Post on 01-Nov-2020
transcript
Sales Division / Apr. 2018
KHAN Reference List
CONTENTS
1. BROWNFIELD WORK
2. CARRY OVER WORK
3. HOOK-UP & COMMISSIONING
4. COMMISSIONING
5. MC (MECHANICAL COMPLETION)
6. MODIFICATION
7. PIPELINE / PIPE LAYING
8. MODULE FABRICATION
9. PRODUCT FABRICATION
10. POWER SUPPLY
11. ENGINEERING
12. CONTROL SYSTEM
13. RELOCATION SERVICE
3
* Reference Summary (1/2)
NO. CONTENTS PROJECT NAME
1 BROWNFIELD WORK 4
2 CARRY OVER WORK 9
3 HOOK-UP & COMMISSIONING 4
4 COMMISSIONINGCommissioning 43
51Commissioning Procedure 8
5 MC (MECHANICAL COMPLETION) 17
6 MODIFICATION 58
7PIPELINE 10
PIPE LAYING 14
8MODULE
FABRICATION
Aluminum Helideck 6
26
Aluminum Outfitting 4
Electrical Substation 2
Aluminum Warming Room & Toilet
House1
Derrick Assembly 11
Burner Boom Fabrication &
Construction2
4
* Reference Summary (2/2)
NO. CONTENTS PROJECT NAME
9 PRODUCT FABRICATION 1
10 POWER SUPPLY 2
11 ENGINEERING 79
12 CONTROL SYSTEM
Emergency Shutdown System (ESDS) 96
287
Ship Shore Communication Link
System (SSCLS)14
Trim and List Indication System (T/L) 96
Field Instrument 58
Fire and Gas Emergency Shutdown
System (F&G ESD System)2
Operating Manual for LNGC 21
13 RELOCATION SERVICE 122
Total 684 References Listed
* Projects are listed in the order of the most recent delivery.
5
1. Brownfield Work
NO.PERIOD
CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Oct. 2017 OngoingPOSCO
Daewoo
Myanmar SHWE MEG
Regeneration System Replacement
Disassemble of Old MEG Regenerator
Piping, Structure, Installation, Commissioning
2 June 2014 Oct. 2016 Chevron
Mafumeira Sul Project HUC,
On/Offshore Commissioning &
Start-up
Onshore Pre-Commissioning
Work Pack Development
Offshore Hook-Up Work
Commissioning Assistance
3 May 2015 Feb. 2016 ONHP
Prirazlomnaya OIFP
Offshore Ice-proof Fixed Platform
Revamping
Drilling Complex Modernization
Front-End Engineering Design
Equipment List Development
4 July 2012 July 2015 Chevron
Chevron EGP3B Production
Platforms Modifications &
Installation
Job Card Development
Design & Shop Drawing Review
Marine Engineering
Procurement
Hook-up and Commissioning
Mobilization of Marine spread
6
2. Carry Over Work
NO.PERIOD
OWNER CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Feb. 2016 Jan. 2018 Statoil TechnipMartin Linge
Carry Over Work Phase-2
Site Survey, Planning, Mobilization, Materials
Management & Procurement
E&I, Painting, Scaffolding, Insulation, Piping
2 May 2016 Dec. 2017Petronas
Carigali
UZMA
Engineering
Petronas Carigali
Kinanbalu NAG Phase-II
Gas Compressor Module
Carry Over Work
Job Card Development, Reviewing of Detail
Design & Shop Drawing / As-Built Drawing,
Onshore Fabrication, Procurement & Logistics
for Installation Works
3 Feb. 2017 Aug. 2017 StatoilKCA
DEUTAK
Statoil CAT-J Carry Over
Work Phase-2
Site Survey, Planning, Mobilization, Materials
Management & Procurement
E&I, Painting, Scaffolding, Insulation, Piping
4 Aug. 2014 July 2017 INPEXSBM
Offshore
INPEX Ichthys FPSO
Turret Carry Over Work
Phase-1, 2
Phase-1 : Work Pack & Job Card Preparation
Phase-2 : Supply of Nylon Pads, HVAC Ducting
Fabrication, Site Queries
5 Dec. 2015 June 2017 SHELLSBM
Offshore
SHELL Prelude FLNG
Turret Carry Over Work
Phase-1, 2
Phase-1 : Job Card Development, Project
Completion System, Material Preparation
Phase-2 : Execution of Work Pack & Job Card
(Planning / Scheduling / Mobilizing)
6 Sep. 2015 Dec. 2016 SHELL Technip
SHELL Prelude FLNG
MEG Module Carry Over
Work Phase-2
Site Survey, Planning, Mobilizing, Materials
Management & Procurement
Work Pack Development and Execution of
Carry Over Work Packs
7 July 2014 May 2016 BP HHIBP Clair Ridge Topside
Module Construction Work
FPSO & Platform Construction Work in E&I,
Pipe, Mech., Structure, Paint, Scaffolding,
HVAC
7
2. Carry Over Work
NO.PERIOD
OWNER CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY
8 Oct. 2013 Dec. 2015 BP HHIBP Quad 204 Turret Carry
Over Work, Phase -1, 2
Phase-1 : Site Survey, Work Pack
Preparation, Job Card Issue
Phase-2 : Execution of Work Pack & Job Card
9 May 2013 June 2013 BP BP
BP Quad 204 Water
Injection Pump Skids Carry
Over Work
Loading / Unloading, Installation / Assembly
Work, E&I, Piping, Machinery, Punch Clear,
Fabrication(Outfitting)
8
3. Hook-Up & Commissioning
NO.PERIOD
OWNER CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Mar. 2017 Dec. 2017Petronas
Carigali
UZMA
Engineerin
g
Petronas Carigali
Kinanbalu NAG Phase-II
Gas Compressor Module
Hook-Up & Commissioning
Onshore Preparation, Reviewing of Detail
Design & Shop Drawing / As-Built Drawing,
Onshore Fabrication, Procurement &
Logistics for Installation Works, Hook up &
Commissioning after Shut-Down Period,
Mobilization of Marine spread
2 June 2014 Oct. 2016 Chevron DSME
Mafumeira Sul Project
HUC, On/Offshore
Commissioning & Start-up
Onshore Pre-Commissioning, Work Pack
Development, Offshore Hook-Up Work,
Commissioning Assistance
3 Feb. 2016 May 2016 Petronas PBJVPetronas FLNG #1
Onshore Preparation
Providing Technical Knowledge,
Assistance on Development of Plans and
Procedures / Work Pack / Job Card
4 Oct. 2014 Apr. 2016 BP BP
BP Quad 204 & Clair
Ridge Onshore/Offshore
Commissioning
Electrical/Mechanical/Instrument and Control
Commissioning, Flushing and Cleaning,
Preservation Support
9
4. Commissioning
1) COMMISSIONING
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
1 Aug. 2016 Ongoing Japan Marine United JMU LNG LNG ship JMU (Japan)
2 Oct. 2015 Ongoing Seadrill West libra Drillship DSME
3 June 2015. Ongoing Seadrill West Aquila Drillship DSME
4 Apr. 2015 Ongoing Vantage Cobalt Explorer Drillship DSME
5 Mar. 2016 Apr. 2017 Mitsubishi Heavy Industries AIDA #2 Perla Cruise ship MHI
6 Feb. 2016 Feb. 2017 Maersk Invincible Drillship DSME
7 Mar. 2016 June 2016 ADMA-OPCO SARB Package 4 E-house KOSPEC
8 Oct. 2015 May 2016 Sonangol Sonangol Quenguela Drillship DSME
9 Aug. 2015. Mar. 2016 Songa Offshore Enabler #4 Semi-Rig DSME
10 June 2015. Mar. 2016 Sonangol Sonangol Libongos Drillship DSME
11 Mar. 2015 Mar. 2016 Mitsubishi Heavy Industries AIDA #1 Prima Cruise shipMHI (Nagasa
ki, Japan)
12 Aug. 2015. Dec. 2015 Songa Offshore Encourage Semi-Rig DSME
13 May 2015. Nov. 2015 Atwood Admiral Drillship DSME
14 Mar. 2015 Sep. 2015 Transocean Thalasse Drillship DSME
15 Apr. 2014 June 2015 Songa Offshore Equinox #1 Semi-Rig DSME
16 Apr. 2014 Sep. 2014 Diamond Offshore Diamond Ultra Deep–water Drillship #4 Drillship HHI
17 Jan. 2014 Aug. 2014 Noble Noble Drillship #4 Drillship HHI
18 July 2012 July 2015 Chevron EGP Phase 3B Platform Nigeria
10
4. Commissioning
1) COMMISSIONING
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
19 July 2013 May 2014 Exxon Mobil Arkutun DagiFixed
PlatformDSME
20 Nov. 2013 Mar. 2014 Diamond Offshore Diamond Ultra Deep –water Drillship #3 Drillship HHI
21 Nov. 2012 Feb. 2014 Fred Olsen Energy Fred Olsen Drillship #1 Drillship HHI
22 Jan. 2013 Jan. 2014 Atwood Advantage #1 Drillship DSME
23 Jan. 2012 Jan. 2014 Diamond Offshore Diamond Ultra Deepwater Drillship #1 Drillship HHI
24 Jan. 2013 Dec. 2013 Transocean Edward Drillship #1 Drillship DSME
25 May 2013 Sep. 2013 Diamond Offshore Diamond Ultra Deepwater Drillship #2 Drillship HHI
26 Jan. 2012 July 2013 Vantage Tungsten Explorer Drillship DSME
27 May 2012 Jan. 2013 Transocean GSF- High island Jack UpDRY DOCK
(Dubai )
28 Apr. 2012 Aug. 2012 KNOC Panama Zhambyl Rig ERSAI
29 May 201 July 2012 Corporative Grupo-R Grupo-R GVA7500 Rig DSME
30 Feb. 2012 Apr. 2012 Odebrecht ODN #2 Drillship DSME
