Shaftesbury High School ARISS Telebridge Station VE4ISS

Post on 14-Feb-2016

99 views 0 download

Tags:

description

Shaftesbury High School ARISS Telebridge Station VE4ISS. Robert Striemer , VE4SHSStefan Wagener, VE4NSA. Introduction Presentation on ARISS and SHS Telebridge Project, Timeline and Requirements Q & A Next Steps. Agenda. - PowerPoint PPT Presentation

transcript

* Shaftesbury High School ARISS Telebridge Station

VE4ISS

Robert Striemer, VE4SHS Stefan Wagener, VE4NSA

*Agenda

*Introduction*Presentation on ARISS and SHS Telebridge

Project, Timeline and Requirements*Q & A*Next Steps

*What is ARISS

*ARISS is an international program linking schools and communities to the International Space Station (ISS) using amateur radio*Sponsored by NASA, ESA, CSA, JAXA and

RKA with the help of AMSAT, ARRL, RAC and a host of volunteers*Over 800 live school contacts since 2003

with three contacts in Winnipeg

*How does it work?

*ISS Orbit

51.6°orbital

inclination

Amateur Radio Satellite Station

*School Contacts with the ISS

*2 Options for school contacts

*Direct contact*School provides radio, antennas and operators*One contact only

*Telebridge Station*School connects to an amateur radio station

somewhere else (fixed location)*Service provider for other schools (repeated

contacts)

*Why Telebridge?

*Telebridge Requirements

*Primary satellite ground station*Secondary (backup) station*24/7 operational readiness (upon

notification)*Phone connection*Operated (supervised) by licensed ham

radio operator*Estimated cost of station upgrade at

SHS is ~$15K

*Station Equipment

*Radio(s)*Antenna(s)*Rotor(s)*Cables*PCs*Procedures*Motivated people

*Station Equipment

Voice Contact (only)

*HamTV is coming!

Video link from the European Columbus Module- Operational 2013/2014

*Proposal

*Establishing a permanent ARISS Telebridge Amateur Radio Station at SHS*Support by ARISS, RAC, AMSAT, PTSD and

SHS*Voice and video contact*1st telebridge station in Canada*Operational by the end of 2013*Callsign: VE4ISS

*2013 Timeline?

*July-August: Fundraising*September-October: Set-up of Station*October-November: Extensive Testing*November: ARISS Approval*December: Operational

*VE4ISS

Website:www.ve4iss.ca

Fundraising:Community, Parents, RAC

IT:High Speed

InternetPhone,

Audio/Video

Accounting:Donations,

Procurement, Tax Receipts

Ground Station:Radio, Antennas, Cables, Protocols

Public Relations:Press,

Announcements, Flyers

Project Management:Steering Group

Student Integration:Curriculum,

Classroom, Projects

SHS ARISS

VE4ISS

*Tasks

*Q & A

*Next Steps?