High-‐Tech Cluster Zelenograd: Structure
Lease term unlimited
Lease term 3 years
Lot area– 60 ha Floor area – 60,700 sq.ft
1st stage (250,100 sq.ft)
3rd & 4th stage Lot area– 5.5 ha
2nd stage (290,000 sq.ft)
Lease term unlimited
Lease term unlimited
System Pass-‐Through Supports Innovation in Business
Lot area- 146.5 ha
The main purpose of Technopolis «Zelenograd» is to create proper environment for the development of innovative entrepreneurship
4
Electronics, energy saving equipment
Navigation, aerospace technology
Automation and control systems
Electronic components and equipment
Medical equipment
IT, telecommunications
Total lot area: 12 ha
Total floor area: 1,1
mln. sq. ft.
Total investment up to $200
mln
1. Technopolis «Zelenograd»
Construction
stages
Stage 1 Stage 2
Stage 3 Stage 4
1st stage Period – 2006-‐2009
2nd stage
Period – 2013-‐2015
3rd stage Period — 2014-‐2016
4th stage
Period — 2015-‐2017
Five-‐storey ofJice building to accommodate:
-‐ Managing Company's staff and engineering functions. -‐ Public premises. -‐ Residents’ ofJices.
Floor area 250,100 sq.ft
R&D facilities – 15% Industrial facilities – 70% OfJices and parking – 15%
Cap. investments – €74 million
Floor area – 410,200 sq.ft
Community Center – 25% Industrial facilities – 35% Storage facilities – 40%
Cap. investments – €34.1 million
Area – 150,400 sq.ft
Industrial facilities – 60% R&D facilities – 20%
OfJices and parking – 20%
Cap. investments – €36.1 million Floor area – 290,400 sq.ft
State funding
State funding, loans, investors
Technopolis Construction Plan
Loans, investors
2. Industrial Park
The goal: To create up-to-date production zone for IT & electronics
To create 20 thousand new high-tech jobs and attract front-edge companies from abroad.
Industrial Park Construction Plan
3rd Stage 12.4 ha
2nd Stage 13.7 ha
1st Stage 15.5 ha
4th Stage 5.6 ha
5th Stage 5.9 ha
Construction
stages
Stage1 Stage 2
Stage 3 Stages 4 & 5
1st Stage Period – 2014-‐2018
2nd Stage
Period – 2016-‐2020
3rd Stage Period — 2017-‐2021
4th & 5th Stages Period — 2018-‐2022
-‐ Research and production, ofJices;
-‐ Storage facilities; -‐ Technological infrastructure, public
utilities; -‐ Customs terminal
Construction area – 1 300 000 sq.ft Cap. investments – €163.6 million
-‐ Research and production, ofJices; -‐ Educational center;
-‐ Exhibition center, conference room Construction area– 1 100 000 sq.ft Cap. Investments – €150 million.
-‐ Research and production, ofJices; -‐ Residential buildings;
-‐ Hotel, Jitness center and shopping center
Construction area– 1 100 000 sq.ft Cap. Investments – €136.36 million.
-‐ R&D, ofJices; -‐ Warehouses;
Construction area – 1 180 000 sq.ft Cap. Investments – €160.9 million
State funding, investors
Investors
Industrial Park Construction Plan
Investors
Investors
Support for residents
5% government procurement quota for innovative products Tax reduction: Income tax -‐ 13.5% (instead of 20%) Property tax -‐ 0% Partial coverage of interest rates for innovative projects