Michigan Ave. - Santa Monica...Segment Option 2: Lincoln to 7th • Convert to one-way westbound •...

Post on 31-Jan-2020

1 views 0 download

transcript

}  Michigan Ave. congested east and west of Lincoln; bike/ped access

}  Freeway on- and off-ramps back up Lincoln Blvd. and 4th St.

}  Unsafe mid-block ped crossings of Pico

}  Michigan Ave. está congestionada al este y oeste de Lincoln; acceso para ciclistas/peatones

}  Las rampas de la autopista congestionan a Lincoln Blvd. y 4th St.

}  Peatones cruzan Pico en lugares peligrosos

}  Olympic Dr. is uninviting; new plans could improve

}  Students cycling choose most direct routes

}  Opening and closing of school entrances

}  Olympic Dr. no es atractivo; Se puede mejorar con nuevos planes

}  Los estudiantes que usan bicicletas siempre escogen la ruta mas directa

}  Abrir y cerrar las entradas a la escuela

}  Lighting needed on 7th St.

}  Other important locations to improve: Lincoln/Pico, 6th/Pico, Lincoln, Lincoln over freeway

}  Narrow sidewalks

}  Necesitamos luces en 7th St.

}  Otros lugares importantes para mejorar; Lincoln/Pico, 6th/Pico, Lincoln, Lincoln encima de autopista

}  Banquetas angostos

Feb. 2008- Dec. 2011

Feb. 2008- Dec. 2011

Feb. 2008- Dec. 2011

Tratamientos y Estrategias de Ingeniería

Zona escolar

Proporcionar zonas de protección en las banquetas

La banqueta no tiene zona de protección

Una buena zona de protección en la banqueta

}  Recommended minimum: 5’

}  Preferred min: 6’

}  At schools: 10’-14’

Proporcionar banquetas suficientemente anchas

El mínimo recomendado:

El mínimo preferente:

En las escuelas:

Instalar alumbrado publico

Cumplir con los requisitos de la ADA* para diseños universales

ADA* Ley Americana para Discapacitados por sus siglas en Ingles

}  Two ramps per corner/ Dos rampas peatonales por esquina

}  Eight ramps per intersection/ Ocho rampas peatonales por intersección

Diseño del borde de la banqueta

Rampas en las banquetas (con plataforma de advertencia)

}  Local streets/ Vialidades locales

}  Bike lanes/ Carriles ciclistas

}  Pathways/

Caminos ciclistas

Ciclovías sobre la ruta escolar

Vialidades locales – donde la mayoría de los niños andan en bicicleta

Carriles para ciclistas

Andadores sobre la ruta escolar

Instalar racas para bicicletas

Reduce the crossing distance

Reduce la distancia de los cruces

Extender las esquinas en los cruces

Islas de separación (refugios peatonales)

Marcar los cruces peatonales

Modificar el tiempo de cruce en los semáforos

Semáforos con contadores para peatones

Disminuir la Velocidad Vehicular

Un radio amplio para dar vuelta = vueltas mas rápidas

Radio de la esquina;: mantenerlo estrecho

Michigan Avenue

Additional Comments : (post-its)

Segment Option 1: Lincoln to 7th •  Convert to one-way westbound •  6’ bike lane with 2’ parking buffer

westbound •  6’ colored contra-flow bike lane

with 2’ parking buffer eastbound •  Double yellow lines to separate

contraflow bike lane •  Dashed green intersection

treatment across Lincoln

Intersection 4: Lincoln @ Michigan •  Continental crosswalks •  Bike boxes to cross Lincoln •  Audio signals •  Advanced stop bars •  Automatic walk phase during school hours •  Leading pedestrian interval •  Bulb-outs to cross Michigan •  Bulb-outs to NW and SW corners to cross Lincoln •  Remove southbound right-turn lane on Lincoln

5’

11’

Segment Option 2: Lincoln to 7th •  Convert to one-way westbound •  5’ bike lane with 2’ parking buffer

westbound •  6’ colored contra-flow bike lane

with 2’ parking buffer eastbound •  Double yellow lines to separate

contraflow bike lane •  Dashed green intersection

treatment across Lincoln

Jiffy Lube

Coffee Bean

Segment: Michigan to Pico •  Convert to one-way

southbound for motorists

•  6’ colored bike lane southbound

•  6’ colored contra-flow bike lane with 6’ parking buffer eastbound

•  Double yellow lines to separate contraflow bike lane

•  Street lighting •  Landscaping and

pervious materials to sidewalk parkways

•  Shorten parking stalls to 16’

