NATIONAL CLEANER PRODUCTION CENTRESOUTH AFRICA

@NCPC_SA

www.ncpc.co.za

RECP Student Internship – Class of 2016

www.ncpc.co.za

• KZN§ ABI § King Shaka

International Airport§ Fishwicks

• CPT§ BBI Solutions§ Rhodes Food Group§ GlaxoSmithKline§ PG Glass

• JHB§ Directech§ Dutton Plastics§ Rhodes Food Group(2

sites)§ Natures Garden§ Willards§ Tigerbrands§ Zinchem§ Zimalco§ Afrox (2 sites)

Thanks to the host companies

www.ncpc.co.za

RECP Project Life Cycle

www.ncpc.co.za

Savings Overview

NATIONAL CLEANER PRODUCTION CENTRESOUTH AFRICA

Common Recommendations

www.iee-sa.co.za 6

Radiation Loss + Redundant Piping

~R600k/annum– 1yr payback

www.iee-sa.co.za 7

Condensate return

~R35k/annum– 1yr payback

• b

www.iee-sa.co.za 8

Steam Leaks

~R120k/annum– 1yr payback

www.iee-sa.co.za 9

Common Compressor Recommendations

4. Recover Waste Heat

2. Use Outside Air for Compressor Intakes

3. Reduce Pressure

1. Air Leaks

www.iee-sa.co.za 10

Alternative Heating Systems

~R1.1Mil/annum– 1-3yr payback

Assume300kWavailableforheatrecovery~450kg/hrsteam

www.iee-sa.co.za

• Reduce Peak Demand – 250kVA drop = R400k/annum

Peak demand / load shift / Power factor

30Nov2016

www.ncpc.co.za

• BBI power factor§ R160k

• Natures Garden Blanch Water Project§ R660k in water§ R240k in kWh

• RFG Krugersdorp water leak repair§ R500k / annum

• Zinchem – Boiler and Waste Management§ Boiler Scheduling ~ R120k / annum§ Solid waste management ~ R50k§ Water leak repair ~ R100k

Highlighted Interventions

www.ncpc.co.za

• To be valued one must add value• Great need to address countries skill shortage

“Success is to be measured not so much by the position that one has reached in life as by the obstacles which he

has overcome.” Booker T Washington

Motivational Thoughts

www.ncpc.co.za

THANK YOU