The Kings CE School Redevelopment Project Update 20th March 2015
Dear Local Residents, Parents & Staff,
Update on the landmark redevelopment of The Kings CE School, Kidsgrove.
The new 3 storey school building with state of the art facilities will greatly enhance the educational
opportunities of the young people of Kidsgrove and surrounding areas.
Key features include:
Modern hall with retractable theatre
style seating;
Open plan learning resource centre
overlooking spacious dining facilities;
Specialist teaching rooms for all
subjects including 6 new science labs;
Purpose built vocational facilities including:
Modern bistro and training kitchen, hair and beauty salon, construction yard, media studio;
New and improved playing fields on site and hard play area;
Outstanding ICT facilities : Full WiFI/wireless and specialist ICT rooms;
Areas open for Community Use including new sports hall, ICT rich rooms, dance studio;
Dedicated 6th form facilities including social areas, space for independent learning and
seminar rooms;
Extensive new car park facilities and drop off loop for parents and buses for added safety;
Disabled access to all areas, including new ramps across the site.
The redevelopment will provide students with a prestigious school fit for the 21st Century.
This newsletter is the first of a number of regular updates on the project. Please turn over for
further information on the start of works and how Interserve Construction is working hard to have
a positive impact on the local community throughout the scheme.
The project received planning
permission in December 2014
and Interserve will be commencing
enabling works immediately. The
existing top / upper school will
be demolished first to enable
the new building to be
constructed and opened in
2016.
We are working closely with
both the School and Kidsgrove
Sports Centre throughout the
project to avoid disruption. Fencing
will be erected around the site and
pedestrian routes will be maintained
through the school site and to the Leisure Centre. Deliveries will be arranged outside of peak drop
off times and be controlled by a banksman / gateman. As with all construction works there will be a
higher volume of large vehicles than you will be used to, but this will be carefully managed. Apologies
in advance for any inconvenience this may cause.
We are committed to ensuring that we have a positive effect on the local community so if you have
any queries please do not hesitate to call me or email the details below.
The project will be registered with Considerate Constructors and we will be undertaking a range of
work experience, apprentices and charity work throughout. If you have any ideas or requests please
get in touch. Thank you & please look out for regular updates throughout the project,
Matt Lakin, Interserve Construction Project Manager.