ILLUSTRATIONS
REPAIRING OF STRUCTURES AVINASH KUMAR GUPTA
TRAINING INSTITUTE
CCW AIR
APRIL 2017
Strengthening Of columns
• Section Enlargement by jacketing.• Apply specified bond coat on existing column.• Bond coat of sunepoxy 368• M-25 or higher grade of concrete.
Strengthening of Beams• Section enlargement with micro concrete• Shotcrete self compaction concrete• Increased flexure strength by enlarging
compression zone and additional reinforcement in tension.
• Increased shear strength by fixing of stirrup with epoxy and quartz sand mortar as specified.
• MS Plate bonding• High strength fiber fabric wrap technique.
Strengthening Of Slab
• Provide overlays in case of negative moment deficiency.
• Provide underlay in case of positive moment deficiency.
• Increase in stiffness and control of deflection.• Slabs are safe in shear.
STICHING of walls/slab cracks
• Concrete and masonry weak in tension.• Crack indicate tensile failure of material• Insert U shaped MS bars in the holes and span
across the crack.• Grouting the holes with either epoxy or non
shrink grout.(non moving cracks)• Active cracks are to be filled with flexible
materials like poly- sulphides, bituminous fillers.
BEAM AND COLUMN REPAIR BYGUNITE/SHOTCRETE
TREATMENT OF DEPRESSED FLOOR IN TOILET/KITCHEN
• Remove all materials and expose the pipes.• Test the water supply pipes and drainage pipes
for leakages using pressure applying methods.• Provide 40 mm dia GI spout and CC sloped
flooring with water proofing compound. • Provide 12 mm thick cement plaster (1:3) with
water proofing on the vertical walls • Provide two coats of bitumen(85/25)in the
sunken portion.
Column Beam Junction
Repairs at Beam column junction
Beam Column Junction
COOROSION IN BARS .RCC STRUCTURE
CORODED BARS REPAIR• Remove all defective concrete and expose
corroded reinforcing bars to their full circumference.
• Remove the corrosion from the bars until the shine.
• Apply anti corrosive protective passivating coat to protect re –bars.
• Patch with repair mortar or concrete and resurface to required thickness.
• Apply protective coating and follow up with decorative painting.
JACKETING
Column repairs
GROUTING
Beam Strengthening
REPAIR STRATEGY
• Remove all unsound concrete at spalled ,cracked and hollow sounding areas.
• Expose the full corroded rebars to further depth.• Remove corrosion by approved manual method
or by sand blasting.• Treat rebars by a passivating material.• Shotcreting, microconcreting• Curing and top coat of alkyd to prevent ingress of
deleterious gases.
Beam Repairs
CRACK FORMATION, IDENTIFY THE CAUSE
Brick wall Column Junction
Jacketing upto foundation level
Over Head Tank repair
Bridge Repair
Roof Repair
Water proofing of roofs
• Remove existing treatment.• Number of rain water pipes to be increased.• Mark surface cracks. Inject polymer modified cement
slurry through nipples along crack lines.• Regarding.• Apply two coats of polymer modified cement slurry
with 20% polymer.• Apply 20 mm thick polymer modified non shrink
cement plaster with 300 X300 square thread identation.
• Curing and ponding to check adequacy.
FILLING CRACKS
Filling Cracks
Basement Repair
Leak Reapair , Rubber based polymer
DOME REPAIR
DOME REPAIR, External surface
• Remove old plaster.• Fix grouting nipples and inject cement based
non shrink slurry.• Provide first layer of Ferrocement.• Lay second layer and level upto required level.• Cure for 14 days.• Apply anti carbonation treatment in two
layers.
Dome repair , Internal surface
• Remove old plaster and clean joints wth brushes.• Remove corroded steel and replace it.• Pack with non shrink concrete.• Repack all exposed masonry joints with non
shrink cement sand mortar. Pressure grout with nozzles at the dome junction with bottom drum.
• Provide specified layer of ferrocement.• Cure for 10 days • Apply two coats of polymer cement water
proofing.