November 6 th Exam November 13 th Tom Rossby Seminar Early Dec– Class Project.

Post on 06-Jan-2016

27 views 2 download

Tags:

description

Announcements. November 6 th Exam November 13 th Tom Rossby Seminar Early Dec– Class Project. Exam 1 problem 2 answer key is posted on the course website? I promised them that I'll have it by today. Here is the direct link : http://marine.rutgers.edu/dmcs/ms451/2006/exam/ - PowerPoint PPT Presentation

transcript

November 6th Exam

November 13th Tom Rossby Seminar

Early Dec– Class Project.

Exam 1 problem 2 answer key is posted on the course website? I promised them that I'll have it by today. Here is the direct link: http://marine.rutgers.edu/dmcs/ms451/2006/exam/

Thanks. Donglai

Announcements

fuHt

v

fvHt

u

bysy

bxsx

Solution to these timeDependent equations fora constant wind stress for three different depths

H=100m

H=20m

H=5m

H=100 meter

fuHt

v

fvHt

u

bysy

bxsx

H=100 meter

Wind turns off after1 inertial period

H=10 meter

Wind turns off after1 inertial period

fuHt

v

fvHt

u

bysy

bxsx

Drifter Trajectory in North Sea (van Aken DSR 2002)

Conservation of Angular Momentum (Vorticity!!)

x

z

Baroclinic (Depth Dependent) Pressure Gradient

Density from RU COOL Glider Across NJ Shelf

Thanks to Paul Linden.

20 25 30 35 40 45 50 55 60-15

-10

-5

0

m

20 25 30 35 40 45 50 55 60-15

-10

-5

0

m

20 25 30 35 40 45 50 55 60-15

-10

-5

0

m

20 25 30 35 40 45 50 55 60-20

-10

0

m

km north of the Battery

Along Channel salt/dye sections

Dye Conc10-11

May 4th

May 6th

May 7th

May 8th

10,000 particles on a Random Walk

2-D Random walk2-D Random Walk with Advection