Falls Lake Clean Water Requirement
EPA requirements for the Falls Lake Watershed:20% reduction in total
nitrogen by 2016
If the lake quality fails to improve by 2016, a $115 million upgrade of Raleigh’s E.M. Johnson Treatment Plant will be needed .
Other improvements may cost an additional $200 million.
Significance of our site: Royall Parking Lot
Process
Measurements and assessments
Proposal to NCSSM School Administration and Plant Facilities
Rain Garden Design Contest
Excavation
Planting
Our impact Pollution reduction:
- ~0.1 lb phosphorous/yr
- ~1 lb nitrogen/yr
- ~ 60 lb suspended solid/yr
Engage and instruct local community to construct backyard and neighborhood rain gardens
- held rain garden workshop as part of NC Science Festival
Future Works
Adjust rain garden to maximize runoff capture
Assist local homeowners with rain garden construction to expand the impact of the best management practice.
Engage local elementary school students in sustainability through partnership with NCSSM ScienceDays club