PROCEEDINGS OF THE 140th CONSENT COMMITTEE MEETING (CCM-CFO-Non-EIA) HELD ON 3-4-2013 (Wednesday) AT 3:00 PM Members present:
Sl.No Name Designation
1. Sri. H P Prakash, IFS
Member Secretary and Chairman of the Committee
2. Sri.D.R.Kumaraswamy,
Senior Environmental Officer -HWM Cell and CEO-2 (I/C) and Member
3. Sri Vijaykumar Board member---------Member
4. Smt. Vijaya Hegde,
Environmental Officer and Member Convener
5. Sri S. Pranesh.
KASSIA Karnataka Small Scale Industries’ Association----------Member
Members Absent:
1. Chairman, CII, Karnataka State Council, Bangalore The following subjects were discussed in the meeting:
SL NO.
SUBJECT
Decision Taken
1. M/s. Gadag Enviro Tech, Plot. No. 48-P, Narasapura Growth Center, KIADB Indl. Area, Gadag District.
The committee recommended to issue the first CFO for the operation of Common Biomedical waste treatment facility for the period from 01.07.2012 to 30.06.2013 with conditions.
2. M/s. AT India Auto Parts Private Ltd, Plot No. 33 and 34, Bidadi Industrial Area, Bidadi, Ramnagar Taluk and District.
The committee recommended to issue the first CFO to the industry for the metal casting and machining of capacity 1423 TPM for the period up to 30.06.2013 with conditions.
3. M/s. ITC R & D Centre, Plot No. 3, 1st Phase, Peenya Industrial Area, Bangalore.
The committee recommended to issue the first CFO for the expansion activity with its validity period to merge with that of its existing consent, i.e., with validity up to 30.06.2013 with conditions. However, the issue of CFO shall be taken up only after submission of copy of EC from the industry.
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 2 of 23
4. M/s. GE India Technology Centre Private Ltd, # 122, EPIP, Phase-II, Hoody village, Whitefield, Bangalore – 66.
The committee recommended to issue CFO for the new activity as per the CFE expansion order with the validity period to merge with that of the existing CFO, i.e., for the period up to 30.06.2014 with conditions.
5. M/s. Madhavi Edible Bran Oils (Raichur) Pvt. Ltd, Plot 212/P-5, Raichur Growth Center, KIADB Industrial Area, Kuknoor Village, Raichur District.
The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions to establish only solvent extraction plant and not the refinery which requires EC. A commitment in this regard shall be obtained before the issue of CFO.
6. M/s. Precot Meridian Ltd, Plot No. 14 (P), 15, 16, 26, 27 & 28P, SEZ Textile, KIADB Industrial Area, Hassan Taluk & District.
The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions.
7. Global Ecocarb Pvt. Ltd, Sy. No. 12/3, 9/2, 9/9, 13/5 and 16/7 of Bennanayakanahalli Village, Settikere Road, Tiptur Taluk, Tumkur District.
The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions.
8 M/s Rajshil Papers Pvt. Ltd., 6A, KIADB Ind Area, Nanjanagud-571302
The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions.
9 M/s Bando (India) Pvt Ltd., Plot No. 275 to 279, Narsapura, KIADB Ind Area, Kolar Tq and Dist
The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions.
Other Issues: Apart from the above issues, SEO-HWM has brought to the notice of the committee about issue of authorizations to 317 industries under Hazardous Waste (Management,, Handling and Trans boundary Movement) Rules, between the period 1-4-2012 to 31-3-2013. The details of the industries are as per
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 3 of 23
Sd/
Chairperson of the Committee and Member Secretary
Sd/ Member Convener
To, 1. Sri K Vijaykumar, BE, MIE, FIV, Shursti, Kadri Kibbattalu, House No. 3-19-
1619/14, 3rd Ward, Kadri, Mangalore-575002, for kind information 2. The Chairman, CII, Karnataka State Council, No. 1086, 12th main, HAL 2nd stage,
Indiranagar, Bangalore-08 for kind information 3. Sri Pranesh, KASSIA, 1/106, 17th cross, Magadi Chord Road, Bangalore-40 for
information. 4. Corporate cell for information and n/a. 5. CEO-1 and CEO-2 6. SEO-HWM, SEO-Mines, SEO-Infrastructure, SEO-17 category, 7. EO1-17 cat, EO2-17 cat, EO-Non EIA-Bangalore region, EO-Non EIA-other than
Bangalore region, 8. PA to Chairman to bring it to the notice of Hon’ble Chairman. 9. PA to Member Secretary to bring it to the notice of Hon’ble Chairman. 10. DEO-Mines, DEO-Bangalore region, DEO1-other than Bangalore, DEO-2 other
than Bangaore, DEO-17 cat, 11. All AEOs
Annexure-1. The committee ratified the action taken by the SEO-(HWM) cell in issuing the authorisations:
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 4 of 23
Annexure-1
Sl.No Name & Address of the Industry Period of Authorization from and to
1 Millennium Chemi Pharma (Mysore) Pvt LtdNo. 49, Mysore Belgola Industrial Area, Metagalli, Mysore ‐ 570 016
22‐Nov‐2011 30‐Jun‐16
2 Ripple Fragrances Exports Pvt Ltd(Candle Unit), Plot No. 154‐156, Belagola Industrial Area (Metagalli) Mysore ‐ 570 016
30‐Jan‐2012 31‐Dec‐16
3 Ripple Fragrances Pvt LtdPlot No. 154‐156, belagola Industrial Area (Metagalli) Mysore‐570 016
1‐Jan‐2012 31‐Dec‐16
4 Yshawi Fish & Oil CompanyPithrody, Udyavara‐ 574 118
3‐Dec‐2011 30‐Jun‐16
5 Dhruvadesh Motors Pvt LtdNo. 150/3, Opp. Standard tile's Factory, Bellary Road, New Police Station, Yelahanka, Bangalore ‐ 560 064
2‐Mar‐2012 30‐Sep‐16
6 Metcraft Engineering Plot No. 235, 2nd Phase, KIADB Industrial area, Harohalli, Ramanagara
3‐Oct‐2011 30‐Jun‐16
7 Guhring India Pvt LtdPlot No. 129, IV Phase, Bommasandra Industrial Area, Bangalore ‐ 560 099
8‐Sep‐2011 31‐Dec‐15
8 Advaith Motors Pvt LtdPlot No. 26, A, B, C, Mysore Hunsur Main Road, Belwadi Industrial Area, Mysore ‐ 570 018
16‐Jan‐2012 30‐Sep‐16
9 Sri. Siddhartha Institute of TechnologyMaralur, Tumkur ‐ 572 105
1‐Jan‐2012 31‐Dec‐16
10 Batliboi LtdNo. 24, 3rd Main, Veerasandra Industrial Area, 19 KM, Hosur Road, Bangalore ‐ 560 100
23‐Jan‐2012 30‐Sep‐16
11 Syed Zakir Hussain & OthersNo. 332/1, Thimmaiah Road, Vasanth Nagar, Bangalore ‐ 560 052
6‐Jun‐2012 31‐Dec‐15
12 Yashawini IndustriesNo. C‐94, Industrial Estate, Yadavagiri, Mysore‐570 020
15‐Mar‐2012 30‐Jun‐16
13 Viya Manga Wheelers Pvt LtdNo. 552/512, Maruthi Nagar, Kogilu Main Road, Yelahanka, Bangalore ‐ 560 064
24‐Nov‐2011 30‐Sep‐16
14 Omni Matrix Pvt LtdPlot No. 48 K 1 & K 2, Yellupura KIADB Industrial Area,
