Advanced Work Packaging & WorkFace Planning

Solutions for Project Delivery

Joe HobbsManager of Engineering - CoSyn Technology (WorleyParsons)

COAA - AWP Steering Committee memberCII - Research Team member

RT310 - Improving Engineering and Procurement Alignment and Coordination with Construction

RULES OF ENGAGEMENT?

HOW does WorleyParsonsapply Advanced Work Packaging (AWP) and 

WorkFace Planning (WFP)?

WHY ARE WE HERE?

WHAT?

WHY? HOW?

WHY ARE WE HERE?

“Safety outweighing every other consideration”

ONEWAY MOMENT

“The formal processes were too complicated”

ONEWAY MOMENT

“Uh‐oh!”

ONEWAY MOMENT

“It will never happen again”

ONEWAY MOMENT

WorkFace Planning (WFP)

WHAT IS WFP?

The detailed PLAN to ensure  you have the right:

PEOPLETOOLSPLACETIMESCOPE

WHAT IS WFP?

WHAT IS WFP?

Construction Work Package

WHAT IS WFP?

Engineering Work Package

WHAT IS WFP?

Installation Work Package

WHAT IS WFP?

Advanced WorkPackaging

(AWP)?

WHAT IS AWP?

THINKING WITH THE END IN MINDAT THE START

WHAT IS AWP?

Completions

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

DetailedEngineeringFEEDConceptual

Development Construct

WHAT IS AWP/WFP?

CII – IR 272, Advanced Work Packaging:Implementation Resource 272-2 version 3.0, Volume 2, Sect 1.1, Figure 1

AssetDefinition Operate Decommission

/mothball

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

WHAT IS AWP/WFP?MAINTENANCEOPERATIONS

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

ADVANCED WORKPACKAGING

WHAT IS AWP/WFP?

Early ALIGNMENT on the project of ENGINEERING, SUPPLY NETWORK and CONSTRUCTION to 

successfully implement the WorkFace Plan

WHAT IS AWP/WFP?

WHY WE DO IT?

WHY WE DO IT?

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

WHY WE DO IT?

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

WHY WE DO IT?

INFLUENCE CURVE

Project Cum

ulative

Opp

ortu

nitie

s fo

r Sav

ings

Max

Min

100%

Concept Completion0%

AssetDefinition Operate Decommission

/mothballCompletionsDetailedEngineeringFEEDConceptual

Development Construct

Ability to influence

Cost

I T

PRODUCTIVITY

EP R I C T A YLB I

QUA

ITY

C O S

S

HEDULE

EA FS Y

PRO

UCTIVI

Y

EP R I C T A YB I

QUA

ITY

C O S

S

HEDULE

EA FS Y

D

T

TI

T

C LLLC

BENEFITS

Tool Time33%

Wait / idle44%

Material Movement / Planning

23%

Current Practice

Tool Time33%

ImprovedTool Time 

11%

Wait / idle33%

Material Movement & Planning

23%

WFP Productivity Improvement

BENEFITS

CII – IR 272, Advanced Work Packaging:Implementation Resource 272-2 version 3.0, Volume 1, Sect 1.3.1

BENEFITS

25%INCREASE IN

LABOR PRODUCTIVITY

BENEFITS

10%PROJECT COST

SAVINGS

(WHAT HAS CHANGED?)

HOW?

PEOPLE

SYSTEMS, PROCESSES & TOOLS

PEOPLE

CUSTOMER FOCUS

CHALLENGES

HOW?

ADVANCED WORKPACKAGING

OWNER

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

MODEL MANAGERWhat’s Different

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

CONSTRUCTION ADVISORWhat’s Different

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

PROCUREMENT MANAGERWhat’s Different

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

ADVANCED WORKPACKAGING

PLANNERWhat’s New

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

ADVANCED WORKPACKAGING

CHAMPIONSWhat’s New

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

RIGHTPERSON

RIGHTROLE

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

ADVANCED WORKPACKAGING

CHALLENGES

CUSTOMER FOCUS

PEOPLE

SYSTEMS, PROCESSES & TOOLS

SYSTEMS,PROCESSES &TOOLS

THINKING WITH THE END IN MINDAT THE START

SYSTEMS,PROCESSES &TOOLS

Installation Work Package

SYSTEMS,PROCESSES &TOOLS

CWP IWP

Engineering Deliverable

1 EWP = 1 CWP (?)

Scope of Work

Drawings

Engineering specifications &

standards

Procurement information

Vendor documents

Quality requirements

Risks/Hazards

Construction Deliverable

Work Face Plan for ~ 500-1000 hours work (2 weeks)

ScopeDeliverableActivities

Resources:equipment, tools

materials, labour, workinstructions, safety

equipment, drawings,vendor data, …

Special ConditionsQuality Control

InterdependenciesRisk PlanningError Proofing

EWP

Engineering/Construction Deliverable

Area Scope ~ 40k – 200k hours

Construction Scope of WorkEngineering Information

Craft / ManpowerDirect Field Equip / Mat’l

SafetyQuality (QA / QC)

Special Permits / RegulatorySubcontractors

Vendor support dataRigging studies

ScaffoldSpecial equip / tools/ consum.

