LC -‐ 383
www.linkedindustries.com.au
Position
Project Engineer
Location Brisbane, QLD
Qualifications and Memberships
Bachelor of Engineering (Civil) Traffic Implementation
Traffic Management Design No.OP379 Rail Industry Worker
General Safety Inductions Trackside Protection Card
Working at Heights Supervisor Fire Ant Awareness
Confined Space Entry
Key Skills and Computer Programs
• Preparation of construction budgets through analysis of project plans and specifications, including forecasting for multiple work activities
• Supporting project team with procurement, technical assessment of plans, RFI submissions, preparation of detailed construction procedures and design constructability reviews
• Experience in coordinating the design and implementation of temporary propping designs to structures for both demolition and building works.
• In-‐depth review of structural steel shop drawings, and element inspection once fabricated. • Liaising with the client and maintaining excellent rapport with inspectors to ensure the project is delivered
smoothly • Construction Program development and implementation • Extensive Experience in working within extreme time constraints i.e. rail bridge replacements during QR
shutdown periods. • Subcontractor management including preparation of subcontract agreements, onsite co-‐ordination of works and
quality inspections • Safety system implementation including permit writing and auditing for multiple work activities and
subcontractors, and SWMS reviews. • Quality system implementation as the Contracts Quality Representative • Experience in PUP co-‐ordination, including liaising with fibre optic retailers for the relocation of services. • Creation, implementation and review of Traffic Guidance Schemes for complex traffic control set ups, qualified in
Traffic Management Design • Experience with working in remote locations and the associated logistical challenges that arise. • Experience in the review of all compliance documentation as part of the independent certifiers team
www.linkedindustries.com.au
LC -‐ 383
Industry Experience
Job Title Project Engineer Dates March 2020 -‐ Present Company
Sunshine Coast Airport Expansion Project Sunshine Coast Council, $300M • Construction of a new 2,805m east/west Runway, new taxiway and apron configurations. The works include the
closure and removal of existing runways, dredging of sand fill from the Spitfire Realignment Channel for fill, construction of a code C taxiway with Code B bypass holding bay and Apron expansion, new drainage and AGL infrastructure, including an Airfield Lighting Equipment Room (ALER) and Visual Docking Guidance System (VDGS) to parking bays.
Job Title Project Engineer Dates September 2019 -‐ March 2020
Company
Slacks Creek Greenlink Shared Pathway Logan City Council, $2.4M • Construction of 750m of shared path connecting Moss St and Compton Rd, including construction of retaining
walls, D&C 75m multi-‐span structural steel bridge across Slacks Creek and D&C lighting and CCTV. Dennis Rd Shared Pathway Logan City Council, $350K
• Construction of shared path connecting Murrajong and Dennis Rd, behind Springwood State School
Job Title Site Engineer Dates June 2015 – September 2019
Company Moggill/ Ertech QLD
Timber Bridge Eliminations, Rosewood-‐Chinchilla QR, $17 M • Replacement of existing timber bridges on the West Moreton rail line, works involving pre-‐shutdown preparatory
works whilst under live rail operation; including piling, earthworks, implementation of temporary propping designs and concrete structures, and bridge demolition and replacement with structural steel headstocks and girders within the scheduled shutdown periods. Design and Construct
Progress Road Upgrade, Wacol BCC, $14 m • The upgrade of Progress Road between Boundary Road and Centenary Highway. The project consisted of the
widening of the existing road to five lanes, the upgrade of the existing intersection, demolition of the existing box culvert bridge and construction of two new multi span structural concrete bridges, landscape works and creek revegetation works.
• Extensive PUP co-‐ordination and planning was also required to relocate existing infrastructure prior to works commencing.
Waterway Rehabilitation Works, Holland Park West Dept of Education and Training, $458 k • The project rehabilitated and restored the existing waterway to create a stable waterway through the re-‐profiling
of creek banks, removal of noxious weeds and trees and replanting riparian zones. Scrubby Creek Bridge Shared Bikeway/Pathway DTMR, $2.1 m
• The construction of a five span, 60m long concrete bridge structure across a 50m wide section of Scrubby Creek, Kingston.
Nursery Road Special School, Car Park and Oval Redevelopment, DEPT of Education and Training, $1.1 m • Construction of an 88 bay car park, running track with sports field facilities and a three level steel disabled access
ramp. Rialto Street Chambers and Pipe Works BCC, 350 k
• The installation of large stormwater pipes and in situ concrete construction of two large stormwater chambers with multiple network and connections to improve the existing stormwater drainage. The project also included the upgrade to existing sewer lines between houses and beneath streets.
www.linkedindustries.com.au
LC -‐ 383
Industry Experience
Ivory Lane Walkway Replacement, Brisbane BCC, $1.6 m • The demolition and reconstruction of existing walkway bridge structure located on very steep sloping ground
with limited access, in Brisbane. Bus Stop Packages 8 – 15 (excluding Package 13) BCC, $5 m
• Construction/modification of 600+ bus stops to comply with DDA requirements, located throughout Brisbane. Kadina Street Drainage Stage 3, The Gap BCC, $250 k
• The installation of large stormwater pipes involving deep excavation, trench shoring, working in very confined work areas between houses and installation of field inlets, gully pits and manholes.
Fig Tree Pocket Drainage and Footpath BCC, $400 k • The under bore of new stormwater drainage line beneath the existing road, earthworks, realignment and
upgrade of existing road, footpath and guardrail works and landscaping
Job Title Graduate Engineer Dates June 2015 –
September 2015
Company Moggill
Stapylton Road Upgrade, Heathwood BCC, $6.4 m • Construction of one kilometre long four lane section of road and six lane, four way signalised intersection
through a busy suburban area under high traffic volumes. Algester Road Intersection Upgrade, Parkinson BCC, $600 k
• Construction of a new intersection on Algester Road, Parkinson into the proposed Aquatic Centre