MIDDLE SCHOOL RENOVATION
WEEKLY PROGRESSJULY 5 THRU JULY 9
7/6/10 NEW GYM WALL BEING
CONSTRUCTED
7/6/101ST FLOOR SOUTH SIDE REMOVAL OF
OLD STUDENT ENTRANCE DOORS
7/6/10A-POD 1ST FLOOR NORTH SIDE
7/6/10F-POD 2ND FLOOR SOUTH SIDE
DRYWALL IN PROGRESS
7/6/10F-POD 2ND FLOOR SOUTH SIDE
7/6/10D-POD 2ND FLOOR EAST SIDE INSULATING OF
WALLS
7/6/10
NEW LIBRARY ENTRANCE ON SOUTH SIDE
STEPS LEADING TO LIBRARY 2ND FLOOR
WERE REMOVED
7/6/10
REMOVAL OF 2ND FLOOR ENTRANCE LANDING IN LIBRARY
NEW LIBRARY ENTRANCE ON NORTH SIDE
7/6/10REMOVAL OF LIBRARY 2ND
FLOOR ENTRANCES
7/6/10OFFICE AREA
7/6/10FOOD STORAGE / CUSTODIAL
STORAGE ROOM WALLS REMOVED
7/7/10D-POD 2ND FLOOR EAST SIDE
INSULATING OF WALLS
7/7/10OLD LIBRARY ENTRANCE
SOUTH SIDE WALLS BLOCKED
NEW LIBRARY ENTRANCE SOUTH SIDE IN
PROGRESS
7/7/10LIBRARY 2ND FLOOR ENTRANCE &
STEPS WERE REMOVED
7/7/10OLD PIT FILLED WITH STONE TO
PREPARE FOR NEW STORAGE AREA
7/7/10NEW STAIR RAILS INSTALLED
7/8/10C-POD 1ST FLOOR SOUTH SIDE ROOMS ARE BEING
PAINTED
7/8/10OPENINGS AT EACH END OF HALL FOR NEW RESTROOMS
NEAR GYM
7/8/10E-POD 2ND FLOOR NORTH SIDE WALL
INSULATION STARTED
7/8/10
LIBRARY NEW ENTRANCE SOUTH SIDE
LIBRARY NEW ENTRANCE NORTH SIDE
7/8/10LIBRARY NORTH SIDE OLD ENTRANCE ENCLOSED
7/8/10A-POD 1ST FLOOR NORTH SIDE