L-3 Electronic Systems

• 45 years Experience with facilities in Halifax & Toronto

– Display Solutions

– Vetronics

– Weapon Systems Support

– Repair & Overhaul

– Systems Engineering

• Halifax

– Avionics test

– Repair & overhaul

– Build to Print

– ILS

3

Electronic Systems

Proprietary Information

Scope of Logistics Capabilities

New System Design

• Develop Logistics Databases (LSAR)

• Reliability, Maintainability, Availability Analysis

• Logistics Support Analysis (Sparing, LORA, LCC, FMECA, Maintenance Task Analysis, RCMA)

• Logistics Products (Maintenance Plans and schedules, Provisioning data, Technical Publications, Facilities, Training, Spares)

In-Service Support

• Life Cycle Management

• On-going Logistics Supportability Studies

• Technical Publications Management

• Support to R&O

• Materiel Management

• Life Cycle Cost Analysis

4

Electronic Systems

Proprietary Information

Halifax Class Modernization

• $2b Contract

– Design & Build

– In-Service Support

• Design & Build

– CCS

– 2D Radar

– 3D Radar

– Nav Radar

– ESM

– Fire Control Radar

– MultiLink

– IFF

5

Electronic Systems

Proprietary Information

Halifax Class Modernization

• Prime - Lockheed Martin Canada

– L-3 ES Tier 1 Partner

• ILS

• Logistics Engineering

• Reliability

• Maintainability

• LSAR

• Technical Publications

• Support to: – Training

– Test & Trials

6

Electronic Systems

Proprietary Information

Off the Shelf

• Why is this a good decision?

– Risk Reduction

• Cost

• Time

• Compatibility

– Lower overall procurement cost

– Proven Technology

– Existing field data

– Existing documentation

7

Electronic Systems

Proprietary Information

ILS & Off-The-Shelf…

Good Bad

8

Electronic Systems

Proprietary Information

LSAR

Level 3

Level 2 Level 1

A Proposed Solution

Mature ILS Data

Existing. Fully

Developed LSAR Immature ILS Data

or no LSAR Data.

Processing

Required

No LSA input Data.

Classical ILS

Approach required

9

Electronic Systems

Proprietary Information

LSAR

Level 3

Level 2 Level 1

The Reality

Mature ILS Data

Existing. Fully

Developed LSAR Immature ILS Data

or no LSAR Data.

Processing

Required

No LSA input Data.

Classical ILS

Approach required

10

Electronic Systems

Proprietary Information

The reality cont’d

• 7 Different OEMs

• 7 Different methods of delivery

• 7 Different interpretations of the DIDs

• 7 Different countries (including Canada)

• 7 Different explanations of the same issues…

• 1 headache

11

Electronic Systems

Proprietary Information

The Reality cont’d

• Unrealistic ILS Requirements

– Renegotiation to account for OTS solution

• No redesign

– DED List undefined

• Non-specific Data Item Descriptions (DIDs)

• Commonality needed

– Templates created for collating the data and ultimate upload into OmegaPS. Status Tool

12

Electronic Systems

Proprietary Information

LSAR Status

Creating the upload templates in

Excel allows a status of

completion to be created for

monthly reporting requirements.

13

Electronic Systems

Proprietary Information

The Reality cont’d

• Unrealistic ILS Requirements

– Renegotiation to account for OTS solution

• No redesign

– DED List undefined

• Non-specific Data Item Descriptions (DIDs)

• Commonality needed

– Templates created for collating the data and ultimate upload into OmegaPS.

– FMECA/RCMA Tool

14

Electronic Systems

Proprietary Information

L-3 Developed FMECA/RCMA Tool

15

Electronic Systems

Proprietary Information

The Reality cont’d

• Unrealistic ILS Requirements

– Renegotiation to account for OTS solution

• No redesign

– DED List undefined

• Non-specific Data Item Descriptions (DIDs)

• Commonality needed

– Templates created for collating the data and ultimate upload into OmegaPS.

– FMECA/RCMA Tool

– LCC Spreadsheet - Analyzer

16

Electronic Systems

Proprietary Information

LCC Objectives

System LCC analysis using Pennant Analyzer to

Prove compliance to the LCC requirements

Identification of significant cost drivers in each system and sub-system.

As time goes on, monitoring trends in support costs to identify possible supportability issues.

17

Electronic Systems

Proprietary Information

Why LSAR?

• Logistics Supportability Studies

• Sparing Analysis and LORA

• LCC

Source and repository for

logistics analysis data

• Synchronized data exchange

• CM Controlled

Data exchange and integration from multiple

sources

• Can be accessed via website search tool

Data Source for All StakeHolders

18

Electronic Systems

Proprietary Information

LSAR Data Search

19

Electronic Systems

Proprietary Information

How will COTS affect where ILS is going

It is not going away..

20

Electronic Systems

Proprietary Information

Current Environment (1)

• Constantly Changing Requirements

– Fleet role, fleet structure, fleet size

– Address thru agile, flexible logistics and maintenance

• More emphasis on Systems

– Systems vs. components

– Simpler maintenance chain but more dependence on 1st line effectiveness

– More dependence on 3rd line repair

• Increasing System complexity

– Evolving Technology changes

– Open Architecture drives tech refresh

21

Electronic Systems

Proprietary Information

Current Environment (2)

• Extended System Life Cycles –shorter technology life cycle

– Obsolescence management

• Greater Utilization of COTS

– Driven by lower initial cost

– Supply Chain and maintenance shifts downstream

– IP – on-going issue when seeking support alternatives

• More outsourcing

– OEM driven from original contractual arrangements

– Alternatives may be opaque given IP

22