INDIAN RAILWAYS...INDIAN RAILWAYS NEW RAILWAYS A progressive journey since 2014 Developmental Works...

Post on 14-Mar-2020

1 views 0 download

transcript

INDIAN RAILWAYS

NEW RAILWAYS

A progressive journey since 2014

Developmental Works - Some Glimpses

Amrit Counter (Baby feeding room) at Bhopal stationATVM installed at Bhopal station

Green Initiative : Solar panel at Bhopal DRMs’ office Painting at Bhopal Station

Water vending machine at Bhopal station High capacity water cooler at Bhopal station

MADHYA PRADESH ON FAST TRACK DEVELOPMENT : 2014-PRESENT

INFRASTRUCTURE ENHANCEMENT :

v New line Projects : New line projects of 521 Kms for 8,642 crore `

sanctioned since 2014

v Doubling Projects : Doubling projects of 1,720 Kms for 18,395 crore `

sanctioned since 2014

v Electrification Projects : Electrification projects of 2,539 Kms for 2,222 `

crore sanctioned since 2014

v Rail Fly Over Projects : Rail flyover projects of 56 Kms for 1,046 crore `

sanctioned since 2014

MADHYA PRADESH CONNECT : PASSENGER FOCUS

v New Trains : 67 new trains introduced since 2014

v Trains Extended : 39 train extended since 2014

v Frequency Increased : for 12 trains since 2014

SAFETY : PRIME CONCERN

v Use of drone by WCR in Madhya Pradesh is first in India for disaster

management, crowd management and project monitoring etc.

v Use of GPS Tracker by WCR in Madhya Pradesh is first for India.

PASSENGER AMENITIES : PROVIDED AT ALL MAJOR STATIONS

v Lifts and Escalators

v Fast and free Wi-Fi facility :

v Automatic Ticket Vending machines

v Amrit Counters

v Mechanized Cleaning

v Water Vending machines

v LED Lights

Developmental Works - Some Glimpses

Symbol of women empowerment Women crew in Bhopal division

Inauguration of Wi-Fi facility at Bhopal station

ROB near Habibganj station Painting at Bhopal Station

Women help desk at Bhopal station Automatic Napkin vending machine at Bhopal station

WORKS COMPLETED IN LAST FOUR YEARS

Infrastructure Enhancement

Name of Project Cost (in Crore)

Mandideep-Misrod-Habibganj-Bhopal-Up gradation of facilities at level crossing 1.1`

e.g. improvement in surface, gradient, gate lodges and other facilities.

Between Bhopal-Itarsi station-Construction of rooms to keep S&T equipment used 0.1`

for operation in midsections.

Bhopal-Provision of standard height gauge at level crossing to improve the safety for 0.24`

road and rail user.

Bhopal-Bhadbhada-Sanchi-Vidisha-Sorai-Construction of rooms for installation 0.51`

of interlocking system of level crossing gates.

Bhopal-Provision of rubberized surface on level crossing to provide more durable 0.22`

surface and to improve safety on level crossings

Trippling work in the year 2015-16 from Bhabhadha to Nishatpura (Kms 16.70) 83.50`

Electrification of Trippling work in the year 2015-16 from Bhabhdha to Nishatpura 15.690`

(Kms 16.70)

One ROB near LC 248 (Habibganj Naka) � 81.5

New Train Introduced

Train No. Name of The Train From-To

22163/22164 Mahamana Exp. Daily Bhopal to Khajuraho

22165/22166 Bhopal – Singrauli Exp.02 days Bhopal to Singrauli

61633/61634 Bhopal-Bina Memu Daily Bhopal to Bina

14319 / 14320 Indore-Bareily – Indore weekly Exp. Indore to Bareily

09309/09310 Indore–Sealdah-Indore weekly special Indore to Sealdah

09305/09306 Indore-Patna-Indore bi-weekly special Indore to Patna

09307/09308 Indore–Jammu Tawi- Indore weekly special Indore to Jammu Tavi

19332/19331 Indore –Kochuveli - Indore Express Indore to Kochuveli

9305/19306 Indore-Guwahati-Indore Express Indore to Guwahati

A.

B.

