O p e n M D C 1 . 0M o d u l a r D a t a C e n t e r O p t i m i z e d f o r O C P h a r d w a r e

Roberto Söderhäll/CBDO/Swedish Modules

Data Center

Facility

The Pro jec ta S u b p r o j e c t w i t h i n t h e D C F P r o j e c t

Launched at the OCP Summit in San Jose March 2018

The Ma in Ob jec t i vesOptimize the design for best maintainability

Optimized the design for best scalability

Energy efficient power & cooling design

Minimum Viable Product regarding robustness

The Modu le Des ignAll in One 12 Racks Scalable Module from 30 Racks

The Opt imized des ign fo rMa in tenance

“All Equipment maintained from the front side of

the racks”

Guide l ines fo r the Ma in tenance ob jec t i ve- All maintenance in cold aisle in front of the racks

- In-row Coolers maintainable from the cold aisle

- Cold aisle is best climate zone for technicians

The Opt imized des ign fo rSca lab i l i t y

Guide l ines fo r the Sca lab i l i t y ob jec t i ve- Scalable with minimum effort of site assembly

- Scalable with minimum impact of the energy efficiency

- Scalable with minimum impact of redundancy

- Cost and time efficient deployment on site

The Opt imized des ign fo rEnergy E f f i c iency

“Hot aisle Containment for best efficiency”

Guide l ines fo r the Energy E f f i c iency ob jec t i ve- Airflow management system with Hot aisle

containment

- Flexible cooling system Chilled Water or DX

- Maintain efficiency when scaling out

T h e G u i d e l i n e s f o r a M i n i m u m V i a b l e P r o d u c t r e g a r d i n g R o b u s t n e s s

G u i d e l i n e s f o r t h e M V P r e g a r d i n g R o b u s t n e s s- Fire protection 60 min fire proof shell

- Burglary protection steel in walls and ceiling

- Alarms fire and intruder alarms

- Applicable Standards ASHRAE, BICSI - Best practise

- DCIM TCP/IP compatible interface

The road to a success fu l Open Innovat ion P ro jec t• Ask the end users to participate

• Involved the top players in the Industry

• Be humble

The OCP Pro jec t P rocess

Our Miss ion i s to bu i ld the i n f ras t ruc tu re fo r the D ig i ta l Soc ie t yMaintainability - Cost- and Energy Efficiency

Openness – Scalability