Post on 16-Jan-2020
transcript
PERI GmbH Schalung Gerüst Engineerin Rudolf-Diesel-Straße 19 89264 Weißenhorn www.peri.com
PERI Scaffolding Technology at bauma 2016
Scaffolding technology news PERI intensifies activities in the growth market of scaffold systems
The new PERI UP Easy scaffolding system
Next generation facade scaffold
Safer, faster and now wider
PERI UP Flex Shoring Tower MDS for System Grid 150
PERI PEP Alpha
The steel tube slab props for daily use
Upgrade for the PERI UP Flex Weather Protection Roof LGS
Faster protection
Maximum flexibility for scaffolding construction PERI UP Scaffolding Systems for industrial usage
PERI expands its production capacities for scaffolding systems
Purchase of Silvergreen facility in Günzburg, Germany
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Scaffolding technology news PERI intensifies activities in the growth market of scaffold systems
In recent years, based on its ever-increasing involvement in the continuously growing worldwide market, PERI has been able to significantly expand the turnover in the scaffolding systems segment. Parallel to this, the number of customers and business partners has increased which the Weissenhorn-based company will be presenting a wide range of technological innovations to at bauma 2016.
By concentrating on the focal points of efficiency and safety, PERI has
aggressively expanded the scaffold technology corporate division in recent years
through the addition of new system components and application solutions.
Investment in advisory services, engineering and sales are also oriented to
conform with the corporate strategy which regards the worldwide prospering
growth of the scaffolding sector as a great opportunity for the future. As can be
seen by numerous reference projects, the fields of application of PERI UP
scaffolding technology are expanding. Except for building and infrastructure
construction, PERI scaffold systems in the meantime can now be seen as working
platforms and load-bearing constructions in many areas of the manufacturing
industry.
With regard to consulting and engineering, an integrated approach is taken in
providing support for all scaffolding customers. For this, PERI includes all the
experience gained from countless projects around the globe in the design and
execution. Scaffolding customer can therefore generally expect not only the best
problem-solving expertise but also the optimal solution for each specific
challenge. This applies to both the cost-effectiveness as well as safety at all
levels because both aspects are basically in the foreground of the entire PERI
system technology
PERI holds ready the rentable scaffolding material at over 120 logistics sites
worldwide. As a result, the contractor can avoid making any costly investments
and instead carry out very transparent calculations for individual, object-related
concepts as well as realizing cost-effective implementation. Another advantage is
apparent if scaffolding concepts for optimization are supplemented by
components taken from the PERI formwork portfolio.
Page 1 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
PERI uses the world's leading trade fair, bauma 2016, as the current shop
window for showcasing its extensive performance and innovation potential. The
company is presenting numerous innovations developed for the PERI UP
scaffolding technology – the focus is on the innovative PERI UP Easy Facade
Scaffolding.
Re-printing of this article is free of charge but with reference to PERI GmbH as the source
Copy kindly requested
Number of characters: 2325
Page 2 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
The new PERI UP Easy scaffolding system Next generation facade scaffold
The same question arises ahead of every technical development: is it right to take the next development steps going down the familiar route or use other approaches to achieve new and better solutions? For the new PERI UP Easy scaffolding system, PERI decided in favour of the latter option. It combines the fast assembly of a frame scaffold with the flexibility of modular scaffolding thereby exploiting the weight advantages of high strength steels. This combination gives rise to safety and work procedure benefits that were not previously possible in facade scaffolding activities to this degree as well as always being practice-oriented.
The key to this lies in the constructive centrepiece of the PERI UP Easy
scaffolding system: its open frame with the integrated rosette nodes. Through
these nodes, PERI UP Easy can be combined with the system components of the
PERI UP Flex Modular Scaffolding. Apart from possible adaptation to suit
complex building geometry, PERI UP Easy thus offers simple and rapid
installation on stair towers, brackets, internal guardrails, roof edge protection
scaffold or working platforms.
In addition, a number of new developments determine the efficiency of the
scaffolding system; for example, the Easy quick coupling system for connecting to
the scaffolding anchors. Without requiring any tools, the coupling is inserted into a
longitudinal hole in the frame or on a bracket, and fixed in position by being
turned 90°. Also following the principle of the tool-free assembly is the simple
corner configuration whereby no couplings are required, likewise the installation
of the decking which features the integrated protection against lifting.
