MRac Solar Carport System
Installation Guide
Content 1 Product Introduction ------------------------------------------P2
2 Installation Tool & Components-------------------------------P3
3 Installation Procedure -----------------------------------------P4
4 Warranty--------------------------------------------------------P8
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
2
1. Product Introduction
MRac Carport System is uniquely designed applying to large scale
commercial and utility system, offering shades to your cars while much
environment-friendly.
Please read this Installation Guide thoroughly before installing the MRac
Carport system. This Guide offers the planning and installation
instruction for MRac Carport.
MRac Carport products, when installed in accordance with this guide,
will be structurally adequate and will meet the local standards. During
installation, especially when working on the roof, be sure to observe the
appropriate safety regulations and please pay attention to the relevant
regulations of your local region. Please check that you are using the
current version of the installation manual by contact Mibet Energy by
mail on sales@mbt-energy.com, or your local representative.
The installer is solely responsible for:
Complying with all applicable local or national building codes,
including any that may supersede this manual;
Ensuring that MRac and other products are appropriate for the
particular installation and the installation environment;
Using only MRac parts and installers-supplied parted as specified by
MRac (Substitution of parts may void the warranty and invalidate the
letter of certification on page 2);
How to recycle: according to the local relative statute;
How to disassemble: countermove with installation;
Ensure that there are no less than two professional workers in panel
installation;
Ensure the installation of relative electrical equipment is
performance by professional electrician.
Ensure safe installation of all electrical aspects of the PV array.
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
3
2. Installation Tool & Components
2.1 Installation Tool
L-Inner Hexagon
Spanner
Monkey Spanner Socket Wrench Electric Tool
Nylon Wire Tape Square Marker
2.2 Components List
Components List
Full-edge End Clamp Kit
U27 Inter Clamp Kit Rail 115 Rail 115 Connector
Beam 100 Beam 100 Connector C Clamp Kit Carport T-shape Jointer Kit
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
4
Carport Basement 80*80 Square Tube
2.3 Carport System Overview
(1)Full-edge End Clamp Kit (2)U27 Inter Clamp Kit
(3)Rail 115 (4)C Clamp Kit (5)Beam 100
(6) Carport T-shape Jointer Kit
(7)Carport Basement (8)80*40 Square Tube
②
①
③
④
⑤
⑥
⑦
⑧
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
5
3. Installation Guide
3.1 Install Each Unit
3.1.1
Fix the Carport
Basements onto the
pre-made concrete
bases according to the
technical drawing
provided, place the
nuts without fastened;
make sure all the
Carport Basements are
in a line both vertical
and landscape by a
Nylon Wire.
Showed as Drawing 1,
2, 3, and 4.
Nylon Wire
All basements have to be in
a line vertically
Nylon Wire
All basements have to
be in a line landscape
Drawing 1 Drawing 2
Drawing 3
Drawing 4
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
6
3.1.2
(1). Pre-assemble the
C Clamp Kit 150 onto
the T-shape Carport
Jointer by M8*25
bolts, as Drawing 5.
(Don’t fasten the
bolts tightly for the
convenience of next
step)
(2). Slide the
pre-assembled
T-shape Carport
Jointer to the
planned position on
the Beam 100, then
fasten the bolts
tightly now. Showed
as Drawing 6&7.
(3). Assemble the 80
Square Tube onto
the T-shape Carport
Jointer by M20*130
bolts.
Showing as Drawing
8&9.
Drawing 5
Drawing 6
Drawing 7
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
7
(4). Connect the
pre-assembled
Beam 100 Support
with the Carport
Basements, which
have already been
installed onto the
concretes, by
M20*130. 3 to 4
experienced worker
need to cooperate
to finish this step as
Drawing 10&11
showed.
Note: Make sure all
the bolts in this
system are
assembled from the
same direction as
showing in Drawing
12.
Drawing 8
Drawing 9
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
8
Drawing 10
Drawing 11
Keep all the nut in the same
direction for the whole system
Drawing 12
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
9
(5). Repeat above step
as per the technical
drawing suggested till
the whole system
finished.
Note: Make sure all
the bolts should be
fastened tightly.
3.2 Install Rail
3.2.1
The drawings
shows how the
Cross Module
being installed,
which is the main
component in C
Clamp Kit, Inter
Clamp Kit and End
Clamp Kit.
3.2.2
Check the length
of Rail 115, using
the Rail 115
Connector to
extend it
according to the
technical drawing
before assembled
onto the Beam.
8pcs of bolts are
required for each
side, totally 16pcs
bolts for one Rail
115 Connector.
Note: Not
recommend
extending the Rail
Rail
115
Rail 115
Connector
Drawing 13
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
10
115 after
assemble the Rail
115 onto the
Beam.
3.2.3
Assemble Rail 115
onto the Beam
according to the
technical drawing,
a marker can be
used to mark the
right position, as
Drawing showed.
3.2.4
Assemble all the
Rail 115 as
planned.
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
11
3.2.5
Fix the Rail 115
onto the Beam by
C Clamp Kits,
fasten all M8
inner hexagon
bolts.
Note: 2 sets of C
Clamp Kits need
to be used in
each side as
showed.
3.2.6
Repeat above step
and get all Rail 115
assembled as
technical drawing
planned, make
sure the end of all
rails in a line.
Note: All bolts
have to be
fastened tightly.
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
12
3.3 Install Panels
3.3.1
a. Place the
panels according
to technical
drawing (Drawing
1: Section view),
fix the panel by
Full-edge End
Clamp Kit and
U27 Inter Clamp
Kit.
b. Repeat above
step, and make
sure all the
panels are being
installed
properly.
Drawing 1: Section view
Installation of End
Clamp Kit
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
13
3.3.2
Installation
completed, check
all the bolts have
been fastened.
Installation of Inter Clamp Kit
No slot should be
remained between two
rows
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
14
Warranty Declaration
Mibet (Xiamen) New Energy Co., Ltd. (hereinafter as “Mibet Energy”)
warrants to the original purchaser (“Purchaser”) of product(s) that it
manufactures (“Product”) at the original installation site that the
Product shall be free from defects in material and workmanship for a
period of ten (10) years, except for the anodized finish which shall be
free from visible peeling, or cracking or chalking under normal
atmospheric conditions.
Warranties and guarantees can only be claimed if the installation and
commissioning of the photovoltaic system was done by professional
personnel, as can be proved. We guarantee a 10 year warranty for the
durability of all our MRac PV mounting products that are correctly
mounted, installed and used as our Installation Guide says.
Mibet Energy shall not be liable for consequential, contingent or
incidental damages arising out of the use of the Product by Purchaser
under any circumstances. If within the specified Warranty periods the
Product shall be reasonably proven to be defective, then Mibet Energy
shall repair or replace the defective Product, or any part thereof, in
Mibet Energy’s sole discretion. Such repair or replacement shall
completely satisfy and discharge all of Mibet Energy’s liability with
respect to this Limited Warranty. Under no circumstances shall Mibet
Energy be liable for special, indirect or consequential damages arising
out of or related to use by Purchaser of the Product. Manufacturers of
related items, such as PV modules and flashings, may provide written
warranties of their own. Mibet Energy’s Limited Warranty covers only its
Product, and not any related items.
The warranty period begins from the delivery or pick up date from Mibet
Energy factory or warehouse. The replacement or repair of defective
components does not extend the warranty period.
Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District, Tel: +86592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: sales@mbt-energy.com
15