Project Schedule:

Design Schedule: Aug 2013 – Dec 2013 Bidding period: Jan 2014 Award for construction: Feb 2014 Construction: Feb 2014 – Aug

2014 Occupy new space: Aug 2014 - Sep

2014 Construction of breezeway: Jun 2016 – Aug

2016 (with construction of Osbourn HS ball fields)