Look at the scaffolders
PERI UP Easy is the result of intensive involvement with the working environment
found in scaffolding construction. All conversations and discussions with
scaffolders have repeatedly confirmed which working realities scaffold erection
teams are confronted with every day. In addition to the generally high risk of
accidents and time pressure, it is primarily the lifting and carrying of heavy loads
and working in forced postures that are seen as particularly detrimental to a
worker´s health. Through the use of high strength steels and the constructive
finishing touches, PERI UP Easy is one of the lightest steel facade scaffolding on
Page 1 | 4
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
the market. The low weight per unit area of 8.9 kg/m² results in approximately
20% lower weight in comparison to conventional frame scaffolding. Overall, this
means: a scaffolder has at least 500 kg less weight to carry, lift and install each
working day.
Safety and cost-effectiveness should never be a contradiction
On the contrary: working with or on scaffolding always means moving around in a
high-risk location. Based on this unalterable fact, PERI has always drawn the only
sustainable conclusion in scaffolding construction: not until work safety is
improved can the economic efficiency of the entire system be increased.
With the open frame and the resulting guardrail in advance, PERI has succeeded
in realizing this quantum leap. As the guardrail for the next scaffolding level is
already mounted without any additional components with the Easy Frame from
the level below the scaffolder can move around on all scaffold levels at all times
without requiring anti-fall protection.
The unique feature of the PERI UP Easy frame scaffolding is the PERI rosette
node on the frame whereby the boundaries between frame and modular
scaffolding merge together. This allows, for example, brackets to be connected
directly or scaffold staircases can be installed without any additional frame
columns. In all other assembly processes, considerable savings can also be
made in each case regarding materials and working time.
Through the use of the proven decking system taken from the PERI UP Flex
Modular Scaffolding, the advantages of self-securing decks as well as the very
quick Gravity Lock are now also being used with frame scaffolding.
Without limits in new and existing buildings
In addition to the erection speed when working on the facade, the ability to adapt
to the contours and geometries of the structure is always a decisive criterion.
Projections and recesses in the facade, cantilevered and free-standing structural
components: for the scaffolder, all of this can be equally well-managed thanks to
the unique assembly versatility of PERI UP Easy in combination with PERI UP
Flex. In this connection, the metric grid dimensions both in length and width also
play an important role. Through the 33 cm decking width, the scaffold decks can
be used in both 67 cm as well as metre-wide scaffolding.
Page 2 | 4
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Photo 1 The new PERI UP scaffolding system is one of the
lightest steel facade scaffolds available on the
market, and, in addition, it provides a high level of
safety in the system: the guardrail for the next level
is installed together with the Easy Frame from the
lower scaffolding level without requiring any
additional components.
(Photo: PERI GmbH)
Photo 2 Both the combi decking with a 66 cm width as well
as the 33 cm wide steel decks are designed with
the integrated lock against lift off. They can be
removed at any time. Without exception, all
decking covers the entire system width; there are
no gaps between the decks.
(Photo: PERI GmbH)
Photo 3 With PERI UP Easy, internal and external corners
are executed quickly and with very few system
components.
(Photo: PERI GmbH)
Photo 4 The Easy End Guardrail Frame installed in
advance is mounted from the lower scaffold level in
the next higher level as permanent end protection.
(Photo: PERI GmbH)
Page 3 | 4
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Re-printing of this article is free of charge but with reference to PERI GmbH as the source
Copy kindly requested
Number of characters: 4888
Page 4 | 4
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Safer, faster and now wider PERI UP Flex Shoring Tower MDS for System Grid 150
The PERI UP Flex Shoring Tower MDS shares its best features with the PERI UP Flex scaffolding system: it can be assembled extremely quickly and offers a high level of constructional safety for users. With a new head frame, it is even more versatile.
Since it was unveiled three years ago, the PERI UP Flex Shoring Tower MDS has
proven itself in many applications. With significant weight savings, it is
exceptionally light compared to conventional constructions with a similar range of
applications. No component weighs more than 16 kg which saves the energy of
site personnel and significantly improves the otherwise very strenuous manual
handling.
Safety equipment mounted in advance
In addition, the erection procedure is simplified through the special assembly
logic. The decks are transported upwards on the inside, i.e. in the area of the
shoring tower already protected, and then mounted on the respective higher-
positioned ledgers without tools from a safe working position. Following the same
principle, the guardrails are mounted in advance from the lower level in each
case. As a result, every new level is already secure before it even being
accessed. The reduced weight and assembly without tools accelerate assembly
and dismantling significantly.