31 June 2011 Apr. 2012 Odebrecht ODN #1 Drillship DSME
32 Jan. 2011 Apr. 2012 Vantage TMT 2 (Dragon Quest) Drillship DSME
33 Sep. 2010 June 2011 Technip H6001 OPS PLV STX Dalian
34 Oct. 2010 May 2011 Odebrecht NORBE IX Drillship DSME
35 Jan. 2011 Apr. 2011 SeaDrill West Pegasus Rig Jurong
36 Dec. 2009 Feb. 2011 Vantage Sea Dragon Rig Jurong
11
4. Commissioning
1) COMMISSIONING
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
37 Apr. 2010 Nov. 2010 Vantage TMT 1 (Platinum Explorer) Drillship DSME
38 Sep. 2009 Aug. 2010 Transocean Discoverer India Drillship DSME
39 June 2009 Mar. 2010 Transocean Discoverer Luanda Drillship DSME
40 Dec. 2008 July 2009 Transocean Discoverer Americas Drillship DSME
41 May 2008. Mar. 2009 Transocean Discoverer Clear Leader Drillship DSME
42 May 2008 Jan. 2009 Seadrill West Aquarius Rig DSME
43 Feb. 2008 Oct. 2008 Seadrill West Hercules Rig DSME
12
2) COMMISSIONING PROCEDURE
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
1 Apr. 2014 May 2016 STX MOG F1006 FSO STX
2 June 2012 Feb. 2014 DSME South Nemba Auxiliary Fixed Platform DSME
3 Sep. 2012 May 2013 DSME Allseas Pieter ScheltePlatform,
Pipe LayingDSME
4 Nov. 2011 Jan. 2013 DSME Heerema AegirPipe Laying
VesselDSME
5 Apr. 2008 Aug. 2008 Transocean Discover Americas Drillship DSME
6 Nov. 2011 July 2008 Odfjell Deepsea Atlantic Rig DSME
7 Sep. 2007 Mar. 2008 Transocean Discoverer Clear Leader Drillship DSME
8 Feb. 2007 Dec. 2007 Seadrill West Hercules/Aquarius Rig DSME
4. Commissioning
13
5. Mechanical Completion
NO.PERIOD
CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Dec. 2015 June 2017 SBM Shell Prelude FLNG Supervising of MCTopside / Hullside MC Inspection Completion,
Punch Control
2 Feb. 2015 June 2017 SHI / Shell Shell Prelude FLNG Punch Clearance Hull part Punch Clearance of E&I, Structure
3 Oct. 2016 Mar. 2017 Maersk Maersk XLE4 MC11 Work Packs including IT Equipment
Installation
4 Nov. 2015 Mar. 2017 Technip Technip Martin Linge Punch Clearance Pipeline QC inspection, MC of Piping Work
5 Aug. 2016 Oct. 2016 Transocean GSS Transocean Conqueror MC Cable Pulling & Sensor Installation
6 May 2016 Oct. 2016 KNPG Kinabalu KNPG MC MC Inspection Completion, Punch Control
7 July 2016 Aug. 2016 Diamond Ocean Great White MC F.O cable installation
8 Mar. 2016 June 2016 Songa Offshore Songa #2 Enabler Post Delivery Work 10 Work Packs including MC of Wire Line
9 Nov. 2014 June 2016 ABBElectrical Substation SARB Package 4
MCMC Inspection Completion, Punch Control
10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage Post Delivery Work 9 Work Packs including MC of Wire Line
11 Oct. 2015 Nov. 2015 Transocean Transocean_Thalassa MC MC of Wire line Tower & etc.
12 Oct. 2015 Nov. 2015 Maersk Maersk #3 Venturer MC Sea Fixing / Accumulator Rack Installation
13 Aug. 2015 Dec. 2015 Songa Offshore Songa #2 Endurance Post Delivery Work 8 Work Packs including MC of Wire Line
14 June 2015 Nov. 2015 BP BP Quad 204 Hydro Test & FlushingHydrostatic Test & Oil Flushing & Chemical
Clean
15 June 2015 Oct. 2015 Songa Offshore Songa #1 Equinox Post Delivery Work 8 Work Packs including MC of Wire Line
16 Oct. 2014 Dec. 2015 BP BP Quad 204 Topside PunchMC of ULL & Topside Lighting System /
R.P(240V) System
17 Oct. 2013 Nov. 2015 BP BP Quad 204 & Clair Ridge Punch Work MC of E&I, Pipe, Structure
14
6. Modification Work
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
1 Oct. 2017 Dec. 2017 RNT Transocean GSS Development Driller I Semi-Sub Las Palmas
2 Mar. 2017 Aug. 2017 Statoil Cat-J 1 & 2 Jack-up SHI
3 July 2016 Mar. 2017 Maersk Drilling XL Enhanced-4 Jack-up DSME
4 June 2016 Oct. 2016 Transocean Deepwater Conqueror Drillship DSME
5 Mar. 2016 Aug. 2016 Diamond Ocean Great White Semi-Sub HHI
6 Mar. 2016 July 2016 Songa Offshore Enabler Semi-Sub DSME
7 Dec. 2015 Dec. 2015 Transocean Proteus Drillship DSME
8 Sep. 2015 Nov. 2015 Transocean Thalassa Drillship DSME
9 Dec. 2015 Mar. 2016 Songa Offshore Encourage Semi-Sub DSME
10 Aug. 2015 Dec. 2015 Songa Offshore Endurance Semi-Sub DSME
11 June 2015 Oct. 2015 Songa Offshore Equinox Semi-Sub DSME
12 Oct. 2014 Apr. 2015 Maersk Drilling Voyager Drillship SHI
13 Feb. 2015 Mar. 2015 Ocean Rig Apollo Drillship SHI
14 Feb. 2015 Feb. 2015 Seadrill West Carina Drillship SHI
15 Mar. 2014 Nov. 2014 Seadrill West Saturn Drillship SHI
16 Sep. 2014 Sep. 2014 ODFJELL Deepsea Aberdeen Semi-Sub DSME
17 Sep. 2014 Sep. 2014 Seadrill West Jupiter Drillship SHI
18 Apr. 2014 Sep. 2014 Atwood Oceanics Achiever Drillship DSME
19 Mar. 2014 Sep. 2014 Seadrill West Neptune Drillship SHI
20 Mar. 2014 June 2014 Maersk Drilling Venturer Drillship SHI
15
6. Modification Work
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
21 Apr. 2014 June 2014 Noble Sam Croft Drillship HHI
22 Mar. 2014 June 2014 Maersk Drilling Valiant Drillship SHI
23 Mar. 2014 Apr. 2014 Ocean-Rig Athena Drillship SHI
24 Feb. 2014 Apr. 2014 Maersk Drilling Viking Drillship SHI
25 Jan. 2014 Feb. 2014 Atwood Advantage Drillship DSME
26 Jan. 2014 Feb. 2014 Ocean-Rig Skyros Drillship SHI
27 Oct. 2013 Nov. 2013 Seadrill West-Tellus Drillship SHI
28 Aug. 2013 Oct. 2013 Ocean-Rig Mylos Drillship SHI
29 July 2013 Aug. 2013 PDC Khamsin Drillship SHI
30 May 2013 June 2013 Vantage Drilling Tungsten Explorer Drillship DSME
31 Oct. 2011 Dec. 2012 Ocean Rig AS Ocean Rig Mykonos Drillship SHI
32 Apr. 2012 May 2012 STENA STENA DrillMAX Drillship SHI
33 Mar. 2012 May 2012 Vantage Drilling Vantage #2 Dragonquest Drillship DSME
34 Apr. 2011 May 2012 Ocean Rig AS Ocean Rig Olympia Drillship SHI
35 Nov. 2011 Jan. 2012 Odfjell Drilling AS Odfjell Deep Sea Metro II Drillship HHI
36 May 2011 Jan. 2012 Odfjell Drilling AS ODFJELL Deep Sea Metro I Drillship HHI
37 Sep. 2011 Oct. 2011 Korea National Oil Company Doo Sung Rig Semi-Sub DSME
38 July 2011 Aug. 2011 Ocean Rig AS OCEAN RIG #3 Poseidon Drillship SHI
39 Oct. 2010 May 2011 Pacific Drilling Bora Drillship SHI
40 Apr. 2010 May 2011 Schahin #2 Sertao Drillship SHI
16
6. Modification Work
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
41 Oct. 2010 Apr. 2011 COSL Pioneer Semi-SubYantai Raffles
Shipyard
42 Jan. 2010 Feb. 2011 Schahin #1 Cerrado Drillship SHI
43 Nov. 2010 Dec. 2010 Vantage Platinum Explorer Drillship DSME
44 May 2010 Dec. 2010 BP Skarv FPSO FPSO SHI
45 Sep. 2010 Nov. 2010 Transocean Deapwater Champion Drillship HHI
46 Aug. 2010 Sep. 2010 Transocean Discoverer India Drillship DSME
47 July 2010 Sep. 2010 ODFJELL Deapsea Stavanger Semi-Sub DSME
48 July 2010 Sep. 2010 Ensco Deepocean Clarion Drillship SHI
49 July 2009 Apr. 2010 Transocean Discoverer Inspiration Drillship DSME
50 July 2009 Mar. 2010 Transocean Discoverer Luanda Drillship DSME
51 Aug. 2009 Sep. 2009 PETROSERV S/A Victoria Semi-Sub DSME
52 Mar. 2009 Sep. 2009 Transocean Discoverer Americas Drillship DSME
53 July 2009 Aug. 2009 Stena Drilling Drill Max Drillship SHI
54 May 2009 Aug. 2009 Petrobras Petrobras 10000 Drillship SHI
55 Jan. 2009 Mar. 2009 Seadrill West Eminence Semi-Sub SHI
56 Dec. 2008 Feb. 2009 Seadrill West Aquarius Semi-Sub DSME
57 Dec. 2008 Feb. 2009 Seadrill West Hercules Semi-Sub DSME
58 Dec. 2008 Feb. 2009 Seadrill West Hercules Semi-Sub DSME
59 Dec. 2008 Dec. 2008 ODFJELL Deepsea Atlantic Semi-Sub DSME
17
7. Pipeline / Pipe Laying
NO. YEAR CONTRACTOR OWNER PROJECT WORK TRADE FACILITIES COUNTRY
1 2014 HHI SEC Jeddah Power Plant A/G Piping Power Plant Saudi Arabia
2 2014 HHIPTB (Partnerships Tech.
