Installation of RMG Cranes at Rail Intermodal Yard · Installation of RMG Cranes at Rail Intermodal...

Post on 29-Mar-2020

5 views 0 download

transcript

Building on the Past, Respecting the Future

Installation of RMG Cranes at Rail Intermodal Yard

Building on the Past, Respecting the Future

Installation of RMG Cranes at Rail Intermodal Yard• Planning & Conceptual Design

– Travel Routes and Gate Operations– Trucks, Trains and Cranes– Rail Mounted Gantry Cranes– Building Green– Planning for the Future

• Design– Crane Rail Foundation– Crane Rail

• Construction– It’s Not a Problem, Its an Opportunity

Building on the Past, Respecting the Future

• Travel Routes and Gate Operation

Truck Travel Time Surveys

Planning & Conceptual Design

0

5

10

15

20

25

30

Route 1 Route 2 Route 3 Route 4

Trav

el T

ime

in M

inut

es

Outbound

Inbound

Building on the Past, Respecting the Future

Planning & Conceptual Design• Trucks, Trains and Cranes

Building on the Past, Respecting the Future

Planning & Conceptual Design

Stripping and Stacking RMG’s

• Rail Mounted Gantry Cranes

Building on the Past, Respecting the Future

Planning & Conceptual Design

Stacking RMG’s

• Rail Mounted Gantry Cranes

Building on the Past, Respecting the Future

Planning & Conceptual Design• Building Green

Green Project

Elements

Recycled Concrete as

Base Material

No Diesel Emissions

Regeneration of Power

Noise Reduction

Operational Efficiency/Yard Densification

Automated Gate System

Building on the Past, Respecting the Future

Planning & Conceptual Design• Planning for the Future

Ultimate Build-Out Concepts

What if Scenarios

Next Generation Equipment

Automated Gate Systems

Building on the Past, Respecting the Future

Design

• Crane Rail Foundation• Crane Rail

Design Specific to RMG Cranes

• Traffic control• Facility operations• Storm drainage• Geotechnical issues

Critical but not specific to RMG Cranes < Not Covered>

Building on the Past, Respecting the Future

Design• Crane Rail Foundation

Building on the Past, Respecting the Future

Design

Existing Soil Design

2ft of mediumdense sand

2ft of soft to stiff clay

Remainder is soft to loose,wet sand, clay and silt

Crane Beam3ft of crane beam6in of 1 ¼” minus18in of recycled conc6in of 1 ½” minus24in of quarry spalls

Coeff of subgrade reaction = 135pci

Asphalt3in of HMA top course4in of HMA base course6in of top course12in of base course

Superpave mix design

•Crane Rail Foundation•Geotechnical Investigation

Building on the Past, Respecting the Future

Design• Crane Rail Foundation

– Seismic Analysis

Building on the Past, Respecting the Future

Design• Crane Rail Foundation

– Loads and Load Combinations

23klf DL+LL

37klf DL+EQ18klf DL+LL31klf DL+EQ

8klf DL+EQ2klf DL+LL

Crane rail foundation design loads

Building on the Past, Respecting the Future

Design• Crane Rail Foundation

– Required Tolerances; ISO 12488 Cranes – Tolerances for wheels and travel and traversing tracks

Tolerances for Crane Rail Installation and In Service

Building on the Past, Respecting the Future

Design• Crane Rail Foundation

Typical Section of a Crane Rail Foundation

Building on the Past, Respecting the Future

Design• Crane Rail

– Continuous– Flash Butt Welding– Soleplates and Clips– Head Hardened– Epoxy/Cementitious Grout– Installation Tolerances

Building on the Past, Respecting the Future

Construction

Building on the Past, Respecting the Future

Construction

Building on the Past, Respecting the Future

Installation of RMG Cranes at Rail Intermodal Yard