IntegRail presentation

Post on 27-Mar-2016

213 views 0 download

Tags:

description

IntegRail presentation 2013

transcript

IntegRail in 2013 Great opportunities

IntegRail Integrated Rail Services

H-2045 Torokbalint Depo - HUNGARY

Friday, February 1, 13

IntegRail and its management

Torokbalint ContainerTerminal

IntegrailRailway Operator

Laszlo GROSZManaging Director

Robert BOLDIManaging Director

Gyorgy FIRBASBusiness Development

Friday, February 1, 13

The core services of Integrail

• Integrated Railway Service Provider. Offering Door to Door service as a B2B logistic service provider.

• CTR haulage between Port and inland Terminals ( Koper - Törökbálint )

• Conventional rail cargo in CEE

• Project cargo services ( oversized, overweight, special handling )

• Customs services, forwarding, clearance, formalities

Friday, February 1, 13

Current Network 2012

Hamburg

Trieste

Munich

Koper

Budapest

Friday, February 1, 13

Adriatic Network

• 4 loading windows in Koper port: 2 WED / 1 THU / 1 SAT

• Traction availability for 4 roundtrips per week between Koper, Slovenia and Budapest, Hungary

• 2 WED loading windows designed for import VIP account i.e. Samsung and Huawei

• THU / SAT loading windows designed for general cargo and 3rd party customers

• Final deliveries to Hungary, South Slovakia and West Romania by truck

• Planned service between Rijeka Port HR and Budapest, Hungary

Friday, February 1, 13

Törökbalint TerminalBudapest, Hungary

Friday, February 1, 13

Terminal Facts - Budapest• Tracks the length of trains

• Proximity to primaryroad infrastructure

• Highly frequented connections

• Deposit area for loaded containers

• Integrated empty container depot

• Deposit area for hazardous goods

• Connection for refrigerated containers

• IT integration

• Delivery companies firmly established in the region

Friday, February 1, 13

Number of trains in Q4-2012

0

10

20

30

SEP ‘12 OCT ‘12 NOV ‘12 DEC ‘12 JAN ‘13

21

15

191920

Train

s pe

r dire

ctio

n

Facts ( JAN ’13 projected ) Contracted Capacity

Friday, February 1, 13

Train utilization in Q4-2012

0

25

50

75

100

SEP ‘12 OCT ‘12 NOV ‘12 DEC ‘12 JAN ‘13

9999989899%

Friday, February 1, 13

Punctuality in Q4-2012

0

7.50

15.00

22.50

30.00

SEP ‘12 OCT ‘12 NOV ‘12 DEC ‘12 JAN ‘13

1.60.751.81.751.2

2020202020

Koper Railway Station - Budaors Railway StationHo

urs/

Train

Scheduled transit time Delays ( JAN ’13 projected )

Offered 24 hrs transit time

Friday, February 1, 13

Thank you for your kind attention! January, 2013

Friday, February 1, 13