New grid system, new system accessories
With an extended range of accessories, PERI has opened up new areas of
application for the PERI UP Flex Shoring Tower MDS. The most important new
component is the new Head Frame MDS 150 which has allowed the MDS
standard grid to be extended from 1.25 m to 1.50 m. This means the MDS can be
used under formwork systems with larger grid dimensions, e.g. SKYDECK slab
panels or slab tables. In addition, a new head spindle is now part of the product
portfolio. For ensuring fast horizontal moving, a new connection for the Shoring
Tower MDS is available which serves for mounting the proven transportation
wheel from the PERI programme.
Page 1 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Photo 1 All system components of the PERI UP Flex
Shoring Tower MDS are systematically assembled
and dismantled with site personnel in a safe
position through the guardrail in advance. The new
Head Frame allows the use of the shoring tower
with PERI systems such as SKYDECK Panel
Formwork or slab tables.
(Photo: PERI GmbH)
Re-printing of this article is free of charge but with reference to PERI GmbH as the source
Copy kindly requested
Number of characters: 2070
Page 2 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
PERI PEP Alpha The steel tube slab props for daily use
The new prop family, PEP Alpha, is classified as Class D in accordance with EN 1065 whereby the two prop types, PEP Alpha D-300 and D-350, cover around 80 % of the usual range of applications for steel tube props according to PERI´s own market observations.
The D-300 version reaches extension lengths of 1.80 m to 3.00 m while the larger
D-350 model covers the 2.00 m to 3.50 m range. The required load-bearing
capacity according to EN 1065 Class D is maintained through to the full extension
length and significantly exceeds this with smaller extension lengths. For the PEP
Alpha D-300, PERI confirms a load capacity of up to 41.4 kN, with up to 37.5 kN
for the D-350. These are exceptional practice-oriented values which show a very
positive increase compared with the norm. In comparison with the proven PEP
Ergo props, also from PERI, the PEP Alpha props have a more simple design.
They do without, among other things, details such as the possibility to repair the
prop in favour of a more favourable price.
Photo 1 With two versions of the PEP Alpha Slab Prop,
PERI introduces new, more cost-efficient props to
the market.
(Photo: PERI GmbH)
Page 1 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Re-printing of this article is free of charge but with reference to PERI GmbH as the source
Copy kindly requested
Number of characters: 1115
Page 2 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Upgrade for the PERI UP Flex Weather
Protection Roof LGS Faster protection
A weather protection roof makes the jobsite more independent of weather and precipitation but it is not always easy to use and also very often subjected to high operational demands.
PERI has been working on the solution – with a motor and heating. The PERI
Weather Protection Roof LGS on the basis of the LGS Lattice Girder System has
long since found its place in many construction projects as a lightweight
construction with large spans and safe operability. The advantage of having a
large-sized cover, however, makes planning difficult and unwanted loads such as
snow and ice to a potential problem. For winding and unwinding the sheeting,
PERI now offers with a solution complete with an electric motor which significantly
simplifies the operation. A concept for heating the keder sheeting will also be
presented: integrated heating wires ensure that snow accumulation is avoided
during the colder season.
Photo 1 Fast and smooth retraction of the Keder sheeting
without any effort – this is being presented by
PERI at bauma 2016.
(Photo: PERI GmbH)
Page 1 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Photo 2 A sheeting which can be heated ensures that
neither ice nor snow can accumulate on the
weather protection roof. Such a solution eliminates
not only the work required for clearing off the
snow. In addition, the width and span can be
increased when the roof is constantly free of snow
which in turn brings time and cost savings.
(Photo: PERI GmbH)
Re-printing of this article is free of charge but with reference to PERI GmbH as the source
Copy kindly requested
Number of characters: 1628
Page 2 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Maximum flexibility for scaffolding
construction PERI UP Scaffolding Systems for industrial usage
For use in industry, a scaffolding system must be extremely adaptable and quick to mount. At the same time, all working areas must fulfil the very high requirements for occupational safety. The fact that the flexible PERI UP Flex Modular Scaffolding System optimally meets all prerequisites has been proven in countless projects.
Currently, large amounts of materials are being used in the Northwest Redwater
Project in Canada – the world's most advanced oil sands refinery. Here, in
addition to important safety issues, the focus is on time and cost reductions
during the scaffold erection work. PERI has been supporting the internationally
active EPC company with 3D planning services as well as with a control software
for ensuring an optimized combination of scaffold planning and scaffold
execution.
