Lifecycle of an Award
Reporting, Close-outs and Audits
Michelle Vazin, Vanderbilt University
Michele Codd, George Washington University
2
Reporting – Getting StartedWhen an award is received:
Review the terms and conditions completely for reporting requirements
What types of reports will be required? How are they submitted? What is the frequency?
3
Types of Reporting
Interim and Final Financial Reports Quarterly Letter of Credit Reports Progress Reports Effort Reports Patent & Invention Reports Special Reports (i.e. SBA, FFATA, Property, etc.)
4
Things to Consider with ReportingAccuracy of DataTiming to ensure complianceProper approvals at the institutionDocumentation of report submission
5
Reporting – Roles and Responsibilities
At your institution, who is responsible? Have clear delineation and assignment of who is
responsible for preparing and submitting a report Most types of reports require coordination amongst several areas who manage awards, (i.e. department, pre-award, post-award, etc.)
6
Close Out of Awards Have processes in place to ensure deadlines are met Send notices of expiring awards well in advance of the expiration date Create reports to track closing awards Require written request from the department if deadlines cannot be met Develop a close out policy “Freeze” award once final financial report is sent
7
Close Out of AwardsDepartmental Perspective on Close Outs
Review project expenses throughout life of the project Verify that outstanding encumbrances have been paid or liquidated Identify all parts of a project that may have to be closed: subawards, IRB,
other compliance Understand closeout requirements well before closeout Be aware of any non-financial reports due: technical, patent, property Maintain complete, accurate, approved documentation
(check your Record Retention Policy &Procedure) Make sure it’s really closing…..
8
Close Out of AwardsFinancial Aspects of Close Outs
Departmental Signoff on Final ExpendituresVerification of Cost SharingVerification of F&AFinancial Status ReportFinal Invoice or DrawFixed Price Agreements Residual BalancesClose Account in General Ledger
9
Close Out of AwardsNon-Financial Aspects of Close Outs
Technical ReportsProperty ReportsPI RelocationRecord Retention
10
Best Practices for Close OutsVanderbilt University
Initial notice sent 60 days before end of grant requesting memo to close out award or extend. Access database is kept that is an aging for both
interim and final reports. Have a Closeout Policy to facilitate the process
with departments and schools
11
Best Practices for Close OutsGeorge Washington University Automatic award management system sends alert
emails 90, 60, and 30 days prior to award end date. Closeout Policy assures consistent practice with all
units. Award system tracks aging for interim and final
reports.
12
Types of Audits
Pre-award Financial Statement OMB A-133 Program Specific Special Review F&A Cost Proposal and Disclosure Statement Business System (one or all of accounting, procurement,
property, etc.) Review
13
Sources of Audits
Sponsor
OIG for Federal Agency
Independent Audit Firm
Internal Audit
14
Potential Institutional Participants in an Audit
Central Offices (Institutional Liasion for audit usually in a central office)
Departmental Offices
PIs
Senior Administration
General Counsel
15
Notification
InstitutionalClearancesDefinition
of Scope
&SponsorReview
Preparation
Aar
Conditions
Fieldwork
Management Responses
Exit Conference
Entrance Conference
Audit Report
16
Opportunities for Improvement Use audit findings to help guide the institution in developing better
practices Capture and document the things to do so you are better prepared for
the next audit when it happens Close the gap on any weaknesses in day to day process that were detected during the audit Use audit findings to guide the development of new or refinement of
current training materials Assess your policies to ensure they provide the right guidance to your
campus when managing sponsored programs – update if necessary
17
Case Study Dr. Cruise’s R01 has ended. The final FSR (Financial Status Report) is due in two weeks. The spending rate on the grant has been low for most of the award period.
A purchase order was issued to buy a SEM charging $20,000 to the project (since here was extra money available) a month before the grant ended. The equipment quote includes an “estimated” delivery date of 90 - 120 days from the date of issue.
The vendor has informed Materials Management that “equipment delivery delays are anticipated” due to low quantities of stock necessary to complete the product.
The PI has requested that the equipment purchase be included in the upcoming FSR. Once invoiced, the PO will fully spend the remaining balance on the grant.
The PO will not be invoiced until the equipment is delivered.
How should the institution address this issue?
18
Questions?
19
Contact Information:Michelle VazinVanderbilt UniversityMichelle.vazin@vanderbilt.eduTel: (615)343-1558
Michele CoddThe George Washington Universitymcodd@gwu.edu Tel: (202)994-0896