Lakefront West Public Meeting

June 4, 2015

Project Overview

• 3 Construction Projects

– Pedestrian Tunnels at Lake Avenue and West 76th

• Completed

– West 73rd Grade Separation

• Under Construction

• Roadways Open - December 2015

• Final Landscaping - Spring 2016

– Mainline - Lake Avenue/Clifton Boulevard to West 25th Street/Detroit Avenue

• Construction to Begin - June 22, 2015

• Roadways Open - December 2017

• Final Landscaping - Spring 2018

Lakefront West Corridor – Projects and Schedule

Construction Phasing

• 2 lanes of West Shoreway mainline traffic maintained in both directions within work zones for the majority of the project duration.

• Periodic off peak short term closures of additional lanes may occur as necessary.

• 3 lanes of traffic in each direction will be restored for over winter periods and when otherwise feasible.

• Speed Limits will be reduced to 40 mph over the summer of 2015 and then to 35 mph begin fall of 2015.

Construction Phasing

Phase 2

13’ 11’ 4’ 4’ 11’ 13’

Phase 1

4’ 11’ 11’ 11’ 11’ 4’

Construction Phasing

Completed Condition

13’ 11’ 12’ 12’ 11’ 13’

Construction Phasing

• Bridge over the Lake Avenue Eastbound Entrance Ramp– West Shoreway will be closed at Clifton Ave for 25 days.– Traffic to and from the West Shoreway will be maintained

via the Lake Avenue ramps.– Law Enforcement Officers will be utilized during peak

periods. Detours will be posted.– Construction of bridge anticipated as early as Fall 2016

• Entrance/Exit Ramp closures with posted detours will occur periodically at Lake Avenue, Edgewater Park, West 49th Street, West 45th Street and West 25th

Street.• Ramp closures are phased so reasonable detours are in

place and concurrent closures of multiple ramps are kept to a minimum.

Construction Phasing

• Access to Edgewater Park, Whiskey Island and Other Marinas, NEORSD Westerly Plant, Garrett Morgan Water Treatment Plant, and Cleveland Soap Box Derby will be maintained at all times.– Posted detours will be in place as necessary for restrictions in

place.

• Entrance/Exit Ramp closure durations vary by location with 21 days being the minimum and 120 days being the maximum.

• West 25th Street between Detroit Ave and Division Ave will be closed for 3 separate 21 day periods at various points of this corridor.– Access to The Flats and adjacent businesses and residences

will be maintained. Detours will be posted as necessary.

• Local access and pedestrian traffic maintained at all times. Notification will be given one week in advance of any restrictions or access changes to properties adjacent work zones.

Noise

• No pile driving between 7pm and 7am

• Waiver for restrictions on the following activities

– Traffic Pattern Changes

– Bridge Removal and Replacement

– Bridge Deck Concrete Prep and Placement

– Underground Utilities

– Pavement

– Other items per review and approval of Councilman

N

Boulevard Landscape Enhancements

Boulevard Enhancement Area 1 Overall Project Corridor Plan

N

Boulevard Landscape Enhancements

Boulevard Enhancement Area 2 Overall Project Corridor Plan

N

Boulevard Landscape Enhancements

Boulevard Enhancement Area 3 Overall Project Corridor Plan

N

Boulevard Landscape Enhancements

Boulevard Enhancement Area 4 Overall Project Corridor Plan

N

Boulevard Landscape Enhancements

Boulevard Enhancement Area 5 Overall Project Corridor Plan

N

Boulevard Landscape Enhancements

Boulevard Enhancement Area 6 Overall Project Corridor Plan

Boulevard Landscape Enhancements

Boulevard Landscape Enhancements

Boulevard Landscape Enhancements

West Boulevard & Lake Avenue Node

West Boulevard & Lake Avenue Node

West 25th Street Node

West 25th Street Node

Lighting Details

Structures

Florida Ashlar

Sawed Joint

Sheet Pile Wall with Concrete Face and Cap

Devon Brown

Autumn Honey

Florida Ashlar

Ex. Edgewater Park BridgeStructure Types ad Finishes

Fence and Railings

DarkBronze

Railings

Fence Along Water Department - Powder

Coat Black

Materials and Hardscape – Decorative Pavers

Sample Color Palette for Decorative Pavers

Typical Multi-Use Path Node

Colored Concrete

Wood Seating Surface

Sandstone Color Palette

Wood & Steel Trash Receptacle

Steel and Cable Trellis

Planting Palate – Nodes

Shrubs

TreesWhite Oak Red Oak Redspire Flowering Pear

Oak Leaf Hydrangea Knock Out Roses Japanese Spirea Viburnum

Low-Growing Juniper Ground Cover Juniper

Planting Palate – Nodes

Perennials

Happy Returns Daylily Russian Sage

Ostara Hyacinth

Dutch Master Daffodil Hyperion Daylily

Grass

Karl Foerster (Reed Grass)

Planting Palate – BoulevardTrees

Crusader Hawthorn Prairie Fire Crabapple Japanese Lilac

Centurian Crabapple Golden Rain Drop Crabapple Serviceberry Zelkova

Red Jewel Crabapple

Chinese Elm Golden Raintree Redspire Flowering Pear Ginkgo

Planting Palate – Boulevard

Trees (continued)Valley Forge American Elm Red Oak Black Gum

Oak Leaf Hydrangea Grow-low Sumac Buffalo Juniper Shrubs

Karl Foerster (Reed Grass) Japanese SpireaBlackhaw Vibunum

Planting Palate – Boulevard

GrassKarl Foerster (Reed Grass) Blue Lynn Cassian FountainMaiden

Walker’s Low Catmint Russian Sage Dutch Master Daffodil Frans Hals Daylily

Perennials

Hyperion Daylily Autumn Joy Sedum

Wayfinding

Wayfinding

Lakefront WestQuestions?