Nathan Hale High School Modernization

Budget: $87 million

Schedule: summer 2007 to summer 2011

Delivery Method: multi-prime (design/bid/build and GC/CM)

Size: 15,000 SF (new) and 205,000 SF (renovation)

Scope: Demolish the 1973 library addition and portables, new addition for

library and arts classrooms, and renovate a 1963 high school campus

including seismic and life safety, ADA, exterior envelope, roofing, interior

finishes, furnishings, mechanical and electrical systems, site improvements.

Program Manager Prime Architect Prime Contractors

Revised Plan:

• Accelerate start of design and construction by two years

• Renovate in phases while school is occupied

• Complete the project one year early

Phasing Plan

Floor Plans

Courtesy of Mahlum

Under construction: Placing new grade beams for Project 1 art classrooms

3D BIM modeling was used in Project 2 for MEP coordination

Before/after of a typical

hallway

Renovated classroom

New studio and teaching spaces for KNHC / C89.5 in Project 1

Photo by Benjamin Benschneider

Completed project in fall 2011

Renovated south (student) entry

View of renovated Court 03

Photo by Benjamin Benschneider

View of new library addition (Phase 1) from 110th Street

Photo by Benjamin Benschneider

Nathan Hale High School

Performance:

Schedule: Budget: Change Orders: Sustainability: Innovation:

Community Outreach: Awards:

Core PM Team:

Senior Project Manager:

Construction Managers:

Project Engineer:

Modernization

11 months early (building) under budget * (0.1%) 13.7% ** WSSP Phased/occupied, BIM, GC/CM, portables/TI, sustainability, site conditions Over 225 documented outreach events AIA and ASHRAE (nominated) CMAA (nominated/pending) CEFPI Regional (nominated/pending)

Ian Kell (Heery) Tracy Silla and Jill Kurfirst (DKA) Earl Edwards (SSD)