Train Extended/Frequency Increased

Train No. Name of The Train Extended/Frequency

12002 New Delhi-Bhopal Habibganj

22415 Vishakhapatnam-New Delhi Tri-weekly to Daily

12001 Bhopal-New Delhi Habibganj

22416 New Delhi-Vishakhapatnam Tri-weekly to Daily

19325 /19326 Indore–Amritsar Express weekly to bi-weekly

11103 /11104 Indore –Bandra Terminus Express weekly to bi-weekly

11703 / 11704 Rewa – Indore Express Dr. Ambedkar Nagar

C.

INPUTS BY RAILWAY IN BHOPAL PARLIAMENTARY CONSTITUENCY

BHOPAL PARLIAMENTARY CONSTITUENCY ASSEMBLY SEGMENTS:

Berasia , Bhopal Madhya , Bhopal Uttar , Govindpura, Narela , Huzur , Bhopal Dakshin-Paschim , Sehore

Other Works Planned

Brief description of work* Cost (in Lakh)

Road Over Bridge in lieu of Level Crossing 247 between Misrod and Habibganj 4277`

Road Over Bridge in lieu of Level Crossing 249 in Bhopal city. 4876`

Road Over Bridge in lieu of Level crossing 250 in Bhopal city. 5247`

Road Over Bridge in lieu of Level crossing no 255 between Nishatpura and 4326`

Sukhisewaniya.

Road Over Bridge in lieu of Level crossing no 256 near Sukhisewaniya station. 5678`

Road Under Bridge in lieu of Level crossing no 245 between Mandideep 245`

and Misrod station.

Misrod-Habibganj-Sukhisewania-Provision of standard height gauge at level 21`

crossing to improve the safety for road and rail user.

LC No. 245 to 256- Between Mandideep-Sukhisewania station-Provision of 24.4`

toilets and other facilities at level crossings.

B.

WORKS IN PROGRESS : PASSENGER AND OTHER WORKS

Passenger Amenities Planned at Stations

Facility/Amenity Planned * Cost (in Lakh)

Redevelopment of Bhopal station with provision of new station building on PF No. 1 `2500

Provision of new station building on PF No. 6 with relocation of booking office `558

Redevelopment of Habibganj station with world class facilities through PPP mode `60,000

Bhopal- 02 Nos. Escalator to be provided for movement of passengers. 100`

Bhopal- 01 No. Lift to be provided for movement of passengers. 22`

Bhopal-Upgradation of Area Training Centre. Located at Habibganj. 298`

Three lifts at Bhopal station, two escalator at Bhopal station. 80`

Provision of Foot over Bridge at Sukhisewaniya station. 216`

Automatic ticket vending machine at Sant Hirdaram Nagar (Bairagarh) `4

Water vending machines at Habibganj station `24

Cab parking and booth facility at Bhopal station

Bhopal :--New FOB 5.00 meter wide across the platform, sky walk at 1356`

Bhopal Station

Provision of 10 line true colour outdoor LED display boards outside station 205`

building of Bhopal station on PF-1 & 6.

Provision of escalators & lift on various platforms of Bhopal station and 500`

proposed station building

3 ROBs on Itarsi- Bhopal section (at LC 247, 249, 250), 2 ROBs at LC 255, 256 `244

on Bhopal Bina section and 1 RUB at LC 245 on Itarsi- Bhopal section

A.

Stoppages Provided

Train No. Name of The Train Stoppages

14319 /14320 Indore-Bareilly Express Bhopal

15029/15030 Gorakhpur-Pune Express Bhopal

12597/12598 Gorakhpur – Mumbai (CSMT) Express Bhopal

22122/22121 Lucknow –Lokmanya Tilak Terminus AC SF Express Bhopal

22126/22125 Amritsar – Nagpur AC Express Bhopal

16864/16863 Mannargudi – Bhagat Ki Kothi Express Bhopal

11079/11080 Lucknow –Lokmanya Tilak – Gorakhpur Express Bhopal

11407/11408 Pune – Lucknow Express Bhopal

18243/18244 Bilaspur to Bhagat Ki Kothi Express Bhopal

18245/18246 Bilaspur to Bikaner Express Bhopal

15063/15064 Gorakhpur to Lokmanya Tilak Terminus Express Bhopal

15065/15066 Gorakhpur to Panvel Express Bhopal

15067/15068 Gorakhpur to Bandra Terminus Express Bhopal

22705/22706 Tirupti – Jammu Tawi Hamsafar Express Bhopal

11203/11204 Nagpur – Jaipur Express Bhopal

22415/22416 Visakhapatnam – New Delhi SF Express Bhopal

D.