The versatile range of additional system components for specialized applications,
such as suspended scaffolds, are continuously adapted to match the
corresponding needs of the users. The high material utilization of standard
components with a high level of execution efficiency can be seen as a great
success in this respect. Also finding increasing use is the combination of PERI UP
with the VARIOKIT Engineering Construction Kit. The uniform system grid
arrangement, standardized connecting means and the option of renting of all
system components make project-specific planning extremely cost-effective. At
bauma 2016 in Munich, the advantages and possibilities will be explained and
highlighted through a special exhibit.
Photo 1 The flexible and safe PERI UP modular scaffolding
is proving itself more and more in industrial
applications – as for the construction of this oil
sand refinery in Canada.
(Photo: PERI GmbH)
Page 1 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
Photo 2 In addition to system-related assembly and safety
benefits with PERI UP, the competent on-site
project support in particular is an important factor
regarding the reduction of time and costs.
Furthermore, the detailed 3D scaffolding planning
along with early consultation and coordination with
all participants increases work safety and efficiency
on construction sites.
(Photo: PERI GmbH)
Re-printing of this article is free of charge but with reference to PERI GmbH as the source
Copy kindly requested
Number of characters: 2008
Page 2 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
PERI expands its production capacities for
scaffolding systems Purchase of Silvergreen facility in Günzburg, Germany
The Weissenhorn-based company PERI has announced the purchase of the Silvergreen site in Günzburg. The new location will complement the main plant in Weissenhorn as the expansion possibilities there are very limited.
As part of the company´s successful strategy in the scaffolding sector and the
resulting increase in sales volumes, PERI urgently requires additional production
capacity. However, at the headquarters in Weissenhorn, the currently available
areas earmarked for expansion have been reserved for the expected future
growth of the central administration as well as the German PERI subsidiary. Also
for the core activity of formwork production in Weissenhorn, all reserve areas
must be kept for future growth. As the family business knows and appreciates the
advantages provided in the region, in particular the supply of highly skilled
qualified workers as well as reliable suppliers, the site acquired in Günzburg,
approx. 25 km away from Weissenhorn, presents an ideal complement. In the
future, the PERI Group´s main scaffolding manufacturing facility will be based at
this 135,000 m² area. The manufactured scaffolding systems are highly
appreciated worldwide by customers from the industry and the construction sector
due to the simple handling and high safety standards.
Leonhard Braig, Managing Director for Products and Technology at PERI
stressed that the existing production in Weissenhorn will continue as before. "The
purchase of the Silvergreen site marks for us a further important step as part of
our growth strategy in the scaffolding market. We take a long-term approach, and
the location based in Günzburg creates the framework conditions required for
future corporate growth."
PERI considers the location of the plant as a particular advantage. On the one
hand, it is a short distance from the headquarters in Weissenhorn and, on the
other, it has optimal accessibility from a logistics perspective though the direct
connection to the A8 motorway. During the course of this year, it is planned to
commence production of scaffolding components; the new facility will create new
jobs for around 90 skilled personnel.
Page 1 | 2
Press Release bauma 2016 Scaffolding
PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 89264 Weissenhorn Germany Phone +49(0)7309.950-0 Fax +49(0)7309.951-0 Contact Dipl.-Ing. Martina Pankoke, MBM Phone +49(0)7309.950-1191 Mobile +49(0)151.12 04 14 64 Fax +49(0)7309.951-1191
The successful growth strategy adopted by PERI is also reflected in the figures. In
2015, PERI was able to increase turnover by 13 % thus surpassing its own sales
record established in 2008. For Dr. Fabian Kracht, Managing Director for Finance
and Organization, it is no coincidence. "Through the early and consistent
internationalization strategy that was implemented, PERI could participate in and
benefit from the growth markets in Asia, America and the Middle East. In the
meantime, PERI realizes nearly 90 % of its turnover abroad. As a result of this
international positioning, the company is also able to better compensate if faced
with national economic crises as experienced in 2015, for example, in Brazil or
Ukraine."
Photo 1 PERI has secured the entire, approx. 135,000 m²
site in Günzburg – located around 25 km from
Weissenhorn – including the office building and
production halls.
(Photo: PERI GmbH)
Re-printing of this article is free of charge but with reference to PERI GmbH as the source
Copy kindly requested
Number of characters: 2804
Page 2 | 2