20‐Jan‐2012 31‐Dec‐16
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 5 of 23
Doddaballapur, Bangalore ‐ 561 203 15 Charoen Pokphand (I) Pvt Ltd
Feed Mill Division, sy.no. 130, Opp Grinwell, Boodigere Road, Off Old Madras Road, Bangalore ‐ 560 049
2‐Dec‐2012 30‐Sep‐15
16 Tech Steel Products LtdNo. 671, Nagawara, Thanisandra Main Road, SRK Nagar, Bangalore ‐ 560 077
1‐Oct‐2011 30‐Sep‐16
17 Shirdi Sai Engineering CollegeSai Leo Nagar, Samandur, Guddanahalli, Anekal, Bangalore ‐ 562 106
1‐Jan‐2012 31‐Dec‐16
18 Hindustan Construction Co. LtdPadue Cavern Project, H.No. 18‐3 (1), Ashiyana, Near Masjid, Shirva, Udupi ‐ 574 116
7‐Dec‐2011 30‐Sep‐16
19 AG Flex Technologies (P) LtdNo. 257, 258, Hebbal Industrial Area, Mysore‐ 570 016
23‐Dec‐2011 30‐Jun‐16
20 Volvo India Pvt LtdNo. 66/1, Lakeview Building 2nd floor, Bagmane Tech Park, Byrasandra, Bangalore ‐ 560 093
8‐Dec‐2012 31‐Dec‐16
21 Grace TexproNo. 24 F2, 1st Phase, Kumbalgodu Industrial Area, Behind Pepsi Factory, Mysore Road, Bangalore ‐ 560 074
17‐Oct‐2011 30‐Sep‐16
22 Tauruz No. 7, Panthrapalya Next to BM Valley High School
2‐Dec‐2012 30‐Sep‐16
23 DIC India Ltd# 66A, Bommasandra Industrial Area, Hosur Road, Bangalore ‐ 560 099
7‐Nov‐2011 30‐Sep‐16
24 Kohinoor IndustriesBellampalli Village, Kukkikatte, Udupi
14‐Dec‐2011 30‐Sep‐16
25 Automotive Axles Ltd Unit 2No. 34 & 35 P, Hootagali Industrial Area, Hunsur Road, Mysore ‐ 570 018
9‐Jan‐2012 30‐Jun‐16
26 Samsung India Software Operations Pvt LtdNo. 66/1, Bagmane Lakeview, Block 'B' Bagmane Techpark, CV Raman Nagar, Bangalore ‐ 560 093
20‐Jan‐2012 31‐Dec‐16
27 Sony India Pvt LtdVridavan Tech Village (SEZ) 2nd Floor, Hibiscus Tower‐2, Outer Ring Road, Devarabisenhalli, Varthur, Bangalore ‐ 560 037
1‐Jan‐2012 31‐Jun‐2016
28 Trelleborg Sealing Solutions India Pvt LtdNo. 22/9, Sy.No. 9, Beratana Agrahara, Hosur Main Road, Bangalore ‐ 560 100
6‐Feb‐2012 30‐Sep‐16
29 GE Money Financial Service Pvt Ltd 29‐Feb‐2012 31‐Dec‐16
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 6 of 23
No. 148, Infantry Road, 2nd Floor, Embassy Square, Bangalore ‐ 560 001
30 SBI Cards A Payments Service (P) LtdNo. 148, Infantry Road, 2nd Floor, Embassy Square, Bangalore ‐ 560 001
29‐Feb‐2012 31‐Dec‐16
31 Cauvery Motors Pvt LtdPlot No. 49/50, Industrial Estate, Hebbal Mysore ‐ 570 016
22‐Dec‐2011 30‐Sep‐16
32 Carl Bechem Lubricants India Pvt LtdNo. 28, Bidadi Industrial Area, Bidadi, Harohalli Road, Bangalore Rural District
16‐Jan‐2012 30‐Jun‐16
33 Mann and Hummel Filter Pvt LtdPlot No. 231/1, 11th Main Road, 3rd Phase, Peenya Industrial Area, Bangalore ‐ 560 058
27‐Feb‐2012 31‐Dec‐16
34 Saravana Alloys Steels Pvt LtdSy.No. 41, Kasankadi Road, Hirebaganal Village, Koppal
10‐Feb‐2012 30‐Jun‐16
35 Southern Auto Products No. 41, A, 2nd Phase, Peenya Industrial Area, Bangalore ‐ 560 058
24‐Feb‐2012 31‐Dec‐16
36 Navodaya Medical CollegeHospital & Research Center, Raichur Dist.
20‐Mar‐2012 30‐Jun‐12
37 MK Auto Tech Pvt LtdChallakere Branch, Hotteppanahally, Challakere, Chitradurga Dist.
1‐Feb‐2012 30‐Sep‐16
38 Sri. M. Visvesvaraya Institute of TechnologiesKrishnadevarayan Agrahar, Hunasamaranahalli, International Airport Road, Bangalore ‐ 562 157
30‐Mar‐2012 31‐Dec‐16
39 Wintek Flexo PrintsNo. 33 & 34, Prathiba Industrial Estate, JP Nagar, Kashi Nagar, Yelachanahalli, Bangalore ‐ 560 078
2‐Feb‐2012 31‐Dec‐16
40 Tokia Rubber Auto Parts India Pvt LtdPlot No. 337, Harohalli KIADB Industrial Area, Kanakapura Taluk, Ramanagar Dist
1‐Mar‐2012 30‐Jun‐16
41 Visvesvaraya Technological UniversityMacche Village, Belguam ‐ 590 018
1‐Jan‐2012 31‐Dec‐16
42 New Horizon Educational & Cultural TrustSy.No. 14, 39, 40, 41, 42 of Kadubiseenahalli, Varthur Hobli, Outer Ring Road, Bangalore East
1‐Feb‐2012 31‐Dec‐16
43 Fast Tracksy.no. 58/2, Marpady Village, Alangar, Moodabidri, D.K.
9‐Mar‐2012 30‐Sep‐16
44 Symbol Technologies Pvt Ltd(A Motorola Company) RMZ Ecospace, Block‐3 B, Sarjapura Outer Ring Road, Varthur, Bangalore ‐ 560 103
2‐Mar‐2012 31‐Dec‐16
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 7 of 23
45 Huawei Technologies India Pvt LtdLevel‐3, Leela Galleria, The Leela Palace 23, Air Port Road, Bangalore ‐ 560 008
2‐Mar‐2012 31‐Dec‐16
46 Sogefi MNR Filtration India Pvt LtdNo. 1, Sy.No. 87, Kasavanahalli Main Road, Carmelaram, Bangalore ‐ 560 035
6‐Feb‐2012 31‐Dec‐16
47 Tata Motors LtdDharwad Works, Munmigatti, Dharwad‐580 007
22‐Jan‐2012 31‐Dec‐16
48 Crest Composite & Plastics Pvt LtdPlot No. 552 (B) & 558 C, KIADB Belur Industrial Area, Dharwad
15‐Mar‐2012 30‐Jun‐16
49 GM Institute of TechnologyPB Road, Davangere‐577 006
16‐Jan‐2012 31‐Dec‐16
50 Yuken India LtdEngineering & Foundry Division Sy.No. 84‐171, 85‐172, Hedaginabele Village, Madivala, Malur Taluk, Kolar
25‐Jan‐2012 30‐Jun‐16
51 Premiere IlluminationsNo. 27/H, 3rd Stage, Industrial Suburb, Mysore ‐ 570 008
22‐Mar‐2012 30‐Jun‐16
52 KPR Fertilisers Ltdsy.no. 108, 109, Halavarthi Village, Near Kunikeri Thanda, Koppal ‐ 583 231
1‐Aug‐2012 30‐Jun‐16
53 Chettinad Cement Corporation LtdKallur Project, Sangem K, Bhaktampalli, Chamdapur, Chincholi Taluk, Gulbarga‐ 585 305
15‐Mar‐2012 30‐Jun‐16
54 Mivin Engineering Technologies Pvt LtdPlot No. 531, 4th Phase, Peenya 2nd Stage, Bangalore ‐ 560 058
24‐Mar‐2012 30‐Sep‐16
55 BVVS Basaveshwar Engineering CollegeBagalkot ‐ 587 102
12‐Mar‐2012 31‐Dec‐16
56 SLK Software Services Pvt LtdNo. 193, Chandrappa Complex, New BEL Road, Mathikere, Bangalore ‐ 560 054
22‐Mar‐2012 31‐Dec‐16
57 Kemwell Pvt Ltd Unit Bio Pharma34th KM, Tumkur Road, T‐Begur, Nelamangala, Bangalore ‐ 562 123
6‐Mar‐2012 30‐Jun‐16
58 Golden Heights59th C Cross, 4th Block, Rajajinagar, Bangalore ‐ 560 010
28‐Feb‐2012 31‐Dec‐16
59 Sri. Revana Siddeshwara Educations TurstNo. 1, Lakshinilaya, 4th Cross, Papanna Lane, Ganganagar, Bangalore ‐ 560 010
8‐Mar‐2012 31‐Dec‐16
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 8 of 23
60 Sambhram Institute of TechnologyAmba Bhavani Temple Road, M.S. Palya, Bangalore ‐ 560 070
2‐Feb‐2012 31‐Dec‐16
61 Devaraj Urs. Academy of Higher Education & ResearchTamaka, Kolar
22‐Feb‐2012 31‐Dec‐16
62 Futuristic Diagnostic Imaging Center Pvt LtdPlot No. 282, 4th Phase, Link Road, Jigani Industrial Area, Bangalore ‐ 560 105
