Mary H. Matula Elementary School · Mary H. Matula 118.4% Walter J. Mitchell 117.3% Dr. Gustavus...

Post on 03-Aug-2020

0 views 0 download

transcript

94

Project Order

Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities

Building Facts

Map Legend

>140%

130%-139%

120%-129%

110%-119%

100%-109%

90%-99%

< 89%

Priority Funding Area

Mary H. Matula118.4%

Walter J. Mitchell117.3%

Dr. Gustavus Brown130.7%

T. C. Martin131.5%

29

Worn Exterior Cladding

Maintenance Needed

Traffic Congestion

Matula Elementary School was originally constructed in 1992. Interior finishes are

in good condition, but minor maintenance is needed in many areas. The building

is efficiently laid out, but wayfinding is difficult. The media center is not effectively

separated from corridors and is utilized as a circulation zone between classroom wings.

The entrance sequence is secure and administration offices are conveniently located.

Exterior cladding shows cracking and efflorescence. Mechanical and plumbing systems

are in fair condition, the domestic water system is in need of a back-flow preventer, and

the cooling tower is in need of replacement. Electrical systems are in fair condition. The

site is adjacent to other CCPS properties. Bus and car parking are separated, but the

site is only accessible by one road.

Mary H. MatulaElementary School

Worn Finishes Efficient Circulation

95

Current Building Score

MaintenancePriority

Prescribed Work Cost Analysis

Recommendations

18

4.01

Minor Renovation.

It is recommended that Matula Elementary undergo

a minor architectural renovation, as well as a roof

replacement and minor mechanical and plumbing

upgrades.

ARCH

MEP

SITE

SURVEY 3.25

5.00

4.02

3.88

<2 Replace

2-3 Replace / Reno.3-4 Reno. / Maint.>4 Maintenance

SurveyCategories 4.01

This School Project Determination

BuildingScore

Description Qty. Unit County Share State Share Cost/Unit TOTAL

ARCH

Interior Doors/Hardware 124 ea $64,232 $109,368 $1,400 $173,600

Roof Replacement 62,823 sf $162,712 $277,049 $7 $439,761

Exterior Walls 62,823 sf $125,646 $- $2 $125,646

Minor Maintenance 62,823 sf $125,646 $- $2 $125,646

MEP

Cooling Upgrades 62,823 sf $569,490 $969,673 $25 $1,539,164

Fire Alarm System Upgrade 62,823 sf $69,734 $118,735 $3 $188,469

SITE

Stormwater Management/Water Quality 1 ls $46,250 $78,750 $125,000 $125,000

Subtotals $1,163,710 $1,553,576 $2,717,286

Total Including Soft Costs $2,327,523 $1,553,576 $3,881,099

Current

554

554

OptimumSRC 768

Proposed