PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO
MYRTLE BEACH ELEMENTARY SCHOOL
PMHPIKE McFARLAND HALL
ASSOCIATES, INC.ARCHITECTS & PLANNERS
October 9, 2017
PMHPROPOSED CONVERSION OF
MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL
EXISTING BUS ROUTE
BUS ROUTE EXTENSION
ELEMENTARY SCHOOL
DOUG SHAW MEMORIAL STADIUM
PEPPER GEDDINGSRECREATION CENTER
MIDDLE SCHOOL
PRIMARY SCHOOL
NEW SIDEWALK TO PEPPER GEDDINGSRECREATION CENTER
NEW SIDEWALKTO JOIN EXISTING CITY SIDEWALK
BUS ROUTE EXTENSION
EXISTING INTERMEDIATE
SCHOOL
HIGH SCHOOL
PMHPROPOSED CONVERSION OF
MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL
SITE PLAN
EXISTINGBUS LOOP
NEW FIRE LANE
NEW FIRE LANE
NEW FIRE LANE
PLAYGROUND28,520 SF
MYRTLE BEACH ELEMENTARY SCHOOL
NEW SIDE WALK
ENERGYPLANT
PMHPROPOSED CONVERSION OF
MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL
PROPOSED RENOVATION FLOOR PLAN
EXISTING AREA
RENOVATION AREAS
NEW HVAC SYSTEM
NEW FINISHES
NEW CEILINGS
NEW LIGHTS
100% NEW FIRE SPRINKLER
100% NEW FIRE ALARM
PMHPROPOSED CONVERSION OF
MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL
MEDIA CENTER
SUPPORT SPACES
ENCLOSED SQ. FT. 134,520
3rd = 18 x 21.5 = 3874th = 17 x 24.5 = 4165th = 17 x 24.5 = 416
1,219 Students
RES = 6 (+2 POSS)INTERV = 2ISS = 1AP = 2SELF CONT. = 4GUIDANCE = 2 + CONFSPEECH = 1ART = 1MUSIC = 1P.E. = 1COMPUTER LAB = 1
CIRCULATION & TOILETS
CLASSROOMS
EXPLORATORY PROGRAMS
FOOD SERVICE
ADMINISTRATION
COMPOSITE FLOOR PLAN
4th - 4
4th - 3
4th - 2
4th - 1
3rd -18
RES
RES RES
RES
4th -5
4th - 6
4th - 7
3rd -17
3rd -16
3rd -15
3rd -14
3rd -13
3rd -12
3rd -11
3rd -10
RE
S
3rd -9
3rd -8
AP
AP
3rd -7
3rd -6
3rd -5
3rd -4
3rd -3
3rd -2
3rd -1
SELF CONT
SELF CONT
SELF CONT
SELF CONT
4th - 8
4th - 9
4th - 10 4th - 11
INTER
COMPLAB INTER
MEDIA CENTER
5th - 3
5th - 2
5th - 1
4th - 17
4th - 16
4th - 15
4th - 14
4th - 13
4th - 12
5th - 4
5th - 5
5th - 6
5th - 7
SP ED
5th - 9
5th - 10 ART
ADMINISTRATION
5th - 8
5th - 11
5th - 12
5th - 13
5th -17
5th -16
5th -15
5th -14
RES
MUSIC
MUSICRES
CAFETERIA
KIT
GYM
PMHPROPOSED CONVERSION OF
MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL
ESTIMATE
Opinion of Probable Costsbased on discussions with Horry County Schools’ staff and evaluation of the existing Myrtle Beach Middle School to convert to new Myrtle Beach Elementary School (grades 3, 4 and 5):
BASIC BUILDING RENOVATION SCOPE
SITE WORK $ 1,156,859Bus Loop Extension , Fire Lane Extension, Sidewalks, Site Utilities(Fire Line, Backflow Preventer, Heater, Power, FDC Connection,6” Tap, Generator), Playground, Rough Grading, Signage,Contractors Overhead and Profit, Contingency (10%)
BUILDING CONVERSIONS $ 6,361,164Renovate Approximately 21,170 SF, New Millwork (52 Classrooms),Add Windows (8 Classrooms), Remove and replace existing Ceilingsand Grid (22,871 SF), Electrical for Smartboards (14 Classrooms)HVAC (14 Classrooms), New Sinks (20 Classrooms), Paint (21,170 SF)Flooring (no wax in Corridors), Carpet / Base (52 Classrooms), Locker RemovalFire Sprinkler System (133,701 SF), Convert Auditorium (into 2 Classrooms and2 Intervention Rooms), New Gang Toilets, Water Source Heat Pump HVAC (Gym and2 Classroom Wings), Energy Plant BuildingContractor’s Overhead and Profit, Contingency (10%)
PMHPROPOSED CONVERSION OF
MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL
ESTIMATE
OTHER FACILITY-WIDE RENOVATIONS $ 2,116,203Corridor Flooring, Gym Curtain Divider, Stage Curtains, Fire Alarm SystemReplace SCW doors in gang toilets with solid phenolic partitions, Add drinking fountains, Furniture Moving Allowance, Technology, Security /Surveillance / Access Control, HVAC Controls, Signage, Contractor’s Overhead and ProfitContingency (10%)
SOFT COSTS $ 2,995,820Fixtures, Furnishings and Equipment (FFE), (new student desks and chairs)
HCS Contingency (10%),A/E Fees, Surveying, Geotechnical Exploration, Special Inspections, Testing, etc. (15%)
TOTAL $ 12,630,046
PMHPROPOSED CONVERSION OF
MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL
LONG RANG NEEDSAdditional needs identified to be addressed in the near future - based on the Long Range Facilities Study.
CONSTRUCTION $ 7,879,117Replace Gym Floor, Paint Remainder of BuildingNew Carpet (Administration), Replace Plumbing FixturesReplace HVAC with Water Source Heat Pump (Remainder of Building),Replace Remainder of Ceilings and Grid, Replace Lights with LEDContingency (10%)
SOFT COSTS $ 1,969,780HCS Contingency (10%), A/E Fees, I.T., Special Inspections, Testing, etc.
TOTAL $ 9,848,897
SUMMARYBasic Building Renovation Scope $ 12,630,046Additional Needs $ 9,878,891
GRAND TOTAL $ 22,478,943
ESTIMATE
PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO
MYRTLE BEACH ELEMENTARY SCHOOL
PMHPIKE McFARLAND HALL
ASSOCIATES, INC.ARCHITECTS & PLANNERS
October 9, 2017
PMHPROPOSED CONVERSION OF
MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL
PROPOSED RENOVATION FLOOR PLAN
ENCLOSED SQ. FT. 134,520
EXISTING AREA
RENOVATION AREAS
Square Footage Per Area:
A = 19,323 S.F.B = 18,111 S.F.C = 12,623 S.F.D = 3,724 S.F.E = 20,389 S.F.F = 14,486 S.F. G= 12,256 S.F.H = 15,068 S.F.J = 11,500 S.F.K = 5,700 S.F.
3rd = 18 x 21.5 = 3874th = 17 x 24.5 = 4165th = 17 x 24.5 = 416
1,219 Students
RES = 6 (+2 POSS)INTERV = 2ISS = 1AP = 2SELF CONT. = 4GUIDANCE = 2 + CONFSPEECH = 1ART = 1MUSIC = 1P.E. = 1COMPUTER LAB = 1
A
B
C
D
E
F
G JK
H