4‐Feb‐2012 30‐Jun‐16
63 Malik EngineeringPlot No. 126, KIADB Industrial Estate, 2nd Phase, Jigani Anekal Taluk, Bangalore ‐ 562 106
28‐Mar‐2012 30‐Sep‐16
64 KBD Sugars & Distilleries Ltd20th Mile, Tumkur Road, Nelamangala, Bangalore ‐
16‐Mar‐2012 30‐Jun‐16
65 Arshed Ispatsy.no. 76/B, 74/1, 74/2, 73/B, 64/B, 75 & 42/5, Kerchalli Village, Koppal
19‐Apr‐2012 30‐Jun‐15
66 Bhagyodaya Motors Pvt LtdOpp. DC. Office Hospet Road, Koppal Dist.
16‐Apr‐2012 30‐Sep‐16
67 KBN College of Engineering Gulbarga ‐ 585 104
30‐Mar‐2012 30‐Jun‐16
68 Associate Decon LtdPlot No. 1, 4th Phase, KIADB Industrial Area, Huralagere, Malur Railway Station, Malur ‐ 563 160, Kolar
19‐Apr‐2012 30‐Jun‐16
69 Ajax Fiori Engineering (I) Pvt LtdNo. 3, KIADB Industrial Area, Bashettihalli, Doddaballapur ‐ 561 203
28‐Mar‐2012 31‐Dec‐16
70 Pride CoatNo. 26, KNS Engg. College, Thirumenahalli, Jakkur, Yelahanka, Bangalore ‐ 560 064
10‐Apr‐2012 30‐Jun‐16
71 Vega Funmobiles Pvt LtdPlot No. 635 B, Peeranwadi Khadarwadi Village Road, Udyambag, Belgaum Dist.
26‐Apr‐2012 30‐Jun‐16
72 S. Nijalingappa Medical College & Hangai Shri Kumareshwar Hospital & Research CenterNavangagar, Bagalkot Dist.q
5‐Mar‐2012 30‐Jun‐16
73 Vega Auto Accessoreis Pvt LtdBEMICEL Industrial Estate, Udyambag, Belgaum Dist.
26‐Apr‐2012 30‐Jun‐16
74 A Shama Rao FoundationSrinivasa Institute Medical Sciencws & Research Center Village No. 49, Surathkal, Mangalore D.K.
30‐Jan‐2012 30‐Jun‐16
75 Hypartek Fluid Power Pvt LtdSy.No. 56, Balagaranahalli, Neralur, Bandapura Road,
26‐Mar‐2012 30‐Sep‐16
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 9 of 23
Attibele, Bangalore ‐ 562 107 76 RL Jalappa Institute of Technology
Kodigehalli, Doddaballapur ‐ 562 203 30‐Mar‐2012 31‐Dec‐16
77 KNS Institute of TechnologyHegdenagar, Thirumenahalli, Bangalore ‐ 560 064
7‐Mar‐2012 31‐Dec‐16
78 Universal Air Products Pvt LtdPlot No. 10 Part 1, KIADB Industrial Area, Kunigal ‐ 572 130, Tumkur
9‐Dec‐2011 30‐Sep‐16
79 JSW Steel Processing Center LtdTorangagallu, Bellary ‐ 583 275
23‐Mar‐2012 30‐Jun‐16
80 STS Titelflex India Pvt LtdKIADB Industrial Area, Doddaballapur, Bangalore ‐ 561 203
21‐Mar‐2012 31‐Dec‐16
81 Sri. Krishnarajendra Silver Jubilee Technological Institute KR Circle, Bangalore ‐ 560 001
28‐Mar‐2012 31‐Dec‐16
82 Glodman Sachs Service Pvt LtdSunriver Building, Embassy Glof, Link Business Park, Intermediate Ring Road, Bangalore ‐ 560 078
24‐Jan‐2011 31‐Dec‐15
83 Advaith Motors Pvt LtdPlot No. 26, A, B, C, Mysore Hunsur Main Road, Belwadi Industrial Area, Mysore ‐ 570 016
6‐Jan‐2012 30‐Sep‐16
84 ACC LtdKurugodu Road, Kudithini Village, Bellary (Taluk & Dist)
30‐Jan‐2012 30‐Jun‐16
85 Ankith Fasteners (P) Ltdsy.no. 294, 4th Main, Haragadde Village, Adjacentto Jigani Industrial Area, Anekal Taluk, Bangalore
13‐May‐2011 30‐Jun‐15
86 Autoliv India Pvt LtdPlot No. 44, KIADB Industrial Area, Kadakola, Jayapura Hobli, Mysore ‐ 571 311
9‐May‐2012 30‐Jun‐16
87 Embassy TechsquareKatha No. 298/189/172, Sy.No. 10/1A‐‐‐173 of Kadubeesanahalli Village, Varthur Hobli, Bangalore
25‐Apr‐2012 30‐Jun‐16
88 SS Institute of Medical Sciences and Research CentreNH‐4, Bypass, PB Road, Davangere‐577 005
15‐Mar‐2012 30‐Jun‐16
89 Al Ameen Medical College & HospitalAthani Road, Bijapur 580 108
2‐Apr‐2012 30‐Jun‐16
90 First Sources Solutions LtdAkshay Centre, Gokul Road, Hubli, Dharwad District
9‐Apr‐2012 31‐Dec‐16
91 First Sources Solutions LtdAkshay Centre, Gokul Road, Hubli, Dharwad District
6‐Mar‐2012 30‐Sep‐16
92 KSRTC Nelamangala Depot, Arasinakunte Village, NH‐4,
6‐Mar‐2012 30‐Sep‐16
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 10 of 23
Tumkur Road, Bangalore Rural District 93 Innova Consumer Care (P) Ltd
Katha No. 91, sy.no. 28‐29, Soukya Road, Kacharakanahalli, Jadigenahalli Hobli, Hoskote Taluk, Bangalore Rural Dist.
22‐Feb‐2012 30‐Jun‐16
94 Shakunt Enterprises Pvt LtdPlot No. 577, C & 577, "D" Belur Industrial Area, Dharwad‐580 011
14‐Mar‐2012 30‐Jun‐16
95 M.S. Ramaiah Medical CollegeMSR Nagar, MSRIT Post, Bangalore ‐ 560 054
14‐Mar‐2012 30‐Jun‐16
96 Radhamani Exports LtdPlot No. 314 (P) 315 (P), 315 (P), 316, 318 & 319 (P) Bommasandra Jigani Link Road, Industrial Area, Bangalore ‐ 560 105
24‐Mar‐2012 30‐Sep‐16
97 Megamlies Bearing Cups Pvt LtdPlot No. 86 (C2), 5th Road, KIADB Industrial Area, Jigani, Bangalore ‐ 560 105
31‐Mar‐2012 31‐Dec‐16
98 Dolphin Die Cast (P) LtdNo. 266 B, Bommasandra Jigani Link Road, Jigani Industrial Area, Bangalore ‐ 560 105
28‐May‐2012 30‐Jun‐16
99 Momentive Performance Materials (India) Pvt LtdSy.No. 9 Phase‐2, Electronic City, Hosur Road, Bangalore ‐ 560 100
20‐Mar‐2012 30‐Jun‐16
100 Mphasis LtdTanglin Development LtdSEZ Bangalore Mysore High Way Road, Mylasandra Village, RVCE, Bangalore ‐ 560 059
5‐Apr‐2012 30‐Jun‐16
101 Sparkvee Fine Chemicals Pvt LtdSy.No. 106, Plot No. 55, 56, 71 & 72, KIADB, Raichur Growth Center, Chicksugur, Raichur Dist
25‐Apr‐2012 30‐Jun‐16
102 Udupi Power Corporation LtdBerth No. 15, UPCL, Jetty within NMPT Premises Panambur, Mangalore
12‐Jun‐2012 30‐Jun‐12
103 Protective Coating Pvt LtdPlot No. B‐210, 2nd Stage, Peenya Industrial Area, Bangalore ‐ 560 058
23‐May‐2012 30‐Jun‐16
104 BOC India Ltd1800 TPD, JSW Steel Ltd, Premises, Toranagallu‐585 123, Bellary
4‐Jun‐2012 30‐Jun‐12
105 Rangoli PrintsNo. 42, Kudlu Main Road, Hosur Road, Bangalore ‐ 560 068
4‐Jun‐2012 30‐Jun‐16
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 11 of 23
106 Savannah Hotels Pvt LtdNo. 43/3, Whitefield Road, Bangalore ‐ 560 067
27‐Apr‐2012 30‐Sep‐16
107 RV College of Engineering Mysore Main Road, Bangalore ‐ 560 059
22‐Mar‐2012 31‐Dec‐16
108 Rajarajeswari Medical College and HospitalKambipura Mysore Road, Bangalore ‐ 560 074
3‐Jan‐2012 30‐Jun‐16
109 Carclo Technical Plastics Pvt LtdNo. 27 A (2) KIADB Industrial Area, Doddaballapura, Bangalore ‐ 561 203
11‐May‐2012 31‐Dec‐16
110 RS Surfa CoatsSy.No. 30, Seetharampalya, Opp Graphite India, Mahadevapura, Bangalore
23‐Jul‐2011 30‐Jun‐16
111 Sheraton BangaloreBrigade Gateway No. 26/1, Dr. Rajkumar Road, Malleswaram (west) Bangalore ‐ 560 055
3‐Dec‐2011 30‐Sep‐16
112 Tanglin Development LtdSy.No. 29, 31, Pattanagere Village, & 12/1, 12/2, of Mylasandra Village, Kengeri, RVCE, Mysore Road, Bangalore ‐ 560 059
20‐Apr‐2012 31‐Dec‐16
113 KHF Components Pvt LtdSite Nos. 20, 20/1, Survey No. 12, Double Road, Hoody Village, Mahadevapura Post, Bangalore ‐ 560 048
