REVISED PERT-CPM DIAGRAM

BAR CHART

S-CURVE

1

1

N

LFES

L E G E N D:

CRITICAL PATH

ACTIVITY

DUMMY

EVENT NO. - N

EARLY START - ES

LATE FINISH - LF

REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM

REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY, MARIKINA CITY

(DUE TO VARIATION ORDER NO. 2)

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

2ND STREET, PORT AREA MANILA

CONSTRUCTION DIVISION

PROJECT AND LOCATION:

REHABILITATION/MAJOR REPAIR OF PERMANENT

BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG

MARCOS HIGHWAY, MARIKINA CITY

SHEET CONTENTS:PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED:

SHEET No.:

CEFERINO A. LONDINA

AUTHORIZED MANAGING OFFICER

EDGARDO S. RAMOS

ENGINEER III

PROJECT ENGINEER III

EDWIN M. LUZON

CHIEF, CONSTRUCTION DIVISION

ADOR G. CANLAS, CESO IV

REGIONAL DIRECTOR

SUBMITTED BY:

JUBY B. CORDON

ASSISTANT REGIONAL DIRECTOR

1

1 1

S

0 0

2

33 33

1

1 1

3

48 48

5

94 94

4

64 94

6

199199

7

215215

8

230230

9

245245

10

276276

13

337337

11

306337

12

306337

14

368368

15

390390