Post on 07-Aug-2015
transcript
1HL DESIGN GROUP - PROJECT LEADER / DESIGNER
DASH LINE INDICATES BEAM LINE ABOVE
30th FLOOR PLANsc 1:75
The project involves renovation work at new office (31st floor) & addition of a spiral staircase to connect new office to existing one at 30th floor. The location of the new staircase is studied carefully to create comfortable circulation space around it without sacrificing the existing workstations. The biggest challenge is to minimize the impact of the new staircase to existing building structures, A.C. ducts & sprinkler pipes.
BLUE DASH LINE INDICATES EXISTING
FURNITURE TO BE DEMOLISED
RED DASH LINE INDICATES NEW
FURNITURE
NEW HOTDESKNEW SPIRAL STEEL STAIRCASE TO
ENGR’S DETAILR=167mm (24r)
EXISTING BUILT-INWORKSTATION
HL DESIGN GROUP OFFICE EXTENSION
RECTIFICATION OF A.C. DUCTS & SPRNKLER PIPE TO MAKE WAY FOR NEW STAIRACE
NEW SPIRAL STAIRCASE IN PLACE
CONSTRUCTION
CONNECTING PEOPLE
2HL DESIGN GROUP - PROJECT LEADER / DESIGNER HL DESIGN GROUP OFFICE EXTENSION
The renovation work at 31st floor office requires coordination with the contractors, office administra-tor & office tower management as renovation works can only be done after working hours. Besides that, a Bill of Quantity (BQ) is drafted to ensure new office design fits the given budget.
31st FLOOR FURNITURE PLANsc 1:100
RECTIFICATION OF A.C. DUCTS & PAINTING WORK INSTALLING PLASTER CEILING PLASTER CEILING TOUCH-UP INSTALLING LINEAR LIGHTS
NEW SPIRAL STEEL STAIRCASE TO
ENGR’S DETAILR=167mm (24r)
RED DASH LINE INDICATES NEW FURNITURE TO BE
ADDED IN FUTURE
CUTTINGTABLE
PRINTER
DISCUSSIONTABLE
RETRACTA
BLESLID
E
2600mm HIGHCURTAIN
AHU ROOM
ENTERTAINMENTAREA
PANTRY
MATERIAL LIBRARY
3HL DESIGN GROUP OFFICE EXTENSIONHL DESIGN GROUP - PROJECT LEADER / DESIGNER
50 x 8mm THK MS PLATE RAILING
50 x 8mm THK MS PLATE BANISTER
EXISTING RC COLUMN
EXISTING RC SLAB TO BE FINISHED WITH 4mm THK
VINYL FLOORING
100 x 75mm RHS CONNECTING TO CHS
TO EXISTING RC BEAM TO ENGR’S DETAIL
9.5mm THK PLASTER CEILING
TO ARCH’S DETAIL
31st FLOOR LEVEL
30th FLOOR LEVEL
200mm Ø CHS FIXED TO EXISTING
30TH FLOOR RC SLAB TO ENGR’S
DETAIL
50 x 8mm THK MS PLATE RAILING
50 x 8mm THK MS PLATE BANISTER
MS TREAD WITH CARPET INSET TO
ARCH’S DETAIL
SPIRAL STAIRCASE ELEVATION
4HL DESIGN GROUP OFFICE EXTENSIONHL DESIGN GROUP - PROJECT LEADER / DESIGNER
50 x 8mm THK MS PLATE BANISTER
TO BE FULLY WELDED ON MS TREAD
MS TREAD WITH CARPET INSET TO
ARCH’S DETAIL
SPIRAL STAIRCASE PLAN ON 31ST FLOOR
SC 1:25 TREAD DETAIL
SC 1:5
DASH LINE INDICATES50 x 8mm THK
MS PLATE RAILING
DASH LINE INDICATES OVER-LAPPING
MS TREAD BELOW
200mm Ø CHS FIXED TO EXISTING
30TH FLOOR RC SLAB TO ENGR’S
DETAIL
200mm Ø CHS FIXED TO EXISTING
30TH FLOOR RC SLAB TO ENGR’S
DETAIL
8mm THK CARPET INSET TO ARCH’S
SELECTION
6mm THK FOLDED MS PLATE
TO BE FULLY WELDED TO CHS
TREAD ABOVE
6mm THK MS PLATETO BE FULLY WELDED TO FOLDED MS PLATE & CHS
CARPET INSET READY TO BE INSTALLED ON STEEL TREAD
5HL DESIGN GROUP - PROJECT LEADER / DESIGNER MENARA HAW PAR REFURBISHMENT & LANDSCAPE DESIGN
The site is located at Menara Haw Par, Jalan Sultan Ismail, Kuala Lumpur, with numerous office workers and tourists coming from nearby monorail station. The site is developed into landscaped area to create transitional space before entering the main office building (Menara Haw Par) and act as noise buffer from the road. The shaded open area would become the interaction or event space for the office workers. Cratoxylum Cochinchinense trees are planted along the existing walkway to reinforce the ‘path’, while reflecting pool is placed in front of the main office building to become the focal point upon arrival. In addition, plants with thin-long leaves are selected to further enhance the ‘linearlity’ of the overall landscape design.
