Latest on IBM i - APSU...“With the IBM i running on IBM POWER8 servers and IBM FlashSystem...

Post on 02-Mar-2021

7 views 0 download

transcript

Latest on IBM i

Therese Eaton Client Technical Specialist

Top IBM i Client Projects

2010 to 2013 2014 2015 2016 2017

All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.

7.1 TR1 TR2 TR3 TR4 TR5 TR6 TR7 TR8 TR9 TR10 TR11 TRx

7.2 TR1 TR2 TR3 TRx

IBM i roadmap

inext

09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

** Arrows indicate general timeframes, not specific dates. ** All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.

inext

inext+1

5.4 5.4

support

6.1 6.1

7.1

7.2

IBM i

IBM i

Application Development Access & Management FLASH

TIOBE index Nov’15 http://www.tiobe.com/index.php/content/paperinfo/tpci/index.html

8 OUT OF THE TOP 10

Application Development

C C ++ C#

• Environment that the ‘open source developer’ uses

• Industry standard vs the XLC currently on IBM i

• Ability to get any OS packaged running on IBM i without IBM intervention

• Easy include OS add-on and plugins for recent OS additions

GNU Compiler Collection – the Swiss army knife of compilers

Access & Management

ARE

ACS

BRMSvHMC

Cache is becoming the new memory.

Memory is the new disk.

Disk is being replaced by flash.

FLASH - reduce wait time & improve customer experience

24

http://www.mcpressonline.com/commentary/in-the-wheelhouse-thoughts-after-my-power8-upgrade.html

Nightly backups reduced from 3h to 1h15min.

Ridiculously fast response times for web interfaces. IPL went from about twelve minutes to five.

Long-running jobs ~30 minutes now complete in six.

Thoughts After My POWER8 Upgrade

Think the surface of Mercury hot

Flash i Performance (FLiP) projections

For job X projected a runtime improvement from 3,152 to 457 sec.

In reality it was 417 sec

For job Y projected a runtime improvement from 1,562 to 596 sec.

In reality it was 596 sec

In reality response time went from (ms) Reads Writes X: 4.86 to 0.36 2.09 to 0.91 Y: 5.39 to 0.31 4.35 to 4.20

FLiP projections vs reality

EUR 100,000 saved in annual costs helps the company price its products competitively

5x faster storage performance accelerates data access, supporting better-informed decision-making

“With the IBM i running on IBM POWER8 servers and IBM FlashSystem storage, we reduced the runtime of certain, complex scheduling and planning tasks in SAP Advanced Planning and Optimization by up to 90 percent.

This enables us, for example, to modify production schedules to accommodate incoming customer orders within just 20 minutes – dramatically improving business agility.”

POWER8 and Flash storage, faster access to the product data.

“Response times have been improved by 56%, helping to improve productivity for our staff.”

“55% faster processing of background tasks, and database processing alone was accelerated by up to 70%.“

“a significant increase in Java performance speeds up all our SAP applications noticeably from the point of view of the end users.”

15

#ibmi

@Steve_Will_IBMi@IBMiSight@DawnMayiCan@SAPonIBMi@Forstie_IBMi@TimRowe_IBMi@ianpjarman

✓ IBM i Home Page✓ DeveloperWorks✓ Technology Refresh Updates

Social Media for IBM i

Blogs Dawn May i Can Steve Will You and i Mike Cain DB2 for i Tim Rowe Modern–i-zation

Are you keeping up to date?

1) Subscribe to IBM POWER & IBM i technical newsletter “TE’s Pick ‘n’ Mix” to find out the latest information and upcoming events. Email therese.eaton@uk.ibm.com

Are you keeping up to date?

2) Register for the IBM POWER systems technical webinar series at https://ibm.biz/BdXNsE