Chief Resident Engineer (Highway). November 2011 – June 2012 Control and monitoring:
4.3 km motorway. 8 viaducts. Partial cloverleaf interchange.
Viaduct construction
Cranes lifting concrete beams
Asphalt mixtures spread, Viaduct pillars
Load test
Project Manager (Perm-way works). July 2007 – November 2009 Implementation of the following activities:
Earth Movement: 550.000 m3. Double track using Iberian gauge with a total length of 27.500m. Track ballast spread (167.000 m3), placement of sleepers “MR” and
“PR”, placement of track, securing, heavy tamper, welding and rail de-stress.
Installing a total of 28 crossovers and railroad switches.
Ballast spread, final link
Final link, unloading tracks
Levelling, switch detail
Rail yard
Crossover detail, work train
Station rail yard
Construction Manager. December 2005 – June 2007 Typology of the tunnels (Cut & Cover, total length of 3.600 m):
Concrete pile walls (diameters from 800 to 1500, depth up to 22m). In total 120.000 ml were performed.
Upper slab on supporting heads and lower reinforced slab. Shotcreting of pile walls.
Typology of the bridges: Pk 0+500, Single steel box girder bridge of 96m length, central span
48m. Pergola pk 6+100, two openings of 14 and 12 beams of 21m length
each beam. 4 curved post-tensioned slabs of 1,20m at the edge y 27 m of length. Footbridge between Pozuelo and the University of Somosaguas.
Bored piles
Pile walls
Steel box girder bridge
Pergola over motorway
Curved post-tensioned slabs
Finished project
Site Manager. June 2004 – November 2005 Work’s description:
Drainage system of 370 m length with a stretch of 135 m jackable and diameter of 2500mm.
Three connecting chambers. Roundabout renovation. Overflow and sand trap chambers
Launch shaft
Pipe jacking in progress
Pipe jacking in progress
Pipe jacking in progress
Pipe trench and roundabout
Roundabout renovation
Construction Manager. May 2002 – May 2004 Typology of the bridges:
Foundations: footings over drive piles or on land. Circular pillars of 1,5m diameter with height up to 15 m. Superstructure formed by pre-fabricated beams and solid slab Two of the bridges are extensions of the existing ones at the San Pedro
Sula highway – Puerto Cortés
Driven Piles for Gabriela Bridge
Channel flowing
Channel flowing