Bureau)Az Zour North Power Plant Storage Tank Power Plant Kuwait
3 2014 SCnTMAROC PHOSPHORE
SA. (OCP)
Jorf Lasfar ODI Fertilizer Plant
P2&P5A/G Piping Fertilizer Plant Morocco
4 2013 DWECMAROC PHOSPHORE
SA. (OCP)
Jorf Lasfar ODI Fertilizer Plant P1
&P3A/G Piping Fertilizer Plant Morocco
5 2013 HDECMaaden Bauxite
& AluminaMaaden Alumina Refinery A/G Piping Alumina Plant Saudi Arabia
6 2012 KITO NIOC SP 17/18/19 Pipeline Construction Gas Pipeline Iran
7 2012 DOT TASDIT, IOEC Reshadat Pipeline Construction Gas Pipeline Iran
8 2012 KITO NIOC, POGC SP 19 Pipeline Construction Gas Pipeline Iran
9 2011 HHI MOGE, DAEWOO SHWE Pipeline Construction Gas Pipeline Myanmar
10 2011 HHI RAS GAS Bazan Pipeline Construction Gas Pipeline Qatar
1) PIPELINE
2) PIPE LAYING
NO.PERIOD
CLIENT PROJECT NAME PIPE METHODSTART DELIVERY
1 Apr. 2012 Oct. 2012 KOCKOC-1 Onshore Pipeline Project
(Kuwait)
48″ x 12.7mmt x 39km24″ x 14.3m
mt x 39km24″ x 11.1mmt x 39kmAutomatic
2 Apr. 2011 Aug. 2011 IOECForoozan Offshore Pipeline Project
(Iran)24″ x 14.3mmt x 103km Automatic
18
7. Pipeline / Pipe Laying
2) PIPE LAYING
NO.PERIOD
CLIENT PROJECT NAME PIPE METHODSTART DELIVERY
3 Apr. 2011 July 2011 PTT Offshore Gas Spur Lines (Thailand)24″ X 15.9mmt x 38km28″ X
17.5mmt x 48kmAutomatic
4 Nov. 2010 Mar. 2011 IOCL Pardip SPM Project (India) 48″ x 22.2mmt x 71km Automatic
5 Sep. 2009 May 2010 Hyundai E&C Colombo Port Expansion (Sri Lanka) 36″ x 15.6mmt x 9km Manual
6 Feb. 2009 Sep. 2009 HHI / COOEC Bohai Bay Pipeline (China)12″ x 12.7mmt x 98km12″ x
14.3mmt x 19kmAutomatic
7 Aug. 2008 Dec. 2008 HHI / CNOOC Shanghai LNG (China 36″ x 20.6mmt x 36km Automatic
8 Mar. 2008 Aug. 2008 HHI / SK EnergySK Crude Oil Unloading System
Relocation (Korea)42″ 25 4mmt x 10km Automatic
9 Jan. 2007 Mar. 2007 HHI / TOTAL Indonesia Sisi Nubi Pipeline Project (Indonesia)16″ x 20.6mmt x 6.2km22″ x 24.3m
mt x 15.2km26″ 27 5mmt x 33kmAutomatic
10 June 2006 Dec. 2006HHI/Perusahaan
Gas NegaraPGN Gas Pipeline (Indonesia) 32″ x 23.9mmt x 155km Automatic
11 July 2006 Nov. 2006 HHI / KOC KOC Crude Export Facilities (Korea) 56″ x 25.4mmt x 71km Automatic
12 Apr. 2006 July 2006 HHI / KNOC Rong Doi Pipeline Project (Vietnam) 18″ x 15.9mmt x 58km Automatic
13 Sep. 2005 Feb. 2006HHI / PTT
Public Company Ltd
PTT Third Transmission Pipeline
(Thailand42″ x 23.9mmt x 120km Automatic
14 Sep. 2004 Apr. 2005 HHI / CNOOC Chunxiao Gas Pipeline Project (China)28″ x 15.9mmt x 225km16″ x 11mm
t x 12km8″ x 9.5mmt x 63km
Automatic &
Manual
19
8. Module Fabrication
1) ALUMINUM HELIDECK
2) ALUMINUM OUTFITTING
NO.PERIOD
CLIENT EPC PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Aug. 2016 Ongoing MA SHI Johan Sverdrup Assembly, Piping, E&I installation, Outfitting
2 Dec. 2011 Dec. 2014 MA HHI Goliat FPSO Project
Handrail: 2,400m
Stair: 350m
Platform: 31.5 Ton
3 Dec. 2013 Sep. 2014 MA HHI BP Clair Ridge ProjectExternal Walkway:16 Ton
Stair Tower: North / South
4 July 2013 June 2014 MA SHI Valemon ProjectStair Tower: East / West
Handrail: 1,000 m
NO.PERIOD
CLIENT EPC PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Mar. 2016 Aug. 2016 MA HHI HESS E&P Bergading Project Assembly, Piping, E&I installation, Outfitting
2 Sep. 2015 Mar. 2016 MA SHI Statoil Mariner FSU Assembly, Piping, E&I installation, Outfitting
3 Dec. 2011 Dec. 2014 MA HHI Goliat FPSO Project Assembly, Piping, E&I installation, Outfitting
4 June 2014 Aug. 2014 MA DSME Dong Project Assembly, Piping, E&I installation, Outfitting
5 Feb. 2014 Mar. 2014 MA HHI BP Clair Ridge Project Assembly, Piping, E&I installation, Outfitting
6 Dec. 2013 Feb. 2014 MA HHI Sea Drill West Mira Project COW (Heat Tracing, Piping, E&I)
20
3) ELECTRICAL SUBSTATION
NO.PERIOD
CLIENT EPC PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Nov. 2014 June 2016 ABB HDECSARB Package 4
Project
Engineering, Procurement , Construction,
Pre-commissioning & Commissioning
assistance, Abu Dhabi Site Work
2 July 2014 Nov. 2014 ABBSamsung
C&TKNPC - CFP Project Project
Procurement , Construction, Pre-
commissioning & Commissioning Assistance,
Kuwait Site Work
4) ALUMINUM WARMING ROOM & TOILET HOUSE
NO. DELIVERY CLIENT PROJECT NAME SCOPE OF WORK
1 Feb. 2014 BP DSM Warming Room & Toilet House
Basic drawing for all disciplines
Detail drawing for all disciplines
Shop drawing for all disciplines
Fabrication & Installation, Architecture, HVAC, E&I,
Procurement, Delivery, Management
8. Module Fabrication
21
5) DERRICK ASSEMBLY
NO. DELIVERY CLIENT PROJECT NAME
1 Mar. 2015 Maersk Drilling Maersk Drilling Voyager
2 Jan. 2011 Pacific drilling Pacific bora
8. Module Fabrication
NO.PERIOD
CLIENT EPC PROJECT NAMESTART DELIVERY
1 Nov. 2014 Mar. 2015 NOV DSME ENSCO #11
2 Nov. 2014 Mar. 2015 NOV DSME Atwood # 4
3 June 2014 Nov. 2014 NOV SHI Slot for SHI # 2
4 May 2014 Sep. 2014 NOV HHI Noble # 5
5 Apr. 2014 Aug. 2014 NOV SHI Slot for SHI # 1
6 Feb. 2014 June 2014 NOV HHI Main Project MM CS 60
7 Nov. 2013 Mar. 2014 NOV HHI Atwood # 3
8 Sep. 2013 Mar. 2014 NOV HHI Transocean Harsh Environment SEM
9 Oct. 2013 Feb. 2014 NOV HHI Fred Olsen # 2
10 Apr. 2013 Aug. 2013 NOV HHI Rowan # 2
11 Apr. 2013 Aug. 2013 NOV HHI Diamond # 3
6) BURNER BOOM FABRICATION & CONSTRUCTION
22
9. Product Fabrication
NO.PERIOD
CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Oct. 2017
Ongoing
(2 years
+ 1 year extension)
DSMETCO FGP
Weidmuller TPA JB SupplySupply of Instrument Junction Box
23
10. Power Supply
NO.PERIOD
CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY
1 Sep. 2017
Ongoing
(5 years
+ 5 years extension)
Myanmar Kayin State Kawkareik 4.5MW IPPEPCC + Operation
Diesel Bunkering
2 Oct. 2016Ongoing
(10 years)Myanmar Kayin State Kayinseikgyi 4.5MW IPP
EPCC + Operation
Diesel Bunkering
1) IPP(Independent Power Producer) Project
24
11. Engineering
NO. Year Client Project Name Work Description
1 2017 Marine Aluminium Johan Sverdrup Detail Engineering for Aluminum Outfitting Package
: Access Platform, Stair Tower, Handrail etc.
2 2017 Posco DaewooShwe Gas Platform
MEG Regeneration System ModificationDetail Engineering for MEG Regeneration System Modification
3 2017 SBM INPEX Ichthys FPSO Detail Engineering for Turret Cofferdam
4 2017 DSME INPEX Ichthys FPSO Feasibility Study for Temporary Power Supply :
Structure, E&I, Fire fighting, Piping
5 2017 MODECFSO MV17
Mooring Legs ReplacementDetail Engineering for Sheave Block of Mooring Line
6 2017 Maersk Drilling XL Enhanced-4 (Jack-Up)
On-boarded Work : from South Korea to Norway (2 months)
39 Work Packages & Carry Over Work : Accommodation
Modification, Derrick Protection, Mud Sampling Unit Installation
7 2016 Transocean Deepwater Conqueror (Drillship)
On-boarded Work : from South Korea to Singapore (2 weeks)
1 Work Package & Carry Over Work : ML & MWD System
Installation
8 2016 Songa Offshore Enabler (Semi-Sub)
On-boarded Work : from South Korea to Norway (3 months)
13 Work Packages & Carry Over Work : MWOCS System
Installation, EL. LOGGING & WIRE LINE System Installation,
Moonpool X-mas Tree Stack-up Guide Modification
9 2016 KRISO Mining System Structure for Riser Pipe Support : Piping System & Elec. System
10 2016 Diamond Ocean Great White (Semi-Sub)
On-boarded Work : from South Korea to Singapore (2 weeks)
1 Work Package & Carry Over Work : IT Cable Installation, ML &
MWD System Installation
11 2016 Transocean Proteus (Drillship)
On-boarded Work : from South Korea to Singapore (2 weeks)
1 Work Package & Carry Over Work : ML & MWD System
Installation
25
NO. Year Client Project Name Work Description
12 2016Yangon Electricity
Supply Co.30MW FSPP
Technical Specification, Basic Design Engineering, General
Arrangement, Process Flow Diagram
13 2016Yangon Electricity
Supply Co.