7‐Dec‐2011 31‐Dec‐2015
114 Rushil Décor LimitedPlot No. 58, 59, 60 Amble KIADB Industrial Area, Amble Hobli, Chikmagalur Taluk & District
9‐Jul‐2012 30‐Sep‐2016
115 R‐Chem Organics (Bangalore) Pvt LtdPlot No. 7 G & F, KIADB Industrial Area, Somanahalli, Maddur Taluk, Mandya Dist.
29‐May‐2012 30‐Jun‐12
116 Tasty World Pvt LtdPlot No. 10 P, & 11 KIADB Industrial Area, Amble, Chikmagalur
16‐Jun‐2012 31‐Dec‐16
117 Jain Motors# 868, N3‐N7, Shankar Vihar Extension, PB Road, Davangere
30‐May‐2012 30‐Sep‐16
118 Vinayaka CNC Centre Pvt LtdNo. A‐347, 9th Main Road, 2nd Stage, Peenya Industrial Estate, Bangalore ‐ 560 058
6‐Jun‐2012 30‐Sep‐12
119 Vinayaka CNC Centre Pvt LtdNo. A‐347, 9th Main Road, 2nd Stage, Peenya Industrial Estate, Bangalore ‐ 560 058
6‐Jun‐2012 30‐Sep‐12
120 Tanglin Development LtdNo. 29, 31 of Pattnagere Village, & 12/1, 12/2, of Mylasandra Village, Kengeri Hobli, RVCE Post, Mysore
20‐Apr‐2012 31‐Dec‐16
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 12 of 23
Road, Bangalore ‐ 560 059 121 KPR Fertilisers Ltd
Sy.No. 109/6 & 109/10, Halavarthi Village, Kunikeri Post, Koppal
16‐May‐2012 30‐Jun‐16
122 Allied Blenders & Distillers Pvt Ltd8th Mile Stone, Tumkur Road, Nagsandra Post, Bangalore North Taluk, Bangalore ‐ 560 073
19‐Apr‐2012 30‐Sep‐16
123 SS Industries Shed No. 7 A, Veerasandra Industrial Area, Hosur Road, Bangalore ‐ 560 100
5‐Mar‐2012 30‐Jun‐16
124 Bostik India Pvt Ltd Unit IIPlot No. 16, B & C, Bommasandra Industrial Area, Anekal, Bangalore ‐ 560 001
7‐Jun‐2012 30‐Sep‐16
125 Wonderflex No. 270, 4th Phase, Peenya Industrial Area, Bangalore ‐ 560 058
20‐Jun‐2012 30‐Sep‐16
126 GE India Pvt LtdDivision: Wind Energy No. 601, 6th Floor Tower B,RMZ Infinity, Benniganahalli, Old Madras Road, Bangalore ‐ 560 016
15‐Jun‐2012 31‐Dec‐16
127 Biocon Research LtdPlot No. 2 of Bommasandra Link Road, Anekal Taluk, Bangalore Urban Dist.
22‐May‐2012 30‐Jun‐16
128 Mani Precision Products Pvt LtdB‐163, 3rd Cross, Peenya Industrial Estate, 1st Stage, Bangalore ‐ 560 058
23‐May‐2012 31‐Dec‐16
129 Wadhavan Holding Pvt LtdPlot No. 345‐A, Hebbal Industrial Area, Mysore ‐ 570 016
18‐Jun‐2012 30‐Sep‐12
130 Motherson Automotive Technologies & EngineeringPlot No. 11, 2nd Phase, Sector I, Bidadi Industrial Area, Ramanagara Taluk & Dist ‐ 562 109
2‐Sep‐2011 30‐Sep‐16
131 United Breweries LtdThandya Industrial Area, Toremavu & Immavu Village, Nanjangagud Taluk, Mysore District
21‐Jul‐2012 30‐Jun‐17
132 Kushal PolycoatsNo. 177, Bilekahalli Village, Bannerghatta Road, Bangalore ‐ 76
1‐Jul‐2012 30‐Jun‐17
133 Kaleesuwari Refinery Pvt LtdPlot No. 2, Antharasanahalli Industrial Area, Tumkur 572 106
12‐Jul‐2012 30‐Jun‐17
134 Island Star Mall Developers Pvt LtdNo. 106/107, Opposite to Mahadevapura BBMP, 1st
5‐Jul‐2012 30‐Jun‐17
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 13 of 23
Floor, White field Road, Bangalore ‐ 560 048 135 Mahanth Motors
No. 432, Opp GMIT College, Harihar Road, Davangere ‐ 577 006
19‐Jun‐2012 30‐Sep‐16
136 Aditya Auto Products & Engg (I) Pvt Ltd23/24, Peenya II Phase, Peenya Industrial Area, Bangalore ‐ 560 058
1‐Jul‐2012 30‐Jun‐17
137 Whitford India Pvt LtdPlot No. 86 (M&N), 1st Phase, KIADB Industrial Area, Jigani, Bangalore ‐ 560 105
17‐Feb‐2012 30‐Jun‐16
138 Mandhana Industries LtdNo. 26/A, II Phase, Peenya Industrial Area, Bangalore ‐ 560 058
14‐May‐2012 31‐Dec‐16
139 Microlite Industries Plot No. 93‐A, Jigani Industrial Area, II Phase, Jigani Hobli, Anekal Taluk, Bangalore
22‐Aug‐2012 30‐Jun‐17
140 M/s. College of Dental Science, Davangere. 01/07/2012 to 30‐06‐2017
141 M/s. Bapuji Dental College &Hospital, M.C.C.’B’ Block, Davangere
10/08/2012 to 30‐06‐2017
142 M/s. Metal Impact Pvt.Ltd.,Unit VI, No.109, II Phase,Bommasandra Industrial Area, Bangalore-560099.
10/07/2012 to 30‐06‐2017
143 M/s. Yagachi Vidyunmaam Pvt. Ltd., Plot. No.3,4 & 5,Thimmanahalli industrial Area, Kandali Post, Hassan-573217
04/08/2012 to
31‐12‐2016
144 M/s. Armstrong Acmite India manufacturing Pvt.Ltd., Plot No. 41-B, 2nd Phase, Peenya Indl Area, Bangalore-560058
01/10/2012 to
30‐09‐2017
145 M/s.Dakshin Foundry Private Limited, Unit-1,Plot No 28-B to H,KIADB Industrial Area, Hosakote, Bangalore 562114.
28/06/2012 to 31‐12‐2016
146 M/s. Mind Tree Limited, plot 150, EPIP , 2nd Phase, Hoody Village, Whitefield , KR Puram, Bangalore 560066.
20/05/2011 to 30‐06‐2015
147 M/s. Linen Park Fabric SPS Pvt. Ltd.,Plot No.38-A, 2nd Phase,2nd Sector, Bidadi Industrial Area, Ramanagara Taluk & District .
28/08/2012 to 30‐09‐2016
148 M/s.KDDL Limited , Unit- KHAN –II and Unit- EigenNo.408, 4th Main, 1st cross, 4th Phase, Peenya Indul Area,Bangalore-58
12/07/2012 to 30‐06‐2017
149 M/s. Unique Punch System Pvt.Ltd, Unit-11, 485/7, 14thcross,IV Phase, Peenya Industrial Area, Bangalore-58
12/07/2012 to
31‐12‐2016
150 M/s. Vinayaka Cars Pvt. Ltd., No.35, Kranti Kavi Sarvagna Road, Srirampura, Bangalore.
03/12/2011 to 30‐09‐2016
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 14 of 23
151 M/s.TVS Automobiles Solutions Limited, No.7D, Viswesharaya Industrial Area, White Field Road, Bangalore- 560048.
01/10/2012 to 30‐09‐2017
152 M/s. Metal Impact Pvt. Ltd., Unit-III, #109, 2nd Phase, Bommasandra Industrial Area, Bangalore -560099
07/08/2012 to
30‐06‐2017
153 M/s.Chuan Shun Electric Company India Pvt. Ltd., No. 139/2 (New No. 5265/601) Jigani, Bangalore Main Road, Anekal Taluk, Bangalore‐560105.
