On arrival at the site, check and confirm the following

Scaffolding is in place and safe to use

Materials and equipment are on site

System design documents are available

Solar PV On-Site Guide

Familiarise yourself with the site and confirm the expected location of the panels and the electrical fittings

Solar PV On-Site Guide

Internal works

Fix the inverter securely into the selected position

Allow correct air spaces as per manufacturers instructions

Solar PV On-Site Guide

Internal works

Fix the DC isolator switch(es) into position

Solar PV On-Site Guide

Internal works

Fix the AC isolator switch in position

Solar PV On-Site Guide

Internal works

Attach the cabling between the inverter and the switches

Solar PV On-Site Guide

Internal works

Complete the installation of the DC switch(es) and label them

Solar PV On-Site Guide

Internal works

Position and install the generation meter and main AC isolator switch

Usually this is to be located adjacent to the distribution board

Solar PV On-Site Guide

External works

Use an experienced roofer to install a proprietary roof entry for the DC cables to pass through the roof

Solar PV On-Site Guide

External / Internal works

Feed the DC cables through the fitting and into the internal roof space.

Solar PV On-Site Guide

External works

Record the voltage (VOC) and current (ISC) values for each panel.

Solar PV On-Site Guide

External works

Use an experienced roofer to fit the brackets in place

Solar PV On-Site Guide

External works

Measure and square up the rails when fitting.

Solar PV On-Site Guide

External works

Position the required length of DC cable and secure with zip ties.

Solar PV On-Site Guide

External works

Bring the panels safely up to the installation level.

Take extra care if it is windy.

Solar PV On-Site Guide

External works

Align the first panel and fix in place.

Solar PV On-Site Guide

External works

Fix the panels in place ensuring they are straight and square. Pay special attention to positioning the first panel in a string.

Solar PV On-Site Guide

External works

Add further panels, keeping the alignment.

Connect the panel cables as each one is fixed in place.

Solar PV On-Site Guide

External works

Secure each panel in place.

Solar PV On-Site Guide

External works

With the panel array(s) in place and connected, return to the inverter for testing and commissioning.

Solar PV On-Site Guide

Internal works

Complete all AC tests in accordance with BS7671 Inspection & Test

Solar PV On-Site Guide

Internal works

Complete tests on DC circuitry including:IR testsVOC testsISC testsIrradiance level tests

Solar PV On-Site Guide

Internal works

Ensure all electrical components are fully labelled.

Solar PV On-Site Guide

Internal works

Place a system schematic at the inverter location, and at the main consumer unit for the property