Myanmar IPP
Containerized Power Plant Package
Technical Specification, Basic Design Engineering, General
Arrangement, Process Flow Diagram
14 2016PT Jaya Samudra
Karunia Shipping
30/60/100MW BMPP
Barge Mounted Power Plant
Technical Specification, Basic Design Engineering, Process Flow
Diagram
15 2016PT Jaya Samudra
Karunia Shipping
15k LNG FSRU
(Floating Storage Regasification Unit)
Technical Specification, Basic Design Engineering, General
Arrangement, Process Flow Diagram, Equipment Sizing,
Calculation
16 2016PT Jaya Samudra
Karunia Shipping
26k LNG FSRU
(Floating Storage Regasification Unit)
Technical Specification, Basic Design Engineering, General
Arrangement, Process Flow Diagram, Equipment Sizing,
Calculation
17 2015 Transocean Thalassa (Drillship)
On-boarded Work : from South Korea to Singapore (2 weeks)
1 Work Package & Carry Over Work : ML & MWD System
Installation
18 2015 Songa Offshore Encourage (Semi-Sub)
On-boarded Work : from South Korea to Norway (3 months)
13 Work Packages & Carry Over Work : MWOCS System
Installation, EL. LOGGING & WIRE LINE System Installation,
Moonpool X-mas Tree Stack-up Guide Modification
19 2015 Songa Offshore Endurance (Semi-Sub)
On-boarded Work : from South Korea to Norway (3 months)
13 Work Packages & Carry Over Work : MWOCS System
Installation, EL. LOGGING & WIRE LINE System Installation,
Moonpool X-mas Tree Stack-up Guide Modification
20 2015 Songa Offshore Equinox (Semi-Sub)
On-boarded Work : from South Korea to Norway (3 months)
13 Work Packages & Carry Over Work : MWOCS System
Installation, EL. LOGGING & WIRE LINE System Installation,
Moonpool X-mas Tree Stack-up Guide Modification
11. Engineering
26
NO. Year Client Project Name Work Description
21 2015 Maersk Drilling Voyager (Drillship)
On-boarded Work : from South Korea to Norway (3 months)
21 Work Packages & Carry Over Work : Mud Sampling System
Installation, N2 Generator System Installation, Galley & Mess
Room Modification
22 2015 Ocean Rig Apollo (Drillship)
On-boarded Work : from South Korea to Singapore (1 month)
1 Work Package & Carry Over Work : Mud Sampling System,
Electric SWBD Modification
23 2015 Seadrill West Carina(Drillship)51 Work Packages & Carry Over Work : Installation of Frank Han
dling System, Dryer System, Vacuum UNIT
24 2014 Maersk Drilling Venturer (Drillship)
On-boarded Work : from South Korea to Norway (3 months)
21 Work Packages & Carry Over Work : Mud Sampling System
Installation, N2 Generator System Installation, Galley & Mess
Room Modification
25 2014 Odfjell Drilling AS Deepsea Aberdeen (Semi-Sub)
On-boarded Work
Work Packaging & Carry Over Work : Mud Sampling System
Installation, Fork Lift Way Protection, WROV
26 2014 Seadrill West Jupiter (Drillship)
On-boarded Work
25 Work Packages & Carry Over Work : Office Modification, 2nd
Mini Trip Tank Addition & Fill-up Line, Mud Sampling System
Installation
27 2014 Seadrill West Saturn (Drillship)
On-boarded Work
25 Work Packages & Carry Over Work : ROV SOW, Expro
IWOCS, ML/MWD/LWD SOW
28 2014 Seadrill West Neptune (Drillship)
On-boarded Work
35 Work Packages & Carry Over Work, Mud Cuttings Dryer Equi
pment Package, Drawing Works Access Platforms, ML/MWD/
LWD SOW
11. Engineering
27
NO. Year Client Project Name Work Description
29 2014 Atwood Oceanics Achiever (Drillship)
On-boarded Work
Work Packaging & Carry Over Work : Mud Cuttings Dryer
Equipment Package
30 2014 Noble Sam Croft (Drillship)
On-boarded Work
Work Packaging & Carry Over Work : ML/MWD/LWD System,
ADCP Installation
31 2014 Maersk Drilling Valiant (Drillship)
On-boarded Work
20 Work Packages & Carry Over Work : Riser Monitoring
System, Modification of Base Oil Line, Drawing Works Enclosure
Fabrication and Installation of Access Hatches
32 2014 Ocean Rig Athena (Drillship) Work Packaging & Carry Over Work : Pure Vacuum Chemical Unit
33 2014 Maersk Drilling Viking (Drillship)
24 Work Packages & Carry Over Work : Bulk Mud System,
Extension Deck For Hydro Workshop, 2nd BOP Access Tower
Manufacturing
34 2014 Atwood Oceanics Advantage (Drillship)
On-boarded Work
Work Packaging & Carry Over Work : Mud Cuttings Dryer
Equipment Package, LP Mud System, Mud Logging Unit
35 2014 Ocean Rig Skyros (Drillship)
On-boarded Work
Work Packaging & Carry Over Work : Foam Skid, Mud Sieving
System
36 2014 DSME LNG FPSO Topside Engineering Topside Dynamic Engineering Model Development
37 2014 Petronas / Samsung LNG FPSO Functional Analysis ICSS Functional Analysis & Control Narratives
38 2014 Kuwait Oil Company WARA PMP OTS WARA PMP OTS Development and Delivery
39 2013 KOGAS AKKAS B.V. AKKAS Gas Development Project Steady State Simulation and Heat & Material Balance
40 2013 IOOC Sirri Gas Compression Facilities Basic Design & P&ID Modification
11. Engineering
28
NO. Year Client Project Name Work Description
41 2013 Saudi Aramco HOUT Onshore Gas Facilities Project Planning and Management
42 2013 Saudi Aramco HOUT Onshore Gas Facilities Project Planning and Management
43 2013 BP Quad204 FPSO Functional AnalysisICSS (Integrated Control & Safety System) Design &
Functional Analysis for Topside and Hull
44 2013 Oman Oil Company in Oman Musandam Gas Plant OTS MGP OTS Development and Delivery
45 2012 STX in ChinaCargo (Iran Sand) Loading Design &
AnalysisFEED and Interface engineering
46 2012 Petrobras and MODEC UUED DOM Gas project Shell PDC in Nigeria Design & Heat & Material Balance
47 2012 New Zealand Shipping / STXCargo (Iron Sand) Loading Design &
AnalysisCargo Loading Design
48 2012 KOMERI Lump-Sum-Turn-Key Project LNG FPSO Topside FEED & MPDS Development
49 2012 IOOC Hengam Technical Safety & Mechanical
Spec.For Three (3) Wellhead Platforms
50 2011 TOTAL and MODEC Kaombo FPSO FEED and Interface engineering
51 2011 Petrobras and MODEC OSX FPSO Marine FEED, Engineering Study and Analysis
52 2011 Shell and Hanjin DC Platform Project Planning and Management
53 2011Abu Dhabi Gas Development
and Samsung EngineeringSGD in UAE Dynamic Engineering Study
54 2011 GASCO and GS Engineering NGL4 in UAE Dynamic Engineering Study
55 2011 KOC and SK Engineering BS-132 in Kuwait Dynamic Engineering Study
56 2010 LNG Carrier Machinery Operation Manual Cargo System Operation Manual
11. Engineering
29
NO. Year Client Project Name Work Description
57 2010 COSL Pioneer (Semi-Sub)
On-boarded Work : from China to Norway (3 months)
13 Work Packages & Carry Over Work : Burner Boom & Piping
Installation, ROV Hatch, Electric Heat Tracing System
58 2010 Pacific Drilling Bora (Drillship)
Quay Side Work
50 Work Packages & Carry Over Work : New Centrifuge Platform Inst
allation, N2 Generator Installation, Cables for 3rd Party Units
59 2010 Transocean Deapwater Champion (Drillship)
On-boarded Work : from South Korea to Singapore( 2 weeks)
1 Work Package & Carry Over Work : ML & MWD System
Installation
60 2010 Vantage Drilling Platinum Explorer (Drillship)Work Packaging & Carry Over Work : ROV SOW, Expro IWOCS,
Mud Sampling System Installation