25/07/2012 to 31‐12‐2017
154 M/s. KEMS Forgings Limited, Unit 1, 35/B, KIADB Industrial Area, Hosakote, Bangalore Rural-562114
23/08/2012 to 30‐06‐2017
155 M/s.Khivraj Motors, No.174/1C, & Khatha No.431, Hoodi Village, Mahadevpura ,Bangalore.
25/07/2012 to 30‐09‐2016
156 M/s.MindTree Ltd., Plot No.150, EPIP 2nd Phase, Hoody village, Bangalore-560066.
01/07/2012 to 30‐06‐2017
157 M/s.Innmar Tourism & Hotel Pvt.Ltd., No.134-136, Road No.1,EPIP Area, Whitefield, Bangalore-560066.
22/05/2012 to 30‐09‐2016
158 M/s.Shree Mahalaxmi Motors,Sy. 296, 8 CP2, CP3, CP4, CP5, CP6 of koteshwara Village.,Kundapur Taluk, Udupi.
06/07/2012 to 30‐09‐2016
159 M/s. Supreme Auto Dealers Private Limited, Sy No.88, Madapatna , Kushalnagar, Somwarpete Taluk, Coorg District.
1‐Oct‐2012 30‐09‐2017
160 M/s. Dickinson Fowler Pvt. Ltd., Plot No. 109A, 2nd stage, Bommasandra Industrial Area, Hebbagodi, Bangalore -560099.
21-08-2012 to 30/09/2016
161 M/s. Sudhir Intra Vidyut Ltd.No.31, Bommasandra Industrial Area ,Bangalore -560099.
23/05/2012 to 30‐09‐2016
162 M/s.HCL Technologies Ltd., No.47/8, Doddathogur Village, Begur Hobli, I Phse, Electronic City, Bangalore -100.
16/08/2012 to 31‐12‐2016
163 M/s.Micro Labs Limited, Plot No.7B, Veerasandra Industrial Area, Veerasandra , Anekal Taluk,Bangalore -560100.
01/08/2012 to 30‐09‐2016
164 M/s.Nash Industries (I) Pvt. Ltd(E.O.U), Shed No.235,8th main, 3rd cross, III Phase, Peenya Industrial Area, Bangalore- 560058.
04/09/2012 to 30‐06‐2017
165 M/s.Oracle Financial Services Software Ltd., GlopalEnterprises India Pvt. Ltd.,Global Axis(SEZ), 152, EPIP Zone, Whitefield, Bangalore-66.
01/07/2012 to 30‐06‐2017
166 M/s.Gopalan Enterprises ,”Celesstial Green /Signature Towers”, No. 6, C.V. Raman Nagar,Benniganahali, Old Madras Road, Bangalore.
01/07/2012 to 30‐06‐2017
167 M/s.Gopalan Global Axix, Phase-I, by M/s.Gopalan Enterprises (India) Pvt. Ltd., Plot No. 152, Sy No 147, 157, & 158, Hoody Village, K.R. Puram Hobli , Bangalore East.
21/08/2012 to 30‐06‐2017
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 15 of 23
168 M/s. Mandovi Motors Private Limited, Sy No.88, Madapatna, Kushalnagar, Somwarpet taluk , Coorg District.
01/10/2012 to 30‐09‐2017
169 M/s. Ecof Industries Private Limited, No.42(B-1 and B-2), KIADB Industrial Area, Hosakote Taluk, Bangalore Rural District-562114.
05/10/2011 to 30‐06‐2016
170 M/s. KPR Sugar Mills Limited, Almel Village, Sindagi Taluk, District.
05/09/2012 to 30‐06‐2017
171 M/s. Best sellers Apparels Pvt.Ltd., No-16/334, Bajal street, Manipal-576104.
18/08/2012 to 30‐09‐2016
172 M/s. Kirloskar Electric Company Ltd., (UNIT-V), Transformer Division, Belvadi Indl. Area, Mysore-18
01/10/2012 to 30‐09‐2017
173 M/s. Banashankari Industries Pvt. Ltd., Plot No. 197, KIADB Inustrial Area, 3rd Phase, Malur, Malur taluk, Kolar District.
18/07/2012 to 30‐06‐2017
174 M/s.Bhagyalakshmi Powder Coatings, No.3 & 4, 17th cross, Doddanna Industrial Estate, Peenya 2nd stage ,Bangalore-58.
01/07/2012 to 30‐06‐2017
175 M/s.Ajax fiori Engineering Pvt.Ltd.,Plot No. 16 & 17, Indl Area, Doddaballapura-Tq, Bangalore Rural district.
30/08/2012 to
30‐06‐2017
176 M/s.Lakshmi Components Pvt.Ltd., No42 D PillagumpaIndl Area, Hosakote, Bangalore
11/09/2012 to 30/06/2017.
177 M/s.Reliance Industry Limited , No.62/2, Richmond road, Bangalore-560025
13/02/2012 to 31‐12‐2016
178 M/s. TVS Automobiles Solutions Ltd., No.26/2 & 27/2, Kenchanahalli Village, Kengeri Hobli, Bangalore South, Bangalore.
01/10/2012 to 30‐09‐2017
179 M/s.Suraj INN Pvt.Ltd., Sy.No. 46/2, 47/2, 48/2, 48/1, Wing F-Service Apartment, Mantri Flora, Ambalipura Village, Sarjapura Road,BangaloreEast Taluk, Bangalore.
05/10/2012 to 30‐06‐2017
180 M/s. Restolex Coir Products Pvt.Ltd., Plot No.24A,Tamaka Industrial Area,Kolar Taluk &District
12/10/2012 to 30‐06‐2017
181 M/s. KSRTC , Divisional workshop, Bangalore Central Division Shanthinagar, Bangalore-27.
01/10/2012 to 30‐09‐2017
182 M/s. M.K. Fasteners, Plot No.221, 3rd Phase, Bommasandra Industrial Area,Hosur Road, Bangalore.
18/09/2012 to 31‐12‐2016
183 M/s.Indo Schottle Auto Parts, Unit 2, Plot No.7 & 8, QUEST Special Economic Zone, 437/A, Hattargi Village, Yamkanmardi Hobli, Belgaum District-591243.
9‐Oct‐2012 31‐12‐2017
184 M/s. Sasank Biotech Limited, Plot No. 120,121, 122,123,124,KIADB Industrial Area, Raichur Growth center, Raichur.
30/07/2012 to 30‐06‐2017
185 M/s.Venkat Switchgears, #150, 10th Main Road, 3rd Phase, PIA Bangalore -560058.
10/10/2012 to 30‐06‐2017
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 16 of 23
186 M/s. Vicat Sagar Cement Ltd., Chatrasala Village, Chincholi (Tq), Gulbarga District.
31/10/2012 to 30‐06‐2017
187 M/s. Vibrant Parachem Pvt.Ltd., Plot No.57,58,69 & 70, KIADB Industrial Area, Raichur Growth center, Raichur.
11/10/2012 to 30‐06‐2017
188 M/s. Orange County Resorts & Hotels Ltd., Chikkanahalli Village, Ammathi Hobli, Siddapura, Virajpet Taluk, Coorg District-571253.
01/10/2012 to 30‐09‐2017
189 M/s. Vivek TextileProcessing,No.324/1, Hosur Road, Madiwala, Bangalore-560068.
26/10/2012 to 30‐06‐2017
190 M/s. Unitex Apparells Ltd., unit III (Formerly known as Snow- White Hi-Tech Launderette) No.252,11th Main, III Phase, Peenya Industrial Area, Bangalore-560058.
22/10/2012 to 30‐09‐2017
191 M/s. Yahoo Software Development India Pvt.Ltd.,Sun River Building EGLBP, Sr.No.10/2A &10/2B of Chalaghatta Village, Off Indiranagar- Koramangala Intermediate Ring road, Bangalore-560071.
01/08/2012 to 31‐12‐2016
192 M/s. Texport Industries (P) Ltd. Unit-16 Sy.No. 110/2, Mylanahalli Village, Kasaba Hobli,Nelamangala Tq, Bangalore Rural District.
