L/O/G/O

High-­‐Tech  Cluster  Zelenograd:  Structure  

Lease term unlimited

Lease term 3 years

Lot area– 60 ha Floor area – 60,700 sq.ft

1st stage (250,100 sq.ft)

3rd & 4th stage Lot area– 5.5 ha

2nd stage (290,000 sq.ft)

Lease term unlimited

Lease term unlimited

System  Pass-­‐Through  Supports  Innovation  in  Business  

Lot area- 146.5 ha

The  main  purpose  of  Technopolis  «Zelenograd»  is  to  create  proper  environment  for  the  development  of    innovative  entrepreneurship  

       

4

Electronics,  energy  saving  equipment  

Navigation,  aerospace  technology  

Automation  and  control  systems  

Electronic  components  and  equipment  

Medical  equipment  

IT,  telecommunications  

Total  lot  area:    12  ha  

Total floor area: 1,1

mln. sq. ft.  

Total investment up to  $200  

mln  

1.  Technopolis  «Zelenograd»  

 Construction  

stages  

Stage  1   Stage  2  

Stage  3   Stage  4  

1st  stage  Period  –  2006-­‐2009  

   2nd  stage  

Period  –  2013-­‐2015    

 3rd  stage  Period  —  2014-­‐2016  

 4th  stage  

Period  —  2015-­‐2017  

Five-­‐storey  ofJice  building  to  accommodate:  

     -­‐  Managing  Company's  staff  and  engineering  functions.          -­‐  Public  premises.          -­‐  Residents’  ofJices.  

Floor  area  250,100  sq.ft  

R&D  facilities  –  15%  Industrial  facilities  –  70%  OfJices  and  parking  –  15%  

 Cap.  investments  –  €74  million  

Floor  area  –  410,200  sq.ft  

Community  Center  –  25%  Industrial  facilities  –  35%  Storage  facilities  –  40%  

 Cap.  investments  –  €34.1  million  

Area  –  150,400  sq.ft  

Industrial  facilities  –  60%  R&D  facilities  –  20%    

OfJices  and  parking  –  20%    

Cap.  investments  –  €36.1  million  Floor  area  –  290,400  sq.ft  

State  funding  

State  funding,  loans,  investors  

Technopolis  Construction  Plan  

Loans,  investors  

2.  Industrial  Park  

The goal: To create up-to-date production zone for IT & electronics

To create 20 thousand new high-tech jobs and attract front-edge companies from abroad.

Industrial  Park  Construction  Plan  

3rd  Stage  12.4  ha  

2nd  Stage  13.7  ha  

1st  Stage  15.5  ha  

4th  Stage  5.6  ha  

5th  Stage  5.9  ha  

 Construction  

stages  

Stage1   Stage  2  

Stage  3   Stages  4  &  5  

1st  Stage  Period  –  2014-­‐2018  

   2nd  Stage  

Period  –  2016-­‐2020    

 3rd  Stage  Period  —  2017-­‐2021  

 4th  &  5th  Stages  Period  —  2018-­‐2022  

 -­‐  Research  and  production,  ofJices;  

-­‐  Storage  facilities;  -­‐  Technological  infrastructure,  public  

utilities;  -­‐ Customs  terminal  

Construction  area  –  1  300  000  sq.ft  Cap.  investments  –  €163.6  million  

-­‐  Research  and  production,  ofJices;  -­‐  Educational  center;  

-­‐   Exhibition  center,  conference  room  Construction  area–  1  100  000  sq.ft  Cap.  Investments  –  €150  million.  

-­‐  Research  and  production,  ofJices;  -­‐  Residential  buildings;  

-­‐   Hotel,  Jitness  center  and    shopping  center  

Construction  area–  1  100  000  sq.ft  Cap.  Investments  –  €136.36  million.  

-­‐  R&D,  ofJices;  -­‐  Warehouses;  

 Construction  area  –  1  180  000  sq.ft  Cap.  Investments  –  €160.9  million  

State  funding,  investors  

Investors  

Industrial  Park  Construction  Plan    

Investors  

Investors  

Support  for  residents  

5%   government   procurement   quota   for  innovative  products    Tax  reduction:  Income  tax  -­‐  13.5%  (instead  of  20%)  Property  tax  -­‐  0%    Partial   coverage   of   interest   rates   for  innovative  projects