61 2010 Odfjell Drilling AS Deapsea StavangerWork Packaging & Carry Over Work : Mud Sieving System, MWD/ML
System, ROV
62 2010 Transocean Discoverer India (Drillship)
On-boarded Work : from South Korea to Singapore (2 weeks)
1 Work Package & Carry Over Work : ML & MWD System
Installation
63 2010 Ensco Deepocean Clarion (Drillship)Work Packaging & Carry Over Work : Mud Cuttings Dryer Equipment
Package, ML/MWD/LWD SOW
64 2010 BP Skarv FPSOWork Packaging & Carry Over Work : ROV SOW, Expro IWOCS,
Mud Sampling System Installation
65 2010 Schahin #2 Sertao (Drillship)Work Packaging & Carry Over Work : MI-SWACO Equipment Packag
e, ML/MWD/LWD SOW
66 2010 Schahin #1 Cerrado (Drillship)Work Packaging & Carry Over Work : Mud Cuttings Dryer Equipment
Package, ML/MWD/LWD SOW
67 2010 Transocean Discoverer Luanda (Drillship)On-boarded Work : from South Korea to Singapore (2 weeks)
1 Work Package & Carry Over Work : ML & MWD System Installation
11. Engineering
30
NO. Year Client Project Name Work Description
68 2010 Transocean Discoverer Inspiration (Drillship)On-boarded Work : from South Korea to Singapore (2 weeks)
1 Work Package & Carry Over Work : ML & MWD System Installation
69 2009 BMPP SARGAS & DSME Basic Design & FEED
70 2009 LNG FPSO DSME LNG FPSO Refrigerant Compressor CCC Design
71 2009Agbami FPSO in
Nigeria OffshoreChevron & DSME Dynamic Engineering Study & PTS
72 2009 PETROSERV S/A Victoria (Semi-Sub) 1 Work Package & Carry Over Work : ML & MWD System Installation
73 2009 Stena Drilling Drill Max (Drillship) Work Package & Carry Over Work : Mud Sieving System
74 2009 Petrobras Petrobras 10000 (Drillship)
On-boarded Work
25 Work Package & Carry Over Work : Office Modification, 2nd Mini
Trip Tank Addition & Fill-up Line, Mud Sampling System Installation
75 2009 Transocean Discoverer Americas (Drillship)On-boarded Work : from South Korea to Singapore (2 weeks)
1 Work Package & Carry Over Work : ML & MWD System Installation
76 2009 Seadrill West Eminence (Semi-Sub)Work Package & Carry Over Work : Mud Cuttings Dryer Equipment
Package, ML/MWD/LWD SOW
77 2008 Odfjell Drilling AS Deepsea Atlantic (Semi-Sub)Work Package & Carry Over Work : Mud Sieving System, MWD/ML
System, ROV
78 2008 Seadrill West Aquarius (Semi-Sub)Work Package & Carry Over Work : Mud Cuttings Dryer Equipment
Package, ML/MWD/LWD SOW
79 2008 Seadrill West Hercules (Semi-Sub)Work Package & Carry Over Work : Mud Cuttings Dryer Equipment
Package, ML/MWD/LWD SOW
11. Engineering
31
12. Control System
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
1 Dec. 2017 Ongoing KOGAS SN2234 75K LNGC SHI
2 Dec. 2017 Ongoing KOGAS SN2233 75K LNGC SHI
3 June 2016 Ongoing MBK SN2148 (With KSB & Rockwell) 174K LNGC SHI
4 June 2016 Ongoing MBK SN2149 (With KSB & Rockwell) 174K LNGC SHI
5 June 2016 Ongoing MBK SN2150 (With KSB & Rockwell) 174K LNGC SHI
6 May 2016 Ongoing FLEX LNG SN2107 (With KSB & Rockwell) 174K LNGC SHI
7 May 2016 Ongoing FLEX LNG SN2108 (With KSB & Rockwell) 174K LNGC SHI
8 July 2015 Mar. 2018 SK SN2154 (With KSB & Rockwell) 174K LNGC SHI
9 July 2015 Feb. 2018 SK SN2153 (With KSB & Rockwell) 174K LNGC SHI
10 July 2015 Dec. 2017 SK SN2081 (With KSB & Rockwell) 180K LNGC SHI
11 July 2015 July 2017 SK SN2080 (With KSB & Rockwell) 180K LNGC SHI
12 Oct. 2014 Sep. 2016 NYK H2633 173K LNGC HHI
13 Mar. 2015 June 2016 HYPROC H2814 172K LNGC HHI
14 Mar. 2015 June 2016 HYPROC H2813 172K LNGC HHI
15 Oct. 2013 June 2016 BGT SN2079 174.9K LNGC SHI
16 Oct. 2013 Feb. 2016 BGT SN2078 174.9K LNGC SHI
17 Oct. 2013 Jan. 2016 BGT SN2077 174.9K LNGC SHI
18 Oct. 2013 Nov. 2015 BGT SN2076 174.9K LNGC SHI
19 Jan. 2013 June 2015 DYNAGAS H2567 162K LNGC HHI
20 Jan. 2013 Mar. 2015 DYNAGAS H2566 162K LNGC HHI
1) EMERGENCY SHUTDOWN SYSTEM (ESDS)
32
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
21 Dec. 2012 July 2014 OSC H2584 162K LNGC HHI
22 June 2012 June 2014 DYNAGAS H2565 162K LNGC HHI
23 June 2012 June 2014 DYNAGAS H2558 162K LNGC HHI
24 June 2012 Apr. 2013 DYNAGAS H2556 155K LNGC HHI
25 June 2012 Apr. 2013 DYNAGAS H2557 155K LNGC HHI
26 June 2012 Apr. 2013 DYNAGAS H2580 155K LNGC HHI
27 Sep. 2009 Mar. 2010 BRUNEI H2277 147K LNGC DSME
28 June 2009 Dec. 2009 BRUNEI H2273 147K LNGC DSME
29 Jan. 2009 July 2009 KNUTSEN H2269 145K LNGC DSME
30 Jan. 2009 July 2009 KNUTSEN H2274 145K LNGC DSME
31 Sep. 2008 Mar. 2009 KNUTSEN H2267 145K LNGC DSME
32 July 2008 Jan. 2009 TMT H2268 145K LNGC DSME
33 July 2008 Jan. 2009 TMT H2278 145K LNGC DSME
34 July 2008 Jan. 2009 QGTC MARSHALL H2286 210K LNGC DSME
35 July 2008 Jan. 2009 KNUTSEN H2275 145K LNGC DSME
36 May 2008 Nov. 2008 PENINSULAR H2224 83K LPGC DSME
37 Mar. 2008 Sep. 2008 MARAN GAS H2320 83.8K LPGC DSME
38 Mar. 2008 Sep. 2008 QGTC MARSHALL H2284 210K LNGC DSME
39 Feb. 2008 Aug. 2008 QGTC MARSHALL H2283 210K LNGC DSME
40 Nov. 2007 May 2008 QGTC H2265 216K LNGC DSME
12. Control System
1) EMERGENCY SHUTDOWN SYSTEM (ESDS)
33
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
41 Nov. 2007 May 2008 QGTC H2266 216K LNGC DSME
42 Sep. 2007 Mar. 2008 MARAN GAS H2319 83.8K LPGC DSME
43 Aug. 2007 Feb. 2008 MARAN GAS H2318 83.8K LPGC DSME
44 Aug. 2007 Feb. 2008 QGTC H2257 216K LNGC DSME
45 Aug. 2007 Feb. 2008 QGTC H2264 216K LNGC DSME
46 July 2007 Jan. 2008 PENINSULAR H2323 83K LPGC DSME
47 July 2007 Jan. 2008 QGTC MARSHALL H2285 210K LNGC DSME
48 June 2007 Dec. 2007 QGTC H2256 216K LNGC DSME
49 June 2007 Dec. 2007 KLC H2261 150K LNGC DSME
50 Mar. 2007 Sep. 2007 PENINSULAR H2322 83K LPGC DSME
51 Feb. 2007 Aug. 2007 SOVCOM H2241 145K LNGC DSME
52 Feb. 2007 Aug. 2007 J5 H2253 200K LNGC DSME
53 Feb. 2007 Aug. 2007 BP S 297 155K LNGC HHI
54 Jan. 2007 July 2007 PENINSULAR H2321 83K LPGC DSME
55 Jan. 2007 July 2007 TEEKAY H1780 155K LNGC HHI
56 Jan. 2007 July 2007 TEEKAY S 298 155K LNGC HHI
57 Dec. 2006 June 2007 J5 H2252 200K LNGC DSME
58 Nov. 2006 May 2007 EXMAR H2316 83.8K LPGC DSME
59 Nov. 2006 May 2007 J5 H2251 200K LNGC DSME
60 Oct. 2006 Apr. 2007 BP H1778 155K LNGC HHI
1) EMERGENCY SHUTDOWN SYSTEM (ESDS)
12. Control System
34
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
61 Oct. 2006 Apr. 2007 BP H1779 155K LNGC HHI
62 Sep. 2006 Mar. 2007 J5 H2250 200K LNGC DSME
63 Sep. 2006 Mar. 2007 KLC H2260 150K LNGC DSME
64 Sep. 2006 Mar. 2007 EXMAR H2315 83.8K LPGC DSME
65 Aug. 2006 Feb. 2007 SOVCOM H2242 145K LNGC DSME
66 July 2006 Jan. 2007 J5 H2249 200K LNGC DSME
67 July 2006 Jan. 2007 QGTC H2255 216K LNGC DSME
68 July 2006 Jan. 2007 HMM H1903 150K LNGC HHI
69 July 2006 Jan. 2007 MARAN GAS H2317 83.8K LPGC DSME
70 June 2006 Dec. 2006 TRIO H1730 155K LNGC HHI
71 June 2006 Dec. 2006 PSM H2248 200K LNGC DSME
72 Mar. 2006 Sep. 2006 PSM H2247 200K LNGC DSME
73 Feb. 2006 Aug. 2006 OSG H1792 216K LNGC HHI
74 Jan. 2006 July 2006 PSM H2246 200K LNGC DSME
75 Jan. 2006 July 2006 OSG H1606 216K LNGC SHI
76 Dec. 2005 June 2006 OSG H1791 216K LNGC HHI
77 Nov. 2005 May 2006 PSM H2245 200K LNGC DSME
78 Oct. 2005 Apr. 2006 DYNACOM H1719 155K LNGC HHI
79 Oct. 2005 Apr. 2006 OSG H1605 216K LNGC SHI