ZOYSIA GRASSPANDANUS PYGMAEUSCAESALPINIA FERREA ACALYPHA SIAMENSIS ACALYPHA WILKESIANACRATOXYLUM COCHINCHINENSE
N
TO M
ENA
RA H
AW
PA
R LO
BBY
EN
TRA
NCE
TO SHANGRI-LA HOTEL
FROM BKT. NANAS MONORAIL STATION
REFLECTING POOL
EVENTSPACE
PUBLIC PLAZA TERRACEDSLOPE
EVENTSPACE
CONNECTING LINES
CONTRACT DOCUMENTATION
PRESERVED EXISTINGMATURE TREE
FRO
M A
CRO
SS T
HE
ROA
DS
6HL DESIGN GROUP - PROJECT LEADER / DESIGNER MENARA HAW PAR REFURBISHMENT & LANDSCAPE DESIGNCONTRACT DOCUMENTATION
The sculptural walls define circulation within the landscaped area. The gradual increase in height of the sculptural wals adds rhythmic and dramatic effect to the space. The height of the walls is kept below 1.2m to improve safety by allowing optimum eye-sight throughout the space.
600 x 300 x 15mm THKCOMPRESSED
SANDSTONE WITH MULTIPLE GROOVE
FINISH
VOID
SCULPTURAL WALL ELEVATIONsc 1:75
SCULPTURAL WALL DETAILsc 1:25
120mm THK RC WALL TO ENGR’S DETAIL
6mm THK WELDED MS PLATE FRAME WITH POWDER COAT FINISH
20 x 30mm THK STAINLESS STEEL ANGLE WITH
RECESSED LED STRIP
PANDANUS PYGMAEUSSHRUB
20 x 30mm THK STAINLESS STEEL ANGLE WITH RECESSED LED STRIP
150mm THK RC FOOTING TO ENGR’S DETAIL
CAESALPINIA FERREA
VIEW OF LANDSCAPE FROM JALAN SULTAIN ISMAIL (RENDERING BY REDZUAN)
+34.45
+34.00
+34.00
EXISTING SITE CONDITION
SCULPTURAL WALL
7HL DESIGN GROUP - PROJECT LEADER / DESIGNER MENARA HAW PAR REFURBISHMENT & LANDSCAPE DESIGN
LOBBY FLOOR PLANsc 1:150
BLUE DAHS LINE INDICATES EXISTING
BRICK WALL TO BE DEMOLISHED
FIRELIFT
LIFT
LIFT
LIFT
LIFT
LIFT
LIFT
EXISTINGFIRE
STAIRCASE
EXISTINGFIRE
CONTROL-ROOM
LOBBY
EXISTING RESTAURANT
NEW CAFE
T=300mm, R=150mm (3r)NEW RC STEPS TO
ENGR’S DETAIL
EXISTING DRIVEWAY TO BE DEMOLISHED
AND LEVELED TO FFL+34.00
RED LINE INDICATES NEW 100mm THK BRICK WALL
WITH SELECTED FINISH ON BOTH SIDES TO ARCH’S SELECTION
CONCIERGE COUNTER TO
ARCH’S DETAIL
EXISTING STEPS TO BE DEMOLISHED AND
LEVELED TO FFL +34.00 TO ENGR’S DETAIL
EXISTING TC COLUMN
EXISTINGRAMP
LIFTLOBBY
VIEW OF NEW CAFE FROM LANDSCAPE (RENDERING BY AZWAN)
EXISTING VIEW OF MAIN APPROACH
NEW CAFE (RENDERING BY AZWAN)
N
The lobby refurbishment work includes the relocation of entry point, addition of new cafe and replacement of interior materials. The lobby interior is remeas-ured to draw as-built drawing as the original blueprint of the building is lost.
A
B
8HL DESIGN GROUP - PROJECT LEADER / DESIGNER MENARA HAW PAR REFURBISHMENT & LANDSCAPE DESIGN
NEW LOBBY ENTRANCE (RENDERING BY AZWAN) EXISTING LIFT LOBBYNEW LIFT LOBBY (RENDERING BY AZWAN)
SECTION A-Asc 1:150
SECTION B-Bsc 1:150
NEW SUSPENDED GLASS CANOPY WITH STEEL STRUCTURE
TO ENGR’S DETAIL
1200 x 600 x 20mm THKCOMPRESSED SANDSTONE WITH
HONED FINISH & MULTIPLE GROOVE PROFILE (COLOR SF108)
+34.00
+36.60
+36.80
COLOR COATED GLASS(RAL 8007)
1200 x 600 x 20mm THKCOMPRESSED SANDSTONE
WITH HONED FINISH (COLOR SF108)
2400mm LONG PENDANT LINEAR
WITH ACRYLIC HOUSING
950 x 2800 x 12mm THK TEMPERED GLASS PANEL
TO MANUF’S DETAIL
+36.60
+36.80
EXISTING CABINET DOORS TO BE CLADDED
WITH COLOR COATED GLASS
(WHITE)
9.5mm THK ‘BORAL UNISPAN’ PLASTER CEILING BOARD TO BE FIXED ON 610mm SPAN CEILING
MEMBERS
2400mm LONG PENDANT LINEAR
WITH ACRYLIC HOUSING
95 x 45mm THK RECLAIMED TIMBER BATTEN TO BE BOLTED
TO 80 x 60 x 5mm THK MS C-CHANNEL AND SUSPENDED
FROM EXISTING RC SLAB
LED STRIP
CEILING DETAILsc 1:40