04/09/2012 to 30‐09‐2017
193 M/s. Elastrex Polymers Pvt Ltd., No.70/4, Budhihal Village, Bangalore.
06/09/2012 to 31‐12‐2016
194 M/s. Wilworth Earthmovers Pvt.Ltd., No.43, Sy.No. 5, Bhemenahalli, MK Post, BidadiHobli, Ramanagara Taluk & District.
15/11/2012 to 30‐09‐2017
195 M/s. STI Sanoh India Ltd., # 471/D1,13th cross,3rd main,4th phase, Peenya Indl Area, Bangalore-560058.
03/10/2012 to
31‐12‐2016
196 Mahindra Reva Electric Vehicles Pvt Ltd., Anekal, Bangalore
26‐05‐2012 31‐12‐2016
197 Primacy Industries Ltd., MAnaglore 22‐10‐2012 30‐09‐2016 198 M/s. Ashirwad pipes (P) Ltd., Plot No.27(P), 28(P), 29
&30, Bommasandra Jigani Link Road, Anekal Tq, Bangalore Urban District‐560105.
26/10/2012 to 31‐12‐2016
199 M/s.Paloma Turning Company Pvt.Ltd., No.173/2, Bandapura Village Road, Anekal Taluk, Bangalore-562106.
24/08/2012 to 31‐12‐2016
200 M/s. VRL Media Ltd.,Plot No.193-A, CMC Katha No.257 Peenya III Phase, Industrial Area, Laggere Village, Yeshwanthpura Hobli, Bangalore.
27/09/2012 to 31/12/2016.
201 M/s. Shiny Industries, Plot no.8C-2 KIADB Industrial Area, Hoskote Taluk, Bangalore District-562114.
4‐Dec‐2012 30‐06‐2017
202 M/s.Apotex reaserch Pvt.Ltd., Plot No.2, Sy.No.347 &348, 4th Phase,Bommasandra Indl Area, Jigani link road,Bangalore-560099
14/06/2012 to 30‐06‐2017
203 M/s. Life Line Feeds(India) Pvt. Ltd.,-Poultry Fed Unit, Sy.No. 113/1A3, 114/2, Hale Lakya Village, Lakya Hobli, Chikamagalur Taluk and District.
15/09/2012 to 31/12/2016.
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 17 of 23
204 M/s.Tech Mahindra Limited, 9/7, Hosur Road, Bangalore-560029.
16/08/2012 to 30‐06‐2017
205 M/s.Sireesh Auto Pvt.Ltd., #108/2, 1st cross opp Multiplex Theater,Behind Bhagini Palace Restaurant, Marathalli, Bangalore-01
01/10/2012 to 30‐09‐2017
206 M/s. Bearys Global Reaserch Triangle, Sy.No.63/3B, 146 (Old No.99), 145,146, 63/3A & 63/2, Goravigere, Kajisunnenahalli Village, Bidarahalli Hobli,Bangalore-25
11/12/2012 to 30‐06‐2017
207 M/s.Promac Engineering Industries Ltd., 306,307,308,309-Part,311-Part of Harohalli 2nd Phase Industrial Area, Ramanagar District.
24/08/2012 to 30‐06‐2017
208 M/s. Brigade Metropolis,-Commercial Sy.No.73/1,73/2, 74(Part), 75(Part),76/(1) (Part), 76/2(Part),77/1, 78,79,80/1,81/1,81/2, Mahadevpura Village, K.R. Puram Hobli,Bangalore.
12/09/2012 to 30‐06‐2017
209 M/s. Chrome Motors, #320/4, Mysore Road, Opposite to BHEL factory,Bangalore-560026.
08/08/2012 to 30‐09‐2016
210 M/s.Shiraguppi Sugar Works Limited, Kagwad Village, Athani Taluk, Belgaum District-590015.
15/11/2012 to 30‐06‐2017
211 M/s.Chuckmatic Pvt.Ltd., Sy.No.87, Dharwad By pass (Next to Air-tech),NH-4, Narendra Village Dharwad -7
30/11/2012 to 30‐06‐2017
212 M/s.Bhandari Precision Forgings Pvt.Ltd., A-271, 2nd Stage, Peenya Industrial Estate, Bangalore-560058.
03/12/2012 to 30‐06‐2017
213 M/s.Yuken India Limited, B-80, 2nd Cross, 1st Stage, Peenya Industrial Area,Bnaglore-560058.
10/12/2010 to 30‐09‐2017
214 M/s.Richa Global Exports Pvt.Ltd., KIADB ,Plot No.308 to 317P, Jigani Bommasandra link Road, Jigani, Anekal (Tq),Bnaglore-562106.
09/10/2012 to 30‐06‐2017
215 M/s.Ramya Reprographic Pvt.Ltd., Katha No.16/2-B, Sy.No.16/2, Singasandra Village, Begur Hobli, Bangalore-560058.
27/09/2012 to 31‐12‐2016
216 M/s.Zimoto Autocare, #21, 2nd Gate, Gokul Industrial Area, Hubli.
06/10/2012 to 30‐09‐2017
217 M/s.Aarsha Chemicals Pvt.Ltd.,Plot No.115/A, KIADB Industrial Area, Honga, Belgaum District.
19/11/2012 to 30‐06‐2017
218 M/s.Om Sai Gastech, No.20, Near Hindustan Granite, Subramanyapura Main Road, Uttarahalli, Bangalore-560061.
05/11/2012 to 30‐06‐2017
219 M/s. Maxwatt Turbines Pvt.Ltd., Plot No. 113, Jigani Link Road, KIADB Industrial Area, Anekal Taluk, Bangalore-560105.
24/09/2012 to 30‐06‐2017
220 M/s.KHT Motors, No.134/1, S.N.B Compound, Kundalahalli Post, Kundalahalli, Bnaglore-560037.
11‐Feb‐2010 30‐09‐2014
221 M/s. Sterling’s Mac Hotels Pvt.Ltd., No.319, Farah Centre, CMH Road, Indira Nagar ,Bangalore-560038.
06/11/2012 to 30‐06‐2017
222 M/s.VPL Chemicals Pvt.Ltd., Plot No.64,Sompura Industrial Area,Dobaspet, Nelamangala Taluk, Bangalore
02/07/2012 to 30‐06‐2017
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 18 of 23
Rural District.
223 M/s. IDEB Buildcon P.Ltd., Sigma Soft Tech Park, No. 748, White field main road, Opp.to Varthur Kodi, Bangalore-560066.
20/11/2012 to 31‐12‐2016
224 M/s. Bhoruka Power Corporation Limited 2x5 MW Manjanadka Mini Hydel Station, Karike Village, Bhagamandala Hobli, Madikeri Taluk, Kodagu District.
20/11/2012 to 31‐12‐2016
225 M/s. Gland Chemicals Pvt.Ltd., Plot No.30A &B,II Phase, KIADB Industrial Area, Malur -563130
06/12/2012 to 30‐06‐2017
226 M/s.TV Sundaram Iyengar and Sons Ltd., Survey No.2, Laksmi Sagar Manchanayakanahalli P.O,Bidadi Ramanagara Taluk, Bangalore-562109
03/01/2013 to 30‐09‐2017
227 M/s.Pathi Prints, Plot No.285, Sub Layout, Bommasandra 1st Phase Industrial Area, Kachanayakanahalli, Jigani Hobli, Anekal Taluk,Bangalore District.
29/11/2012 to
30‐06‐2017
228 M/s.Suveswaru Enterprises Pvt.Ltd., Plot No.7, 2nd cross, 4th phase,Industrial Area, Bommasandra , B.J.L road, Bangalore-560099.
19/10/2012 to 31‐12‐2016
229 M/s.Solidus Hi Tech Products Pvt.Ltd., No.120A, 2nd Phase, Jigini Industrial Area, Bangalore-562106.
25/10/2012 to 31‐12‐2016
230 M/s.Dolan Techno Crafts Pvt., Ltd., Plot No.3A, 1st Main road, KIADB Industrial Area, Hoskote, Bangalore-562114
20/11/2012 to 30‐06‐2017
231 M/s.VRL Media Limited., R.S. No.351/1, NH 4-Bnaglore Road, chebbi village,Varur Hubli-581207, Dharwad District.
19/10/2012 to 31‐12‐2016
232 M/s.Kalyani Motors Pvt.Ltd., No.K,1319/2034C, BM Road, Opp.Rotary Hospital, Ramanagara-571511.
12/12/2012 to 30‐09‐2017
233 M/s. Arihant Metals & Extended Pvt.Ltd., Plot NO.9-L, Yarandahalli,Bommasandra Industrial Area, 1st Phase, Anekal Taluk, Bangalore-99
23/11/2012 to 30‐06‐2017
234 M/s.Motherson Sumi Systems Limited, Plot No.11, 2nd Phase, Bidadi Industrial Area, Ramanagara Taluk and District.
09/10/2012 to 31‐12‐2016
235 M/s.Solidus Hi Tech Products Pvt.Ltd., No.9A, 1st Phase, Jigani Industrial Area, Anekal Taluk, Bangalore
25/10/2012 to 31‐12‐2016
236 M/s.SLK Software Services Pvt.Ltd., 'V&A Grande', No.40/A, KHB Industrial Area, Yelahanka New Town, Bangalore-560064.