Road Over/Under Bridges Constructed

Location of Road Over Bridge/Road Under Bridge Cost (in Crore)

Road Over Bridge in lieu of LC No. 248 near Habibganj 81.50`

E.

Passenger Amenities Provided at Stations

Facility/Amenity* Cost (in Lakh)

Bhopal- Coach guidance system at PF No. 1,2,3,4,5 & 6 96 `

Bhopal- 5 Line Train Timing display boards(2) 18`

Bhopal- GPS Clocks(6) 1.32`

Bhopal- Touch Screen based Passenger Operated Enquiry Terminal (POET)(1) 1.0`

Bhopal- Provision of LED lights at station's platforms. By this provision 15.30 `

we save the energy and found better illumination.

Bhopal- Provision of 400 Lts High capacity water cooler for drinking water 18.29`

Bhopal- 04 Nos. lift provided for up and down movement of passengers. 88.00`

Bhopal- 02 Nos. Escalator provided for movement of passengers. 60.00`

Bhopal- 240 KWp solar plant installed at BPL station.Under PPP model

Bhopal - Setting up of departmental mechanized laundry for linen cleaning 195.00`

Shifting of Parcel office in old goods shed at Bhopal station. 64.00`

Bhopal -Toilet for physically handicapped persons on Platform No.2/3 , 4/5 and 6. 8.00`

Habibganj -Provision of Bio-toilet on platform No.4/5. 8.00`

Bhopal -Standardization of height and surface improvement of Platform No.1 99.00`

Bhopal – Renovation of one dormitory, provision of Eight nos. 2.0 Ton Split AC 5.00`

at 1st Class waiting room of Bhopal & provision of Two nos. 2.0 Ton Split AC in

1st Class Waiting Room at Habibganj station.

F.

Passenger Amenities Provided at Stations

Facility/Amenity* Cost (in Lakh)

Bhopal and Habibganj stations Total 508 Nos. LED lights are provided for better 43.00`

illumination and energy saving.

Bhopal -Improvement to east side circulating area by shifting of GRP thana 157.00`

Bhopal – 2 Escalators working from July 2016. 94.00`

Reservation window at TatyaTope Nagar Post Office Bhopal 5.00`

24 Nos.drinking water cooler at Bhopal station. 15.00`

Improvement of sheets of cover over sheds on all platforms and 195.00`

circulating area of Bhopal station.

Provision of Cover over platform and other passenger amenities work 198.00`

for new Platform No.6 Bhopal Station.

Provision of passenger amenities at Bhopal station. 150.00`

Replacement of washable apron at platform No.1 at Bhopal. 99.00`

Replacement of washable apron at Platform No.3 at Bhopal station. 180.00`

Improvement of platform surface at Itarsi end on platform No.2 48.00`

along with toilet of waiting hall at Habibganj station.

Provision of Cover over platform and small shelter at platform 40.00`

no.6 at Bhopal station

Washable apron on platform No.2 at Habibganj station. 105.00`

Washable apron on platform No.3 at Habibganj station. 220.00`

Washable apron on platform No.4 at Habibganj station. 220.00`

Reservation window at General Post Office Bhopal 5.00`

Reservation window in Defence area at Military station Bhopal 5.00`

Additional FOB at Itarsi end at Bhopal station. 506.00`

02 lifts at Bhopal station working from dt. 20.4.16 and dt. 13.07.2017. 44.00`

2 Nos. drinking water cooler of 400 ltr. high capacity at Habibganj. 1.30`

01 Travalator at Habibganj station. 35.00`

02 lifts at Habibganj station on second entry side. 44.00`

02 lifts at Bhopal station in April 2018. 44.00`

Habibganj - Extension of Carriage Watering Pipe line upto the extended 34.99`

portion of platforms to 24 coach length.

Water Filtration System at 'D' & 'E' category Railway stations under

CSR by M/s.YES Bank Ltd, Mumbai.

Electronic train enquiry system at Bhopal station `3.5

High speed Wi-Fi internet facility at Bhopal station

Provision of 223 benches at Habibganj and Bhopal stations through `19.70

MPLAD scheme.