LULA GREEN ROAD UNION, SOUTH CAROLINA. Jerry A. Brannon, Sr. ,PE Union County Engineer. Project Description. Project Length – 2.8 Miles Dirt and stone – 2.5 Miles Asphalt - 0.3 Miles Ditches & shoulders - 5.6 Miles Crossline Pipe - 76 Feet 18 “ Rip Rap - As Needed - PowerPoint PPT Presentation

transcript

LULA GREEN ROADUNION, SOUTH CAROLINA

Jerry A. Brannon, Sr. ,PEUnion County Engineer

Project Description

Project Length – 2.8 MilesDirt and stone – 2.5 MilesAsphalt - 0.3 MilesDitches & shoulders - 5.6 MilesCrossline Pipe - 76 Feet 18 “Rip Rap - As NeededMacadam Stone - 2.5 MilesBituminous Surface - 2.5 Miles

Project Description

Re-grade 5.6 Miles of shoulders and ditchesRe-grade and reshape 2.3 miles of road bedSpread, shape and compact macadam stoneClean existing pipePlace new cross line pipesInstall erosion control

Project Description

Phase II – Install 18’ bituminous surface treatment

Total Project cost estimated at $125,000

Addition funds anticipated from CTC and Union County Forces providing most of labor