21/11/2012 to 31‐12‐2016
237 M/s.Sireesh Auto Pvt.Ltd., B.B.M. Khatha No.360/321,10/2B,Byatarayana pura, Yalahanka Hobli, Bangalore North taluk.
04/09/2012 to 30‐09‐2017
238 M/s.Bill Forge Pvt.Ltd., Plant-VI, Plot No.86(M& N)/4, KIADB Industrial Area, 1st Phase, Jigani Village, Anekal Taluk, Bangalore-560105.
10/09/2012 to 30‐06‐2017
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 19 of 23
239 M/s.JMT Auto Limited, Plot No.224-A, KIADB Industrial Area, Belur-Dharwad-580011.
11‐Dec‐2012 30‐06‐2017
240 M/s.SKF Technologies (India) Pvt.Ltd., Plot No.36(Part), 37,38&39,Kadakola Industrial Area, Phase-2, Kadakola , Mysore-571311
0301/2013 to 30‐06‐2017
241 M/s.Honnassiri Motors India Pvt.Ltd., No.193/5, Hunsur Main Road, Hinkal,Mysore-570017.
03/01/2013 to 30‐09‐2017
242 M/s.Indo Schottle Auto Parts Pvt.Ltd., 84/C, Honaga Industrial Area, KIADB, Balgaum-591156.
22/11/2012 to 30/06/2017.
243 M/s.Manipal County ,365 off Hosur Road, Singasandara, Bangalore- 560068
01/01/2013 to
31‐12‐2017
244 M/s.Trelleborg Industrial Products India Pvt.Ltd., 19/1, Kalena Agrahara,Bannerghatta main road, Bangalore-560076.
9/7/2012 to 30‐09‐2017
245 M/s.J.B.C.Garments Pvt Ltd.,, 100% Subsdiaryof Texport Industries Pvt.Ltd., No.219,11th main, 2nd cross, 3dr Phase, Peenya, Bangalore-560058.
05/12/2012 to 31‐12‐2016
246 M/s. PSK Pharma Private Limited, 121/22 Mahajenahalli, Shimoga Road, Harihar-577601.
27/11/2012 to 30‐09‐2017
247 M/s RS Surfacoats (Unit-II), Plot No.227, Hebbal Industrial Area, MysoreTaluk& district-570016.
10/01/2013 to 30‐06‐2017
248 M/s.Faurecia Emissions Control Technologies India Pvt.Ltd., Plot No.1,Sector-1, Bidadi Industrial Area, 2nd Phase, Shanamangala village, Bidadi Hobli, Ramanagaram-562109.
03/01/2013 to 31‐12‐2017
249 M/s.Nitesh Residency Hotel Ptv.Ltd.,(Ritz arlton) No.99, residency road, Bangalore-25.
22/01/2013 to 30‐06‐2017
250 M/s.Galvano castins pvt.ltd., No.134, 3rd Phase, Peenya Industrial Area, Bangalore-560058.
03/01/2013 to 30‐06‐2017
251 M/s.Himanshu Pharmaceuticals Pvt.Ltd., #113-C-1, Bommasandra Industrial Area, KIADB Phase-1, Anekal Taluk, Bangalore-99.
02/01/2013 to 30‐09‐2017
252 M/s.Shailendra Techno Park Pvt. Ltd., Plot No.116, EPIP 1st phase, White field, Bangalore.
02/01/2013 to 31‐12‐2017
253 M/s. Jamakhandi Sugar Limited,(Unit-II), Post NAD K D-586209, Indi Taluk, Bijapur District.
01/02/2013 to 30‐06‐2017
254 M/s.Arjun Motors, No.937/4, New Kantharaj Urs Road, Mysore.
01/02/2013 to 30‐09‐2017
255 M/s. Elite Vehicles Pvt.Ltd., Plot No.2, Dyavasandra Industrial Area, II Phase, K.R.Puram Hobli, Bangalore
12/06/2012 to 30‐09‐2016
256 M/s. Neo Surface Technology (India) Pvt.Ltd., Plot No.151 & 152, KIADB Indl Area, Mundargi III Stage, Bellary District.
11/02/2013 to 30‐06‐2017
257 M/s.Texport Industries Pvt Ltd., Unit 7, Survey No.48/1, Karihobanahalli,Peenya 2nd Stage, Bangalore-560058.
05/12/2012 to 31‐12‐2016
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 20 of 23
258 M/s.NEO Industries Metal Process Pvt.Ltd., No.1262, Kurekuppa, Basapura Road, Kurekuppa Village, Sandur Taluk, Bellary District.
11/02/2013 to 30‐06‐2017
259 M/s.Kaynes Technology India Pvt.Ltd., No.23-25, Belagola Food Industrial Area, Metagalli Post, Mysore-570016.
23/01/2013 to 31‐12‐2017
260 M/s.BMM Ispat Ltd., Stage II, Unit-II, #114, Danapur Village, Hoskote Talulk, Bellary District, Karnataka.
24/11/2012 to 30‐06‐2017
261 M/s.BMM Ispat Ltd.,Stage I, Unit-I #114, Danapur Village, Hoskote Talulk, Bellary District, Karnataka.
24/11/2012 to 30‐06‐2017
262 M/s. AXA Business Service Pvt.Ltd., No.01 SJR Plaza , 29th Main Road, BTM Layout 1st Stage, Bangalore‐560068
06/11/2012 to
31‐12‐2016
263 M/s. Honeywell Technology Solutions Lab Pvt.Ltd., 152/9 & 152/10, Galaxy building, Bilekahalli Village, Begur Hobli, Bangalore.
21/01/2013 to 31‐12‐2017
264 M/s.Gomthi Life Science India Pvt.Ltd., Plot No.17F, Bidadi Idustrial Area,2nd Phase, Sector -1, Bidadi Hobli, Ramanagara District-562109.
12/02/2013 to 30‐06‐2017
265 M/s. Ecof Industries Pvt.Ltd., Plot No.61 & 62, KIADB Industrial Area, Malur,Kolar District-563130
18/01/2013 to 30‐06‐2017
266 M/s.Charishma Hotel Pvt.Ltd., Sy.No. 90/4, Munnekolalu Village,Marathahalli Outrt Ring Road, Bangalore-560037
15/01/2013 to 30‐09‐2017
267 M/s.R.V.Bajaj, Khata No.20/21, 17th Cross, Behind Maruthi Mandir,Vijaya Nagar, Bangalore-560040
08/02/2013 to 30‐09‐2017
268 M/s.Stovekraft Pvt.Ltd., No.81/1, 81/2, 89/2B Medamaranahalli,Harohalli Industrial Area, Kanakapura Taluk, Ramanagar District-562112.
12/2/2013 to 30‐06‐2017
269 M/s.Bhushan Power & Steel Ltd., No.55, KIADB Industrial Area, Hoskote Taluk, Bangalore
04/02/2013 to 31‐12‐2017
270 M/s.Bimal Auto Agency India (P) Ltd., No.A-37438, II main road,II stage PIE Bangalore-58.
12/2/2013 to 30‐06‐2017
271 M/s.3D Concept Tooling Private Limited, #C-338, 1st Stage, Peenya Industrial Estate, Bangalore-560058.
15/02/2013 to 30‐09‐2017
272 M/s.Southfield Points Limited, Plot No.102-B, 103,104,105 and 106,3rd Phase, KIADB Industrila Area, Malur, Kolar District.
31/01/2013 to
30‐06‐2017
273 M/s. Siemens technology and Services Pvt Ltd., No.105, Prestige Alecto- Phase-1, Electronic City, Hosur Road, Bangalore-100.
30/01/2013 to 30‐06‐2017
274 M/s.Kalyani Motors Pvt.Ltd.,No.129/4, Kalyani Platina Tech Park(Opp.Brookfields Hospital) Kundalahalli Village Road, Bangalore-560066.
01-01-2013 30‐09‐2017
275 M/s. Honeywell Technology Solutions Lab Pvt.Ltd.,151/1, Mother Earth, Jupiter and Venus Building, Bilekahalli Village, Begur Hobli, Bangalore-560076.