Intersection 5: Michigan @ 7th •  Raised intersection/speed table •  Continental crosswalks •  Advanced stop bars •  R1-6 sign

Additional Comments : (post-its)

Segment Option 2: Michigan to Pico •  Convert to one-way southbound for motorists •  6’ bike lane southbound •  6’ protected bike lane outside angled parking •  Street lighting •  Landscaping and pervious materials to sidewalk

parkways •  Parking spaces decrease from 48 to approximately 35

Segment Option 3: Michigan to Pico •  Convert to one-way southbound for motorists •  5’ Raised and protected bike lane southbound with

2’ parking buffer •  6’ colored contra flow eastbound - green bike lane

4’ strip buffered on both sides with 2’and 5’ •  Street lighting •  Landscaping and pervious materials to sidewalk

parkways •  Parking spaces remain as in Option 1

55’ 2’

Additional Comments : (post-its)

Intersection 7: Pico @ 7th •  Signalize with audio and countdown signals •  Bicycle-only phase for turning cyclists •  Advanced stop bars to cross Pico •  Continental crosswalks to cross Pico •  Raised crosswalk to cross 7th •  Bulb-outs on NW and NE corners to cross 7th •  Colored dashed bike lanes to connect 7th to cycle track

Segment: 6th to 7th •  12’ 2-way median cycle

track •  2’ raised buffer on north

side •  4’ landscaped buffer on

south side •  Reduce #1 travel lane to

10’ and #2 (curbside) to 11’

Pico Bl.

7th St.

SAMOHI

Additional comments: (post-its)

Segment: 6th to 7th •  12’ 2-way median

cycle track •  2’ raised buffer

with white reflectors on north side

•  4’ landscaped buffer on south side

•  Reduce #1 travel lane to 10’ and #2 (curbside) to 11’

Intersection 8: Pico @ 6th •  Bicycle-only phase for turning cyclists •  Continental crosswalks on all 3 crossings •  Bulb-outs on NW and NE corners to cross 7th •  Colored dashed bike lanes to connect 6th to cycle track •  5’ northbound bike lane, 6’ bikes-only lane southbound on 6th •  Double yellow lines to separate southbound bike lane •  Shorten curb extension on SW corner •  Advanced stop bars

SAMOHI

Hotel

Additional comments: (post-its)

Segment: Pico to Olympic •  4’ landscaped buffer to sidewalk on east side

Intersection 9: Pico @ 4th •  Continental crosswalks •  Protected left turns

Intersection 10: Civic Center @ 4th •  New north leg crossing •  Continental crosswalks to north and east legs •  Advanced stop bars to north and east legs •  Bulb-outs to NE and SE corners to cross Civic Center •  Keep clear markings in intersection

SAMOHI Track

SAMOHI Track

Gas Station Parking Structure

Hotel

Additional comments: (post-its)

Segment: 4th to 7th •  Add 7’ to 8’ to sidewalk •  Reduce widths of travel lanes

Intersection 2: Olympic @ 5th •  Continental crosswalk •  Advanced stop bar •  Bulb-outs to SE and SW corners to cross 5th •  Crossing island

Intersection 1: Olympic @ 4th •  New north leg crossing •  Continental crosswalks •  Red arrow for northbound vehicles •  Leading pedestrian interval •  Reduced curb return SW corner •  Audio signals

Additional comments: (post-its)

Intersection 3: Olympic @ Lincoln •  Continental crosswalks •  Advanced stop bars •  Leading pedestrian interval •  Audio signals •  No RTOR during school hours for eastbound motorists on Olympic •  Reduce curb return on SE and SW corners •  Truncate median, add median nose, straighten crosswalk on south crossing of Lincoln

Intersection 6: Lincoln @ Pico •  Continental crosswalks •  Advanced stop bars •  Leading pedestrian interval •  Audio signals •  Automatic walk phase during school hours •  Lengthen green walk phase to cross Lincoln •  Bulb-outs to cross Lincoln, depending on Lincoln Blvd. planning process •  Bulb-out on SE corner to cross Pico •  Reduce curb return on SE and SW corners

Gas Station Tommy’s

U-Haul

Additional comments: (post-its)

Additional comments: (post-its)