80 Aug. 2005 Feb. 2006 TRIO H1729 155K LNGC HHI
1) EMERGENCY SHUTDOWN SYSTEM (ESDS)
12. Control System
35
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
81 July 2005 Jan. 2006 TEEKAY H2240 145K LNGC DSME
82 July 2005 Jan. 2006 BP H1777 155K LNGC HHI
83 July 2005 Jan. 2006 DYNACOM H1734 155K LNGC HHI
84 July 2005 Jan. 2006 DYNACOM H1748 155K LNGC HHI
85 May 2005 Nov. 2005 NYK H1563 147K LNGC SHI
86 May 2005 Nov. 2005 NYK H1564 147K LNGC SHI
87 Mar. 2005 Sep. 2005 TSAKOS H1754 155K LNGC HHI
88 Feb. 2005 Aug. 2005 KNUTSEN H2236 155K LNGC DSME
89 Feb. 2005 Aug. 2005 TEEKAY H2238 155K LNGC DSME
90 Nov. 2004 May 2005 TMT H2233 145K LNGC DSME
91 Aug. 2004 Feb. 2005 BERGESEN H2224 145K LNGC DSME
92 July 2004 Jan. 2005 TEEKAY H2239 145K LNGC DSME
93 July 2004 Jan. 2005 TRIO H1728 155K LNGC HHI
94 Feb. 2004 Aug. 2004 BERGESEN H2223 145K LNGC DSME
95 Dec. 2003 June 2004 BERGESEN H2222 145K LNGC DSME
96 Nov. 2002 May 2003 BERGESEN H2221 145K LNGC DSME
1) EMERGENCY SHUTDOWN SYSTEM (ESDS)
12. Control System
36
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
1 Feb. 2009 Aug. 2009 TMT H2278 174K LNGC DSME
2 July 2008 Nov. 2008 TMT H2268 174K LNGC DSME
3 Apr. 2008 Oct. 2008 HMM H1903 155K LNGC HHI
4 Dec. 2007 June 2008 STX PAN-OCEAN N193 150K LNGC HANJIN
5 Sep. 2007 Mar. 2008 KLC H2260 150K LNGC DSME
6 Aug. 2007 Dec. 2007 KLC H2261 150K LNGC DSME
7 Apr. 2007 Oct. 2007 STX PAN-OCEAN N192 150K LNGC HANJIN
8 Feb. 2007 Aug. 2007 SOVCOM H2241 145K LNGC DSME
9 Aug. 2006 Feb. 2007 SOVCOM H2242 145K LNGC DSME
10 Apr. 2006 Oct. 2006 DYNACOM H1734 155K LNGC HHI
11 Sep. 2005 Mar. 2006 DYNACOM H1719 155K LNGC HHI
12 Aug. 2005 Dec. 2005 DYNACOM H1748 155K LNGC HHI
13 Feb. 2005 Aug. 2005 TSAKOS H1754 155K LNGC HHI
14 Feb. 2005 Aug. 2005 KNUTSEN H2236 145K LNGC DSME
2) SHIP SHORE COMMUNICATION LINK SYSTEM (SSCLS)
12. Control System
37
NO. PERIOD CLIENT PROJECT NAME TYPE YARD
1 Feb. 2017 CHEVRON H2069 160K LNGC SHI
2 Feb. 2017 CHEVRON H2070 160K LNGC SHI
3 Apr. 2015 CHEVRON H1942 160K LNGC SHI
4 June 2014 CHEVRON H1941 160K LNGC SHI
5 Mar. 2014 CHEVRON H1920 160K LNGC SHI
6 Mar. 2014 CHEVRON H1921 160K LNGC SHI
7 Jan. 2012 BAHAMAS H1813 160K LNGC SHI
8 Nov. 2011 BAHAMAS H1812 160K LNGC SHI
9 Oct. 2011 BAHAMAS H1811 160K LNGC SHI
10 Sep. 2011 BAHAMAS H1810 160K LNGC SHI
11 Feb. 2010 QGTC H2286 216K LNGC DSME
12 Feb. 2010 BRUNEI H2277 147K LONGC DSME
13 Nov. 2009 QGTC H2285 216K LNGC DSME
14 Oct. 2009 KNUTSEN H2274 170K LNGC DSME
15 Oct. 2009 KNUTSEN H2275 173K LNGC DSME
16 Oct. 2009 BRUNEI H2273 147K LONGC DSME
17 Aug. 2009 QGTC H2284 216K LNGC DSME
18 July 2009 KNUTSEN H2269 170K LNGC DSME
19 June 2009 SHELL NW SANDERING 147K LNGC SHELL
20 June 2009 EXMAR H2272 150K LNGC DSME
21 June 2009 QGTC H2283 216K LNGC DSME
3) TRIM AND LIST INDICATION SYSTEM (T/L)
12. Control System
38
NO. PERIOD CLIENT PROJECT NAME TYPE YARD
22 Mar. 2009 QGTC H1754 263K LNGC SHI
23 Mar. 2009 KNUTSEN H2267 170K LNGC DSME
24 Jan. 2009 QGTC H1753 263K LNGC SHI
25 Jan. 2009 TMT H2278 170K LNGC DSME
26 Jan. 2009 TMT H2268 170K LNGC DSME
27 Dec. 2008 QGTC H1752 263K LNGC SHI
28 Dec. 2008 KOTC H5290 PC(AFRAMAX) DSME
29 Nov. 2008 QGTC H1751 263K LNGC SHI
30 Oct. 2008 SHELL H2174 173K LNGC HHI
31 Sep. 2008 EXMAR H2271 150K LNGC DSME
32 Aug. 2008 EXMAR H2270 150K LNGC DSME
33 Aug. 2008 ILTC H1686 155K LNGC SHI
34 Aug. 2008 QGTC H1726 263K LNGC SHI
35 May 2008 QGTC H1697 263K LNGC SHI
36 May 2008 BERGESEN H2259 156K LNGC DSME
37 May 2008 QGTC H2265 216K LNGC DSME
38 May 2008 QGTC H2266 216K LNGC DSME
39 Apr. 2008 BERGESEN H2258 156K LNGC DSME
40 Apr. 2008 QGTARGASIII H1696 217K LNGC SHI
41 Mar. 2008 QGTC H1695 263K LNGC SHI
42 Feb. 2008 QGTC H1694 263K LNGC SHI
3) TRIM AND LIST INDICATION SYSTEM (T/L)
12. Control System
39
NO. PERIOD CLIENT PROJECT NAME TYPE YARD
43 Feb. 2008 QGTC H2257 216K LNGC DSME
44 Feb. 2008 QGTC H2264 216K LNGC DSME
45 Jan. 2008 DYNACOM H1734 155K LNGC HHI
46 Jan. 2008 HMM H1903 150K LNGC HHI
47 Dec. 2007 TEEKAY H1643 216K LNGC SHI
48 Dec. 2007 KLC H2261 150K LNGC DSME
49 Dec. 2007 QGTC H2256 216K LNGC DSME
50 Nov. 2007 SOVCOM H.2241 145K LNGC DSME
51 Oct. 2007 SHELL H2173 173K LNGC HHI
52 Oct. 2007 QGTC H1677 263K LNGC SHI
53 Oct. 2007 K-LINE H1634 153K LNGC SHI
54 Sep. 2007 QGTC H2255 216K LNGC DSME
55 Aug. 2007 J5 H2253 216K LNGC DSME
56 Aug. 2007 QGTC H1676 263K LNGC SHI
57 Aug. 2007 BERGESEN H2232 145K LNGC DSME
58 July 2007 K-LINE H1620 153K LNGC SHI
59 June 2007 SHELL H2172 173K LNGC HHI
60 June 2007 TEEKAY H1646 216K LNGC SHI
61 June 2007 QGTC H1675 263K LNGC SHI
62 June 2007 J5 H2252 216K LNGC DSME
63 May 2007 SOVCOM H.2242 145K LNGC DSME
3) TRIM AND LIST INDICATION SYSTEM (T/L)
12. Control System
40
NO. PERIOD CLIENT PROJECT NAME TYPE YARD
64 May 2007 J5 H2251 216K LNGC DSME
65 May 2007 EXMAR H2263 150K LNGC DSME
66 Apr. 2007 TEEKAY H1645 216K LNGC SHI
67 Apr. 2007 KLC H2260 150K LNGC DSME
68 Apr. 2007 PRONAV H2248 216K LNGC DSME
69 Mar. 2007 J5 H2250 216K LNGC DSME
70 Mar. 2007 K-LINE H1619 153K LNGC SHI
71 Feb. 2007 TEEKAY H1644 216K LNGC SHI
72 Feb. 2007 PRONAV H2247 216K LNGC DSME
73 Feb. 2007 J5 H2249 216K LNGC DSME
74 Jan. 2007 EXMAR H2254 150K LNGC DSME
75 Dec. 2006 BERGESEN H2231 145K LNGC DSME
76 Nov. 2006 PRONAV H2246 216K LNGC DSME
77 Oct. 2006 PRONAV H2245 216K LNGC DSME
78 Aug. 2006 GOLAR H2244 145K LNGC DSME
79 June 2006 MARANGAS H2243 145K LNGC DSME
80 June 2006 KOTC H5289 PC(AFRAMAX) DSME
81 May 2006 TEEKAY H2240 145K LNGC DSME
82 May 2006 KOTC H5269 PC(AFRAMAX) DSME
83 Mar. 2006 BERGESEN H2230 145K LNGC DSME
84 Feb. 2006 BERGESEN H2229 145K LNGC DSME
3) TRIM AND LIST INDICATION SYSTEM (T/L)
12. Control System
41
NO. PERIOD CLIENT PROJECT NAME TYPE YARD
85 Jan. 2006 TEEKAY H2239 145K LNGC DSME
86 Dec. 2005 TEEKAY H2238 145K LNGC DSME
87 Nov. 2005 KRISTEN H2236 145K LNGC DSME
88 Sep. 2005 EXMAR H2237 138K LNGC DSME
89 2005 TMT H2233 145K LNGC DSME
90 2005 GOLAR H2234 145K LNGC DSME
91 2005 KRISTEN H2235 145K LNGC DSME
92 2005 KRISTEN H2228 145K LNGC DSME
93 2004 EXMAR H2208 138K LNGC DSME
94 2004 EXMAR H2218 138K LNGC DSME
95 2004 GOLAR H2226 145K LNGC DSME
96 2004 KRISTEN H2227 145K LNGC DSME
3) TRIM AND LIST INDICATION SYSTEM (T/L)
12. Control System
42
NO. PERIOD CLIENT PROJECT NAME TYPE YARD
1 Jan. 2012 BAHAMAS H1813 160K LNGC SHI
2 Nov. 2011 BAHAMAS H1812 160K LNGC SHI
3 Oct. 2011 BAHAMAS H1811 160K LNGC SHI
4 Sep. 2011 BAHAMAS H1810 160K LNGC SHI
5 Mar. 2009 TSAKOS H1754 155K LNGC SHI
6 Mar. 2009 SCI H5300 319K COT DSME
7 Feb. 2009 EXMAR H2272 150K LNGC DSME
8 Feb. 2009 EXMAR H2272 150K LNGC DSME
9 Jan. 2009 QGTC H2286 216K LNGC DSME
10 Dec. 2008 QGTC H1753 263K LNGC SHI
11 Dec. 2008 QGTC H2285 216K LNGC DSME
12 Nov. 2008 QGTC H1752 263K LNGC SHI
13 Oct. 2008 QGTC H1751 263K LNGC SHI
14 Oct. 2008 QGTC H2284 216K LNGC DSME
15 Sep. 2008 QGTC H2283 216K LNGC DSME
16 Sep. 2008 EXMAR H2271 150K LNGC DSME
17 Aug. 2008 EXMAR H2270 150K LNGC DSME
18 July 2008 QGTC H1726 263K LNGC SHI
19 May 2008 SCI H5299 319K COT DSME
