap r 13 )

test eva l boa rd (F eb 5 - F eb 11 )

O p tica l lin k b udge t (F eb 10 - F e b 19 )

C hoo se pa rts (F eb 1 1 - F e b 19 )

O rde r VC SEL /PD 's (F e b 19 -F eb 2 5 )

Bu ild test boa rd (F eb 1 3 - F e b 20 )

D esign Sche ma tic (F eb 1 5 - F eb 22 )

Boa rd des ig n (F eb 19 - Ma rch 2 )

D esign rev iew (F eb 26 - Ma rch 4 )

O rde r PC B's (Ma rch 5 - Ma rch 14 )

Sp r ing Bre ak (Ma rch 5 - Ma rch 1 4 )

C onstruct Boa rd (Ma rch 14 - Ma rch 21 )

Tes t ing/Troubles hoot ing (M arc h 21 - M arc h 28)

D esign Mo d ifica tions (Ap r il 1 - Ap r il 7 )

Bu ild second boa rd (Ap r il 7 - Ap r il 1 3 )

F in a l re po rt (Ap r il1 3 - Ap r il 21 )

T est (F eb 5 )

Mid te rm R ep o rt (Ma rch 19 )

F in a l R e po rt (Ap r il 2 1 )

Group 2 Gantt Chart - 1 Gbps Optical Ethernet

Pro jected T imeC omp le tedO ve rd ue

Even t