SCADA PPT-21.08.2016 (Revised)

Post on 13-Apr-2017

71 views 3 download

transcript

1

TRANSMISSION SCADA SYSTEM

An initiative to improve Operational Efficiency

2

Turn key Contract awarded on M/s Dongfang Electronics Company Ltd., China in Sept’2013.

The Scope of contract covers following:

• Establishment of 3 Control Centers at Jabalpur, Bhopal & Indore.

• No. of EHV S/s to be integrated – 330 (existing & up coming ).

• Over all Project Management on Turnkey basis.

• Implementing and maintaining the system during performance

guarantee period of two years.

• AMC for Five years post performance guarantee period.

• Training to MPPTCL personnel.

3

Control Center

No of S/S No. of Remote Viewer

Number of LDMS

Under designing

S/SJabalpur 95 4 95 -Bhopal 97 2 97 -Indore 116 1 116 -TOTAL 308 7 308 22

4

State-of-Art Supervisory Control & Data Acquisition for Sub-station equipment via Human-Machine Interfaces.

Modular & Distributed Design.

Open Architecture Concept.

SCADA System Control Center-

Standard CC Hardware Standard SCADA Software Functions Communication:

i. RTU to Control Centers-GPRSii.Between Control Centers- Fiber Optic (OPGW)

SALIENT FEATURES OF TRANSMISSION SCADA

5

SCADA work Workstation ×4

Database server ×2

SCADA server ×2

FEP server×2

GPS

ICCP server ×2

Fi reWal l

Color Printer ×2

Remote

Workstation

Jabalpur _ 4 Sets

Engineering WorkstationReport server

Router

GPRS/OPGW network

Router

Substation-01 Substation-330… … …

GPRS

A3 B/W Laser Printer

LDMS

RTU

GPRS

LDMS

RTU

A3 B/W Laser Printer

Router

Fi reWal l

Router

SCADA work Workstation ×4

Database server ×2

GPS

ICCP server ×2

Fi reWal l

Color Printer ×2

Virtual Engineering Workstation

Report server

Router Router

Fi reWal l

SCADA work Workstation ×4

Database server ×2

SCADA/FEP server×2

ICCP server ×2

Fi reWal l

Color Printer ×2

Virtual Engineering Workstation

Report server

Router

Router

Fi reWal lRouter

Remote

Workstation

Bhopal_ 2 Sets

Remote

Workstation

Indore_ 1 Sets

Bhopal Control Centre

Indore Control Centre

Jabalpur Control Centre

SCADA/FEP server×2

GPS PLCC PLCC

6

Inter Control Center Communication Link Through PGCIL/MPPTCL OPGW Network

Inter Connection Between Jabalpur, Bhopal & Indore CC

SCADA SYSTEM –BENEFITS DERIVEDAutomatic data logging and generation of reports.Effective Control & Operation of all EHV substations

through real time information.Close supervision of functioning of Out Sourced

Agencies employed for sub-station operations.Event sequence recording at EHV substations.Quality Monitoring of Power Transformers, CT, PT,

Circuit Breakers, Multi Function Meters and Protection & Communication Battery Charger/ Battery sets etc.

Operation Interface for Automatic Demand Management System Scheme (ADMS) of Discoms.

Reduction of Transmission losses by control of voltages & circulating MVAR through the centralized information.

7

SCADA SYSTEM –BENEFITS DERIVED (Contd.)Accurate reports for future planning of State Transmission

System.Saving in running cost by optimizing operation &

maintenance cost & reducing risk of failure of sub-station equipments.

Identifying potential risks to take preventive action in advance.

Accurate centralized information help in quality monitoring of power supply. Improved services to customer.

Longevity of equipment’s life by real time monitoring.Overcoming shortage of man power by automatic data

logging and generation of all system reports.Preparation of precise MIS & Performance Standards of

Transmission System for State Regulatory Commission. 8

ACHEIVEMENTS OF SCADA PROJECT Establishment of SCADA Control Centers at

Jabalpur, Bhopal & Indore with integration of Remote Telemetry Units (RTUs) at 313 Nos. EHV Sub-stations

Successful testing of RTUs delivered under the project for simultaneous reporting to three Master Control Centers through combination of Wide-Band OPGW-PLCC Channels and GPRS link using separate logical data bases in addition to reporting to Local Data Monitoring System (LDMS).

Implementation of SMS information system for Tripping of EHV Lines and Transformers.

9

WAY FORWARD

Interface to Intelligent Electronic Devices (IED’s).

Automation of EHV substations.

Integration with load shedding schemes like Automatic Under frequency & rate of change of frequency (df/dt).

Condition Monitoring of Sub-station equipments.Integration with the surveillance system of

substations.

10

Jabalpur Control Center- Building

11

Jabalpur Control Center- Control Room

12

Jabalpur Control Center- Control Room

13

Jabalpur Control Center- Control Room

14

Jabalpur Control Center- Battery Room

15

Bhopal Control Center – Control Room

Bhopal Control Center – Server Room

Bhopal Control Center – Battery Room

Indore Control Center

19

Indore Control Center – Control Room

20

Indore Control Center –Corridor

21

LDMS at EHV S/S Control Room

18 Substations

work completed (15.01.2015)

23

33 33

12

23

33 33

12

0

5

10

15

20

25

30

35

SE 400 Bhopal SE T&C Bhopal SE T&C Gwalior SE 400 Bina

CIRCLE WISE SUBSTATIONS SCADA COMMISSIONED IN

BHOPAL CONTROL CENTRE

No. of Sub Stations SCADA Commissioned

3

22

76

3

22

76

0 10 20 30 40 50 60 70 80

400 kVSUBSTATIONS

220kVSUBSTATIONS

132 kVSUBSTATIONS

SCADA Commissioned No. Of Substations

VOLTAGE WISE SUBSTATIONS SCADA COMMISSIONED IN BHOPAL CONTROL CENTRE