20 May 2008 QGTC H2265 216K LNGC DSME
21 May 2008 QGTC H2266 216K LNGC DSME
4) FIELD INSTRUMENT
12. Control System
43
NO. PERIOD CLIENT PROJECT NAME TYPE YARD
22 Apr. 2008 QGTC H1697 263K LNGC SHI
23 Mar. 2008 QGIII H1696 209K LNGC SHI
24 Feb. 2008 QGTC H1695 263K LNGC SHI
25 Feb. 2008 QGTC H2264 216K LNGC DSME
26 Feb. 2008 QGTC H2257 216K LNGC DSME
27 Jan. 2008 QGTC H1694 263K LNGC SHI
28 Dec. 2007 QGTC H2256 216K LNGC DSME
29 Dec. 2007 KLC H2261 145K LNGC DSME
30 Nov. 2007 QGTC H1677 263K LNGC SHI
31 Oct. 2007 EXMAR H2263 150K LNGC DSME
32 Sep. 2007 QGTC H1676 263K LNGC SHI
33 Sep. 2007 QGTC H2255 216K LNGC DSME
34 July 2007 QGTC H1675 263K LNGC SHI
35 Apr. 2007 TEEKAY H1646 216K LNGC SHI
36 Apr. 2007 TEEKAY H1645 216K LNGC SHI
37 Apr. 2007 KLC H2261 145K LNGC DSME
38 Jan. 2007 TEEKAY H1644 216K LNGC SHI
39 Dec. 2006 PRONAV H2248 216K LNGC DSME
40 Nov. 2006 EXMAR H2254 150K LNGC DSME
41 Nov. 2006 TEEKAY H1643 216K LNGC SHI
42 Oct. 2006 DYNACOM H1734 155K LNGC HHI
4) FIELD INSTRUMENT
12. Control System
44
NO. PERIOD CLIENT PROJECT NAME TYPE YARD
43 Sep. 2006 PRONAV H2247 216K LNGC DSME
44 Aug. 2006 OSG H1792 216K LNGC HHI
45 July 2006 PRONAV H2246 216K LNGC DSME
46 July 2006 OSG H1791 216K LNGC HHI
47 June 2006 OSG H1606 216K LNGC SHI
48 May 2006 PRONAV H2245 216K LNGC DSME
49 Apr. 2006 OSG H1605 216K LNGC SHI
50 Apr. 2006 DYNACOM H1719 155K LNGC HHI
51 Jan. 2006 DYNACOM H1748 155K LNGC HHI
52 Jan. 2006 TEEKAY H2240 145K LNGC DSME
53 Oct. 2005 TEEKAY H2239 145K LNGC DSME
54 Aug. 2005 KNUTSEN H2236 145K LNGC DSME
55 Aug. 2005 TEEKAY H2238 145K LNGC DSME
56 June 2005 EXMAR H2208 138K LNGC DSME
57 June 2005 EXMAR H2218 138K LNGC DSME
58 June 2005 EXMAR H2237 138K LNGC DSME
4) FIELD INSTRUMENT
12. Control System
45
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
1 Nov. 2013 Ongoing SONANGOL H3620 Drillship DSME
2 Nov. 2013 Ongoing SONANGOL H3621 Drillship DSME
5) FIRE AND GAS EMERGENCY SHUTDOWN SYSTEM (F&G ESD SYSTEM)
12. Control System
46
6) OPERATING MANUAL FOR LNGC
NO.PERIOD
CLIENT PROJECT NAME TYPE YARDSTART DELIVERY
1 Feb. 2018 Ongoing Golar SN2189 LNG FSRU SHI
2 Aug. 2016 Ongoing SK SN2153 ME-GI LNGC SHI
3 Aug. 2016 Ongoing SK SN2154 ME-GI LNGC SHI
4 Mar. 2010 Ongoing Golar HN2024 LNG RV SHI
5 Mar. 2010 Ongoing Golar HN2056 DFDE LNGC SHI
6 Aug. 2016 Aug. 2017 SK SN2080 XDF LNGC SHI
7 Aug. 2016 Aug. 2017 SK SN2081 XDF LNGC SHI
8 June 2014 Sep. 2016 BW SN2118 LNG FSRU SHI
9 June 2014 Mar. 2016 BW SN2074 LNG FSRU SHI
10 Mar. 2014 Apr. 2015 SeaRiver Maritime XNB003 Crude oil Tanker APSI(Aker Philadelphia
Shipyard Inc.)11 Nov. 2013 Apr. 2015 SeaRiver Maritime XNB002 Crude oil Tanker
12 Mar. 2010 May 2016 Golar HN2031 LNG FSRU SHI
13 Mar. 2010 Jan. 2015 Golar HN2048 DFDE LNGC SHI
14 Mar. 2010 Nov. 2014 Golar HN2047 DFDE LNGC SHI
15 Mar. 2010 June 2014 Golar HN2055 LNG FSRU SHI
16 Mar. 2010 May 2014 Golar HN2027 DFDE LNGC SHI
17 Mar. 2010 Jan. 2014 Golar HN2023 DFDE LNGC SHI
18 Mar. 2010 Dec. 2013 Golar HN2022 DFDE LNGC SHI
19 Mar. 2010 Nov. 2013 Golar HN2021 DFDE LNGC SHI
20 Mar. 2010 Nov. 2013 Golar HN2026 DFDE LNGC SHI
21 Mar. 2010 Apr. 2011 ELCANO S3008 DFDE LNGC STX
12. Control System
47
NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD
1 Ongoing Aker Solutions STATOIL Johan Svedrup Platform General Relocation Service, Accommodation SHI
2 Ongoing ADMA-OPCO NASR pkg-2 Platform Accommodation HHI
3 Ongoing Seadrill Seadrill General Relocation Service, Accommodation DSME
4 Ongoing CMA CGM CMA CGM Container General Relocation Service, Accommodation HHI
5 Dec. 2017 Aker Offshore Partner STATOIL Mariner Platform Office Rental SHI
6 Dec. 2017 Sovcomflot Gazprom FSRU Accommodation HHI
7 Sep. 2017 INPEX INPEX Ichthys FPSO Manpower, Procurement DSME
8 Sep. 2017 Emerson Shell Prelude FLNGGeneral Relocation Service, Accommodation, Manpower,
Logistics, ProcurementSHI
9 Sep. 2017 SBM Offshore INPEX Ichthys FPSOGeneral Relocation Service, Accommodation, Manpower,
Logistics, ProcurementDSME
10 Sep. 2017 Emerson Shell Prelude FLNG General Relocation Service SHI
11 Sep. 2017 Technip TOTAL Martin Linge Platform Commissioning, Procurement SHI
12 Sep. 2017 Emerson TOTAL Martin Linge Platform General Relocation Service, Accommodation, Procurement SHI
13 Sep. 2017 Statoil STATOIL Mariner Platform General Relocation Service, Accommodation DSHI
14 Apr. 2017 Dana Petroleum DANA Western Isles FPSO General Relocation Service, Accommodation, ManpowerChina
COSCO
15 Apr. 2017 MDE STATOIL Johan Svedrup Platform Accommodation SHI
16 Feb. 2017 Emerson Bergading Complex General Relocation Service, Accommodation HHI
17 June 2017 MHWirth STATOIL Mariner Platform General Relocation Service, Accommodation, Manpower DSME
13. Relocation Service
48
NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD
19 Dec. 2016 SHI Ocean Rig #9 Manpower SHI
20 Aug. 2016 SONGA Offshore Songa #1, Songa #2 Drill Rig Commissioning, Manpower DSME
21 June 2016 Emerson Statoil Platform Gina KrogGeneral Relocation Service, Accommodation, Manpower,
Logistics, ProcurementSHI
22 June 2016 Emerson Petronas FLNGGeneral Relocation Service, Accommodation, Logistics,
ProcurementDSME
23 June 2016 MHwirth STATOIL Gina Krog Platform General Relocation Service, Accommodation DSME
24 Apr. 2016 BP International BP Quad 204 FPSO Manpower, Procurement, Commissioning HHI
25 Apr. 2016 BP International BP Clair Ridge Platform Manpower, Procurement, Commissioning HHI
26 Apr.2016 Foxboro Malaysia Baronia CPP General Relocation Service HHI
27 Apr. 2016Trisystems
EngineeringBaronia CPP General Relocation Service HHI
28 Apr. 2016 Omega Integration Baronia CPP General Relocation Service HHI
29 Mar. 2016 Technip Dong energy Hejre Platform General Relocation Service, Accommodation, Procurement DSME
30 Feb. 2016 DSME Statoil Platform Gina Krog Manpower DSME
31 Feb. 2016 Transocean Transocean Thalassa Manpower, Procurement DSME
32 Feb. 2016 Vantage Vantage Tungsten Explorer Manpower, Procurement DSME
33 Dec. 2015 MHWirth Songa #1,#2,#3,#4 Manpower DSME
34 Dec. 2015 DSME Chevron South Nemba Auxiliary Manpower, Commissioning, Procurement DSME
35 Dec. 2015 HANWHA E&C Yanbu 2 Power and Water Manpower Yabu, Saudi
36 Sep. 2015 TOTAL TOTAL Moho Nord TLP Manpower HHI
13. Relocation Service
49
13. Relocation Service
NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD
37 Aug. 2015 DIAMOND Offshore DIAMOND Ultra Deep-water Drillship Manpower, Commissioning, Procurement HHI
38 June 2015 SONGA Offshore Songa #1 Drill Rig Manpower, Commissioning, Procurement DSME
39 Apr. 2015 ONHP (Gazprom) Prirazlomnaya OIFP Engineering service, Procurement HHI
40 Apr. 2015 Maersk Drilling Maersk Voyager Drillship Manpower, Logistics, Procurement DSME
41 Mar. 2015 Ocean Rig Ocean Rig Apollo Drillship Manpower, Logistics, Procurement SHI
42 Feb. 2015 Seadrill SEADRILL West Carina Drillship Manpower, Procurement DSME
43 Jan. 2015 Fred Olsen Energy Fred Olsen Drillship #1 Manpower, Commissioning, Procurement HHI
