Middle East Hire Fleet - X-SMART GROUP · Middle East Hire Fleet AC - 5KW to 1000KW Resistive...

Post on 10-Jul-2020

0 views 0 download

transcript

Middle East Hire Fleet

AC - 5KW to 1000KW Resistive LOADBANKS

DC - 12V to 600V LOADBANKS upto 2000A

Rack Load Banks (Server Simulators)

• Hillstone have manufactured and rented load banks for 25 years

• Hillstone are Based in Bury, Lancashire

• Hillstone have supplied load banks to

• Hillstone cross hire load banks only from

• Site surveys, Risk Assessments, Method Statements

• Full UK coverage for delivery & collections

• Load bank technicians with CSCS cards & full PPE

• Road tow trailers, vans fitted with digital tachographs

• Based at Dubai , UAE with Rental depot • In Saudi Arabia with With Partner at Jubail and Hillstone Rep

based at Riyadh • Full GCC Coverage for delivery & collections • Site surveys, Risk Assessments, Method Statements for Load

Bank Testing for Generators and UPS Systems and Battery Discharge Testing.

• Largest fleet of Rack Load Banks(Server Simulators) in Kingdom of Saudi Arabia (3 Megawatts)

DC Load banks

• Connection direct to battery terminals

Battery & UPS testing procedures

Hillstone provide full technical support

• UPS autonomy testing

• Connection to the output of the UPS

• Battery Capacity Test

AC Load banks

Voltage ranges from 12V to 600V

Current available from 100A to 5000A solutions

DC Load Banks

Small portable designs

Hillstone provide full technical support

For DC load bank enquiries answers to the following questions will provide

sufficient information to allow a quotation to be issued

DC enquiry check list

• What is the required test?

Battery capacity test

Battery charger test

Fuel Cell load test

• For battery testing:

What is the battery type? Lead Acid or Ni-Cad?

What is the battery capacity

How many cells does the battery have ( connected in series per string )

How many parallel strings does the battery have?

• What is the test voltage?

( also what is the maximum voltage?)

• What is the required current?

Single & 3 phase designs

AC Load Banks

30KW

100KW

200KW

300KW

500KW

1000KW*

For AC load bank enquiries answers to the following questions will

provide sufficient information to allow a quotation to be issued

AC enquiry check list

• What is the required test?

Generator load test

UPS autonomy test

• What is the test voltage?

( also what is the maximum voltage?)

• What is the required current or power?

• Is a re-active load test required?

• How many meters of cable are required?

• Where is the site located? & How long is the hire for?

• Are we providing delivery, cable laying, removal etc?

• Is an operator required with the load bank

Oil & Gas Sector

Battery testing

UPS System testing

Generator testing

Telecom Sector

Battery Testing - 48V DC high current discharges

Server Rooms

UPS System - Autonomy testing

Datacentre Sector

Standby Power testing

Cooling

Integrated System Tests testing

Electrical power systems - such as:

Heat Ventilation Air-Conditioning equipment such as:

Power Distribution Units,

UPS systems,

Gen-sets

Chillers

Compressors

Air Handling units

Integrated System Tests

Stage 1- IST testing

Portable 100KW, 200KW, 300KW 3 phase load banks

provide data hall testing of power

• UPS systems autonomy testing

• Generator black start testing

• Possible HVAC testing subject to data

hall design

• Power Distribution Unit testing

Stage 2- IST testing

Proving your data hall power & cooling infrastructure

• Data hall cabling verification

• Uniformed Air-Con heat testing

• 1KW to 20KW switched load steps

• Single phase 230V 50Hz

• 3 phase 415V 50Hz

20KW portable Mini Tower load banks

Stage 2- IST testing

Stage 3- IST testing

4U modules fitted into 19” racks

1.1KW to 6.66KW loads

Containment Pod Server Simulator