MC Beamline

Post on 09-Jan-2016

19 views 2 download

Tags:

description

MC Beamline. Tom lackowski L1 Manager. Agenda. Project Charter Scope Schedule Cost Status and Issues. Project Organization. Site Plan. Scope. Main Injector type enclosure 10 feet wide x 8 feet high (typical except near MC-1 where higher ceiling will be required. - PowerPoint PPT Presentation

transcript

MC Beamline

Tom lackowski

L1 Manager

T. Lackowski - MC Beamline 2

Agenda

Jan. 2013

• Project Charter• Scope• Schedule Cost • Status and Issues

T. Lackowski - MC Beamline 3

Project Organization

Jan. 2013

T. Lackowski - MC Beamline 4

Site Plan

Jan. 2013

T. Lackowski - MC Beamline 5

Scope • Main Injector type enclosure

10 feet wide x 8 feet high (typical except near MC-1 where higher ceiling will be required.

Painted walls and ceiling, sealed floor. Floor to have 3” cover over rebar to enable stand anchorage.

Channel inserts walls and ceiling @ 8’ o/c. (no inserts 5’ from floor on aisle side)

• Shielding 16 feet of earth/concrete for M-4 beamline. (w/ beamline 4’ from clg.) 6 to 9 feet for g-2 beamline. Shielding needed within enclosure

between MC-1 building and M-4 / Delivery Ring.

• Access for magnets is provided directly from Ring enclosure; lift provided for magnet installation. Shielded hatch provided for magnet installation / replacement.

Jan. 2013

T. Lackowski - MC Beamline 6

Typical Cross Section

Jan. 2013

T. Lackowski - MC Beamline 7

Scope

• HVAC & Process Water A concept exits that integrates

the requirements for beamline

and Mu2e. G-2 is isolated from

beamline. LCW provided by g-2 and Mu2e

projects.

• Electrical 500 MCM ground along beamlines. Quad 120V & duplex 208V utility outlets at 60’ 480V welding outlets at 400’ Three 18” cable trays provided (one tray will contain line type heat

detection) Lighting 20 FC; UPS in MC-1 Building for emergency lighting.

Jan. 2013

T. Lackowski - MC Beamline 8

Cost by Division

Jan. 2013

T. Lackowski - MC Beamline 9

P6 Schedule

Jan. 2013

T. Lackowski - MC Beamline 10

P6

Jan. 2013

T. Lackowski - MC Beamline 11

P6

Jan. 2013

T. Lackowski - MC Beamline 12

GPP Milestone Schedule

Jan. 2013

T. Lackowski - MC Beamline 13

Current Muon Campus Fiscal Cost and Proposed Schedule

Jan. 2013

T. Lackowski - MC Beamline 14

Preliminary Costs

Jan. 2013

T. Lackowski - MC Beamline 15

Cost Curve

Jan. 2013

T. Lackowski - MC Beamline 16

Status and Issues

• Beamline lattice not complete past bend Holding up Project Plan completion Depending on geometry of final layout there may be some exiting

issues that must be resolved (Additional stair @~$175K)

• Project plan text 80% complete.• Budget exceeded ($9.7M vs. $9.2 M), close to $10mil

cap. Additional funding in FY14 most beneficial. Indirect costs have increased and recent history indicates that

there is a negative risk of additional increases. There is little in the way of deduct scope contingency that would

not need to be transferred to one of the other projects.

Jan. 2013

T. Lackowski - MC Beamline 17

Current GPP Program

Jan. 2013