44 Nov. 2014 Seadrill Seadrill West Saturn Drillship Manpower, Procurement DSME
45 Nov. 2014 Transocean Transocean Edward Drillship #1 Manpower, Procurement DSME
46 Oct. 2014 STX MOG F1006 Manpower, Procurement STX
47 Sep. 2014 Atwood ATWOOD Achiever Drill Rig Manpower, Procurement DSME
48 Sep. 2014 Odfjell ODFJELL Deepsea AberdeenGeneral Relocation Service, Manpower, Logistics,
Procurement, Shipping AgentDSME
49 Sep. 2014 Diamond Offshore Diamond Drillship #4 Manpower, Commissioning, Procurement HHI
50 Sep. 2014 Seadrill SEADRILL West Neptune Manpower, Logistics, Procurement HHI
51 Aug. 2014 Noble Noble Drillship #4 Manpower, Commissioning, Procurement HHI
52 June 2014 Noble Noble Sam Croft Drill Rig Manpower, Commissioning, Procurement HHI
53 June 2014 Maersk Drilling Maersk Valiant / Venturer Drill Rig Manpower, Logistics, Procurement DSME
54 June 2014 Golar LNGC Engineering-Operation Manual, Manpower SHI
55 May 2014 Exxonmobil EXXON Arkutun Dagi Platform Manpower, Procurement DSME
56 Apr. 2014 Ocean Rig OCEAN RIG Athena Drillship Manpower, Logistics, Procurement DSME
50
13. Relocation Service
NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD
57 Apr. 2014. Maersk Drilling MAERSK Viking Rig Manpower, Logistics, Procurement DSME
58 Mar. 2014 Diamond Offshore Diamond Drillship #3 Manpower, Commissioning HHI
59 Feb. 2014 Atwood ATWOOD Advantage Drillship Manpower, Logistics, Procurement DSME
60 Feb. 2014 Fred Olsen Energy Fred Olsen Drillship #1 Manpower, Commissioning HHI
61 Feb. 2014 Ocean Rig Ocean Rig Skyros Manpower, Logistics, Procurement SHI
62 Feb. 2014 DSME Chevron South Nemba Auxiliary Manpower, Commissioning, Procurement DSME
63 Jan. 2014 Diamond Offshore Diamond Drillship #1Accommodation, Manpower, Commissioning,
Logistics, ProcurementHHI
64 Jan. 2014 Allseas Allseas Pieter Schelte H3401General Relocation Service, Manpower, Commi
ssioning, Procurement, LogisticsDSME
65 Dec. 2013 Transocean Transocean Edward Drillship #1 Manpower, Commissioning DSME
66 Nov. 2013 Seadrill Seadrill West Tellus Drillship Manpower, Logistics, Procurement SHI
67 Sep. 2013 Diamond Offshore Diamond Drillship #2 Manpower, Commissioning HHI
68 Aug. 2013 Pacific Drilling Pacific Drilling Khamsin Drillship Manpower, Logistics, Procurement SHI
69 July 2013 Vantage Vantage Tungsten Explorer Drill Rig Manpower, Commissioning DSME
70 June 2013 Chevron Chevron EGP Phase 3B Platform Manpower, Commissioning DSME Nigeria
71 2013.06 Vantage Vantage Tungsten Explorer drillship Manpower, Logistics, Procurement DSME
72 May 2013 DSME Allseas Pieter Schelte Manpower, Commissioning DSME
73 Mar. 2013 Chevron Chevron H6051 SNX Manpower, Commissioning DSME
74 Jan. 2013 Transocean Transocean GSF- High island Manpower, CommissioningDry Dock
World (Dubai)
75 Jan. 2013 Ocean Rig Ocean Rig Mylos Drillship Manpower, Logistics, Procurement SHI
51
13. Relocation Service
NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD
76 Jan. 2013 DSME Heerema Aegir Manpower, Commissioning DSME
77 Dec. 2012 Ocean Rig Ocean Rig #4 Mykonos Manpower, Commissioning DSME
78 Oct. 2012 Heerema Heerema H3402 Manpower, Commissioning DSME
79 Oct. 2012 KOC KOC-1 Onshore Pipeline Project Manpower Kuwait
80 Aug. 2012 KNOC KNOC Panama Zhambyl Manpower, Commissioning ERSAI LLC.
81 July 2012 DSME Drilling Simulator Manpower DSME
82 July 2012 GRUPO-R Grupo-R GVA7500 Manpower, Commissioning DSME
83 May 2012 Ocean Rig Ocean Rig #2 Olympia Manpower, Procurement HHI
84 May 2012 Vantage Vantage Dragon Quest Manpower, Procurement Jurong Singapore
85 May 2012 Stena Drill Stena Ice Max Drillship Manpower, Procurement SHI
86 Apr. 2012 Odebrecht Odebrecht ODN #1, ODN #2 Manpower, Commissioning DSME
87 Apr. 2012 Vantage TMT 2 Dragon Quest Manpower, Commissioning DSME
88 Jan. 2012 Odfjell Odfjell Deep Sea Metro I Manpower, Logistics, Procurement, Shipping Agent DSME
89 Jan. 2012 Odfjell Odfjell Deep Sea Metro II Manpower, Procurement DSME
90 Aug. 2011 Ocean Rig Ocean Rig #3 Poseidon Manpower SHI
91 July 2011 PTT PTT Offshore Gas Spur Lines Manpower Thailand
92 June 2011 Technip H6001 OPS Manpower, Commissioning STX (Dalian)
93 May 2011 Odebrecht Odebrecht Norbe IX Manpower, Commissioning DSME
94 May 2011 Schahin Schahin #2 Sertao Engineered Product & Material Supply SHI
95 May 2011 Pacific Drilling Pacific Drilling Bora Manpower, Logistics, Procurement SHI
96 Apr. 2011 Seadrill Seadrill West Pegasus Manpower, Commissioning Jurong Singapore
52
13. Relocation Service
NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD
97 Mar. 2011 IOCL Paradip SPM Project ManpowerIndian Oil
Corporation
98 Feb. 2011 Schahin SCHAHIN #1 CerradoManpower, Logistics, Procurement, Shipping
AgentSHI
99 Feb. 2011 Vantage Vantage Sea Dragon Commissioning, Manpower Jurong Singapore
100 Jan. 2011 KNOC KNOC Doo Sung Rig Modification, Manpower DSME
101 Dec. 2010 Vantage Vantage Platinum Explorer Manpower, Logistics, Procurement DSME
102 Dec. 2010 BP BP Skarv FPSO Manpower, Procurement SHI
103 Nov. 2010 Transocean Transocean Deepwater Champion Manpower, Logistics, Procurement HHI
104 Nov. 2010 Vantage TMT 1 (PLATINUM EXPLORER) Manpower, Commissioning DSME
105 Sep. 2010 ENSCO DS-4 ENSCO Deep Ocean Clarion Manpower, Procurement SHI
106 Sep. 2010 Odfjell Odfjell Deepsea Stavanger Manpower, Logistics, Procurement DSME
107 Aug. 2010 Transocean Transocean Discoverer India Manpower, Logistics, Procurement DSME
108 May 2010 Hyundai E&c Colombo Port Expansion Manpower HHI
109 Apr. 2010 Transocean Transocean Discoverer Inspiration Manpower, Logistics, Procurement DSME
110 Mar. 2010 Transocean Transocean Discoverer Luanda Manpower, Commissioning DSME
111 Sep. 2009 HHI / COOEC Bohai Bay Pipeline ManpowerHHI /
China COOEC
112 Aug. 2009 Petrobras Petrobras 10000 Drillship Manpower, Procurement SHI
113 Aug. 2009 Petroserv Petroserv Victoria Drillship Manpower, Procurement DSME
114 July 2009 Transocean Transocean Discoverer Americas Manpower, Commissioning DSME
115 Mar. 2009 Transocean Transocean Discoverer Clear Leader Manpower, Commissioning DSME
116 Mar. 2009 Stena Drill Stena DrillMAX Manpower, Procurement DSME
53
13. Relocation Service
NO. PERIOD CLIENT PROJECT NAME SCOPE OF WORK YARD
117 Mar. 2009 Seadrill Seadrill West Eminence Manpower, Procurement SHI
118 Feb. 2009 Seadrill Seadrill West Aquarius, West Hercules Manpower, Logistics, Procurement DSME
119 Aug. 2008 Transocean Transocean Discoverer Americas Manpower, Commissioning DSME
120 July 2008 Odfjell Odfjell Deepsea Atlantic Manpower, Commissioning DSME
121 Mar. 2008 Transocean Transocean Discoverer Clear Leader Manpower, Commissioning DSME
122 Dec. 2007 Seadrill Transocean West Hercules/Aquarius Manpower, Commissioning DSME
Thank You!
Q&A
Jae Seok, Choi / VP / Head of Sales Div.
E-mail : antonichoi@khan-offshore.com
Phone : +82-(0)55-639-7702
CONTACT
KHAN Co., Ltd., 4th Fl., KHAN Building B, 915
Aju-dong, Geoje-Si, Gyeongsangnam-do, Korea
Tel: +82-(0)55-639-7600
Fax: +82-(0)55-639-7700
Http://www.khan-offshore.com
ADDRESS