21/01/2013 to 30‐06‐2017
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 21 of 23
276 M/s.Aravinda Mills Ltd., # 63/9 Dodda Thogur Village, Electronic city Bangalore-561229, Karanataka
09/01/2013 to 31‐12‐2017
277 M/s.Adarsh Tech Park-1, Sy.No.19/1, 19/2,19/3, 19/4, 20/1P,20/2P,20/3P,21,2(P),25,39,41/3A2,42/3B2,41/4 & 56 of Devarabeesanahalli Village, Varthur Hobli, BangaloreEast Taluk.
02/02/2013 to 30‐06‐2017
278 M/s.Prestige Garden Constructions Pvt.Ltd., Forum Value Mall, No.62,Whitefield Main Road, Whitefield, Bangalore-560066.
01/02/2013 to 30‐06‐2017
279 M/s. Kalyani Motors Pvt Ltd., Sy No. 58/1A & 61/22, Avalahalli, old Madras Road,Virgonagar Post, Bangalore-560049.
19/01/2013 to 30‐09‐2017
280 M/s. X-changing technology Services (I) Pvt., Ltd., KEONICS- IT/SEZ area, Sy.No.135,136 & 156, Nadige Industrial Area, Machenahalli,Shimoga-577221
30/01/2013 to 31‐12‐2017
281 M/s.SMR Automotive system India Limited., Survey No.96/3-P, 96/4-P&96/7-P, Kumbalgodu Industrial Area, II Phase, Big Banyan Tree Road, Geerupalya Village, Bangalore- Mysore Road Cross.Bangalore-74
02/02/2013 to 31‐12‐2017
282 M/s.I.H.Castings, Survey No.336/2/2,Besides M/s.Patson Structural India Private Limited, KSSIDC Udyambag Industrial Area, Belagavi-590008.
28/01/2013 to 30‐06‐2017
283 M/s. Sundaram Auto Components Ltd., Plsatic Division, TVS motorcompany ancillary units, Byathalli Village, Kadakola post, Mysore-571311.
07/01/2013 to 31‐12‐2017
284 LeeBoy India Consturction Equpiment Pvt Ltd., Plot No. 289, 290,291 & 292, Bommasandra-Jigani link, KIADB Bommasandra 4th Phase Indul Area, Jigani Hobli, Anekal Tq, B’lore urban District.
23/01/2013 to 30‐09‐2017
285 M/s.MSR Hotel (Bangalore) Pvt.Ltd., 3115, M.S. Ramaiah Road Gokula, Bangalore-560054.
07/02/2013 to 30‐06‐2017
286 M/s. Adept Polymers Pvt.Ltd., B-121, 3rd Main, 2nd stage, Peenya Indl Estate, Bangalore-58
18/08/2012 to 31‐12‐2016
287 M/s. Garden City Fashion Pvt.Ltd., No.B-175, 4th main, 2nd stage, Peenya Indl Estate, Bangalore-58
01/10/2012 to 30‐09‐2017
288 M/s. Metal Arts, No.344, 9th cross, Peenya Indl Estate, Bangalore-58
17/08/2012 to 30‐06‐2017
289 M/s. Hewlette Packard India Sales pvt.Ltd., No.66/2, Ward No. 83, 7th Floor, Wing A & B, BagmaneTech Park, Embassy Prime, C.V. Raman Nagara, Bangalore-34
23/07/2012 to 31‐12‐2016
290 M/s. Shree Karan Metal Technologies , No.40/2, J.C. Indl Area, Yellachenahalli, Kanakapura Rd, Bangalore-62
04/09/2012 to 30‐06‐2017
291 M/s. Texport Industries Pvt.Ltd., No.459, IV Phase, Peenya Indl Estate, Bangalore-58
29/08/2012 to 31‐12‐2016
292 M/s.TVS Automobile Solutions Limited , No.1945 & 1945 A, P.B.Road, Davangere-577005
01/10/2012 to 30‐09‐2017
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 22 of 23
293 M/s. General Motors Technical Center India Pvt.Ltd., Plot No.5-B, Kadugodi Indl Area, Biderahally Hobli, Bnagalore.
10/07/2012 to 30‐09‐2016
294 M/s. Alufit (India) Pvt.Ltd., No.17/A, Phase-II, Peenya Indl Estate, Bangalore-58
21/08/2012 to 30‐06‐2017
295 M/s. Agilent Technologies India Pvt.Ltd., C/o DHL Lemuir Logistics Pvt.Ltd., No.55/10, Haralakunte Village, Sectors-2, HSR Lay out Near KEB Power Station , Bangalore-34
01/07/2012 to 30‐06‐2017
296 M/s. Press Comp International, No.A, 106, II Stage , PIE , Bnagalore-58
15/09/2012 to 31‐12‐2016
297 M/s. Siri Technologies Pvt.Ltd., Plot No. 92/A & 92/B, Keonics Electronics City , 1st phase, Bnagalore-100
15/09/2012 to 31‐12‐2016
298 M/s. Nash Industries , Plot No.8, 4th Phase, Bommasandra Industrial area, anekal Taluk , Bnagalore-99
07/08/2012 to 30‐06‐2017
299 M/s. Deutsch IndiaPower ConnectorPvt. Limited, Plotno.104, “Prestige Omega”, EPIPZone, 1st Phase, White field, Bnagalore-66
01/08/2012 to 30‐06‐2017
300 M/s. Sathya Fuel Chemtech, Plot No.60,184, Bandenallasandra Village, Bommasandra , Jigani Link Road, Bangalore-560105,
27/12/2012 to 30‐06‐2017
301 M/s. New Sagar Industry, plot No. 88, KIADB, Kelegote Industrial area, NH-4, Bangalore Road, Chithradurga.
21/07/2012 to 30‐06‐2017
302 M/s.Buddhaa Chemicals, Plot No.52, 15th Cross, Doddanna Industrial Area, Near Peenya 2nd Stage, Bangalore-560091
22.03.2013 to 30.06.2017
303 M/s. Shree Nandi Chemicals, Plot No. 28, AIE, 2nd Stage, Tumkur Dist
11/01/2013 to 30‐06‐2015
304 M/s. Banashankari Industries Private Limited,Plot No.197, KIADB Industrial Area,3rd Phase, Malur,Kolar District.
18/07/2012 to
30‐06‐2017
305 M/s. Jonas petro products Pvt. Ltd.Plot No. 277, Baikampady Industrial area, Mangalore-575011
01/11/2012 to 30‐06‐2017
306 M/s.Shiva Enterprises, Plot No.311-A, 2nd Phase, KIADB Industrial Area, Harohalli, Kanakapura Taluk, Ramanagara district, Ramanagara
25/08/2012 to 30‐06‐2017
307 M/s.Sagar Refineries, Plot No.5/A, KIADB Industrial Area, Tamaka, Kolar Taluk& District, Kolar
16/08/2012 to 30‐06‐2017
308 M/s. BSK Pure Chem, Plot No. 127/A, KIADB Industrial Area Bommasandra, Bangalore-560099
28/12/2012 to 30‐06‐2017
309 M/s. Eswari Metal Industries (Unit-I), Plot No. 101A, Baikampady Industrial Area, Mangalore – 575 011
23/05/2012 to 30‐06‐2015
310 M/s.Aegan Batteries Ltd. Sy. No. 26/1, 27/3, Choodagondanahalli village, Lakkur Hobli, Malur Tq., Kolar Dist
09/07/2012 to 30‐06‐2016
Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 23 of 23
311 M/s. Durga Metal Industries, Plot No. 325Q1, II Phase, KIADB Industrial Area, Harohalli, Kanakapura Taluk, Ramanagar District
06/03/2013 to 30‐06‐2017
312 M/s. Enviro Green Alloys Inc. Plot No.32, Industrial Area, 1st Phase, Malur Taluk, Kolar district-563130
27/12/2012 to 30‐06‐2017
313 M/s. Microlite Industries, Plot No. 93-A4, Jigani Industrial Area, II Phase, Jigani Hobli, Anekal Taluk, Bangalore
04/09/2012 to 30‐06‐2017
314 M/s. Anitha Industries, Special Plot No.3 Industrial Estate, Antharasanahalli 2nd Stage, Tumkur.
01/07/2010 to 30‐06‐2015
315 M/s. Lube Tech Petro Chemicals.,No. C-76 KSSIDC Veersandra Industrial Estate, Hosur Road, Bangalore-560100
22/08/2012 to 30‐06‐2017
316 M/s. E Nano Incintech, Plot No. 342-B, 212, Harohalli Industrial area, Kanakpura Tq. Ramnagara Dist.
18/06/2012 to 30‐06‐2016
317 M/s. Shree Raju Enterprises , Plot No. 24F1, KIADB Indl Area, 1st Phase, Kumbalgodu, Kengeri, Bnagalore-47.
05/04/2012 to 30‐06‐2016