Hydro Test & Drying Procedure

transcript

Delete it, this is irrelevant.

Change to “SP-P-1004.01-5030-001”

Change to “personnel”

To check against requirement,it should be 1.bar min.

Please clarify. - SW

Please clarify.

e

9) Re-instatement format to be sign off by PMC.

Please describe the criteria of categories "C" punch for guidances if M/Cwas over.

Please describe the process of manual cleaning with acceptance conditionafter Hydro-Test.

Please describe the internal pipe preservation after cleaning before shipping-to offshore for installation and Tie-In.