PROJECT EXPERIENCESTEEL PROJECTS
NO CUSTOMER DESCRIPTION
1 Total E&P Indonesie Provision of Various Structural Material
2 Pearl Oil (Sebuku) Ltd Supply of Structural Primary Steel
3 Total E&P Indonesie Structural Steel for Jackets and Topsides for Sisi Nubi Phase 2B and Peciko Phase 7B Development Project
4 Premier Oil Natuna Sea BV. Provision of Primary Steel for the Naga and Pelikan Wellhead Platforms (NWHP and PWHP)
5 PT. Pertamina Hulu Energi Offshore North West Java Line Pipe for Pipeline Replacement Project 2012
6 PT. Kutilang Paksi Mas PLTG Senipah 2 x 400MW IPP Pipeline, Fuel Gas System and Gas Booster Compressor Packages
7 Total E&P Indonesie Provision of Various Pipes for Peciko 7B
8 Premier Oil Natuna Sea BV. Provision of Linepipes for Naga Pelikan Project
9 PC Ketapang II Ltd Provision of Structural Steel Supply for Bukit Tua Development Project
10 PHEWMO Procurement of Coated 16" Pipeline Material, Pipe Bend and Cathodic
11 PC Muriah Ltd Provision of Structural Steel Supply for Kepodang Gas Development Project
12 Total E&P Indonesie Provision of Bin Seamless Pipe Bend
13 Total E&P Indonesie Bend, 90 Deg. Bich, 20.6MM, 5D, 5MLS
14 PT. Pertmina Hulu Energi Offshore North West Java Line Pipe 6" API 5L Gr. X52
15 Total E&P Indonesie Provision of Various Pipe for Peciko 7C Project
16 PT. Pertamina Hulu Energi Offshore North West Java Supply of Coated Line Pipe 12" Complete with Accessories for GG Development Project
17 Total E&P Indonesie Various Pipe Structural
18 Total E&P Indonesie Beam & Channel
19 PT. Timas Suplindo Pertonas Bukit Tua Linepipe Coating
20 PT. Pertamina Hulu Energi Offshore North West Java Line Pipe MMF for Pertamina ONWJ
21 PLNB - UBE Construction of 13,5 km Subsea Gas Pipe Line Project from Pemping Island to Tg Uncang Batam
22 Petronas Carigali Ketapang II Ltd Provision of Structural Steel for Bukit Tua Project
23 Pertamina Hulu Energi West Madura Offshore Provision of Coated Linepipe and Riser for PHE-12
24 PT. Pertamina Hulu Energi Offshore North West Java Provision of Pipebend dia. 6" & 8" for PRRP Project 2016
25 PT. Pertamina Refinery Unit Provision of Pipe Concrete Coating
26 PT. PGAS Solution Pipeline 16" API5L, Liquid Expoxy Internal Coating + 3LPE External Coating
27 PT. PGAS Solution Pipeline 16" API5L, Liquid Expoxy Internal Coating + 3LPE External Coating
28 PT. PGAS Solution Hot Induction Bend 7 External Coating for Provision Lean Gas Piple Phase 1 Project
PROJECT EXPERIENCECOMPRESSOR PROJECTS
NO CUSTOMER DESCRIPTION
1 JOB Pertamina - Medco E&P Tomori Sulawesi Rental Gas Compressor for Tiaka Field
2 PT. Indoturbine Gas Compressor Fuel Gas Package
3 Post Energy on Pertamina PDT Project Gas Compressing Modules Complete with Accessories
4 PT Imeco Intersarana on PLN Kalimantan Project Compressor gas 325HP-1 Stage
5 PT Duta Firza on Salamander VRU Compressor Package
8 PT. Titis Sampurna Gas Compressor Package
6 VICO Indonesia 2 (Two) Wellhead Compressor Packages
7 VICO Indonesia Eleven (11) Wellhead Compressor Packages
9 Salamander (North Sumatera) Ltd Provision of Booster Compressor Rental Services
10 PT. Pertamina EP Sumatera Wellhead Gas Compressor di Struktur Gebang
11 PT. Pertamina EP UBEP Tanjung Rental Services 3 (three) units of Mini Gas Compressor
12 Cnooc SES Ltd Procurement of Twin Screw Gas Compressor Package For Widuri-P RAG Utilization Project
13 PT. Indoturbine Terbangi Besar Compressor Station High Level Technoeconomic study
14 Salamander (North Sumatera) Ltd Provision of Booster Compressor Rental & Services
15 Santos (Sampang) Pty Ltd. Wortel Onshore gas Compressor Refubrishment & Relocation
16 PT. Medco E&P Rimau Gas Compression Services Very Low Pressure Compressor For Rimau Asset
17 PT. Gaspro Project Management of Gas Compressor Refubrishment & Relocation
18 PT. Pertamina (Persero) Compressor Gas Rental Service, Flare Recovery Depot, LPG Tanjung Uban
19 PT. Pertamina EP - Jatibarang Mini Gas Compressor Rental Services
20 PT. Pertamina EP - Jatibarang Provision 5 Units of Gas Compressor NFG CMB Field Jatibarang Asset 3
PROJECT EXPERIENCE
EPC PROJECTS
NO CUSTOMER DESCRIPTION
1 Perusahaan Listrik Negara - BOT Pembangunan on shore receiving facility, pipe line offshore 16”
Inch 13.5 km, Metering, IGMS, di Batam
2 Kartanegara Energi Persada Fasilitas Pembangkit di Kalimantan Timur, Supply Gas
Compressor, Tie in pipe line on shore 14 inch.
3 Kangean Energy Indonesia Pembuatan Jacket Platform dan load out - Pagurungan Utara
Field, Jawa Timur