Waste managementRisk register

WFPProject Controls

Turn-over documentsContact List

ProcurementRequired on site dates

Long lead items

Transportation

Materials Management

SYSTEMS,PROCESSES &TOOLS

CWP IWP

Engineering Deliverable

1 EWP = 1 CWP (?)

Scope of Work

Drawings

Engineering specifications &

standards

Procurement information

Vendor documents

Quality requirements

Risks/Hazards

Construction Deliverable

Work Face Plan for ~ 500-1000 hours work (2 weeks)

ScopeDeliverableActivities

Resources:equipment, tools

materials, labour, workinstructions, safety

equipment, drawings,vendor data, …

Special ConditionsQuality Control

InterdependenciesRisk PlanningError Proofing

EWP

Engineering/Construction Deliverable

Area Scope ~ 40k – 200k hours

Construction Scope of WorkEngineering Information

Craft / ManpowerDirect Field Equip / Mat’l

SafetyQuality (QA / QC)

Special Permits / RegulatorySubcontractors

Vendor support dataRigging studies

ScaffoldSpecial equip / tools/ consum.

Waste managementRisk register

WFPProject Controls

Turn-over documentsContact List

ProcurementRequired on site dates

Long lead items

Transportation

Materials Management

SYSTEMS,PROCESSES &TOOLS

Decommission/mothball

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

EWP

WBS CWP

DistinctDefinableTangible

IWPArea or System

CWP EWP= EWPEWPEWPEWPEWPEWPIWP

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment

AssetDefinition FEED OperateConstruct CompletionsDetailed

Engineering

=Contractual

Pay item

CWP EWP= EWP OR EWPEWPEWPEWP

SYSTEMS,PROCESSES &TOOLS

NOT JUST THE WHAT BUT ALSO 

THE HOW

SYSTEMS,PROCESSES &TOOLS

KEY DOCUMENTS

SCHEDULESCOPE

SYSTEMS,PROCESSES &TOOLS

DistinctDefinableTangible

KEY DOCUMENTS

MODEL

SCHEDULE WBS

PEP

AWP Execution Path-of-ConstructionInterface Management Contract Strategy

Approvals WFP Execution

CWPEWPIWPCBS

3D (Space)4D (Time)5D (IMM)

6D (Ops/Mtce)SCOPE

SYSTEMS,PROCESSES &TOOLS

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

PATH-OF-CONSTRUCTION - EXAMPLE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

PROJECT EXECUTION METHODOLOGY

OPERATING AND MAINTENANCE PHILOSOPHY

OWNER

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

PATH-OF-CONSTRUCTION - EXAMPLE

OWNER

ENGINEERING CONSTRUCTION

WBS – DEFINED CWP/EWPSPATH-OF-CONSTRUCTION (OUTLINED)LONG LEAD ITEMS IDENTIFIEDCONTRACT STRATEGY

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

WBS – IDENTIFY IWPSPATH-OF-CONSTRUCTION (FINALIZED)INTEGRATED MATERIALS MANAGEMENT

PATH-OF-CONSTRUCTION - EXAMPLE

ENGINEERING CONSTRUCTION

SUPPLYCHAIN

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

ENGINEERING CONSTRUCTION

EWPS (COMPLETE)CWPS (SUBSTANTIALLY COMPLETE) / IWPS (INITIATED)FABRICATIONS/MATERIALS ON-SITE

PATH-OF-CONSTRUCTION - EXAMPLE

SUPPLYCHAIN

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

ENGINEERING CONSTRUCTION

PATH-OF-CONSTRUCTION EXECUTIONAREA IWPS (IMPLEMENTATION)FIELD ERECTION & ASSEMBLY

PATH-OF-CONSTRUCTION - EXAMPLE

SUPPLYCHAIN

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

ENGINEERING CONSTRUCTION

SYSTEM IWPS (IMPLEMENTATION) / COMMISSIONING

PATH-OF-CONSTRUCTION - EXAMPLE

OWNER

CHALLENGES

SYSTEMS, PROCESSES & TOOLS

CUSTOMER FOCUS

PEOPLE

CUSTOMER FOCUS

Scalable AGILE Adaptable

CHANGE

BUILDABILITYSAFE

ALIGNMENT

CUSTOMER FOCUS

CHALLENGES

SYSTEMS, PROCESSES & TOOLS

CUSTOMER FOCUS

PEOPLE

CHALLENGES

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

ADVANCED WORKPACKAGING

LACK OF BUY-INDO IT THIS WAY CONTRACTS

CHALLENGES

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

ADVANCED WORKPACKAGING

WFP

CHALLENGES

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

CHALLENGES

CHANGE

GLOBALIZATIONCULTURE

CONTRACTS

TECHNOLOGY

CHALLENGES

WORKFACE PLANNINGADVANCED WORK PACKAGING

RECAP

Completions

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

DetailedEngineeringFEEDConceptual

Development ConstructAssetDefinition Operate Decommission

/mothball

HOW does WorleyParsonsapply Advanced Work Packaging (AWP) and 

WorkFace Planning (WFP)?

WORKFACE PLANNINGADVANCED WORK PACKAGING

WHAT?

RECAP

Completions

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

DetailedEngineeringFEEDConceptual

Development ConstructAssetDefinition Operate Decommission

/mothball

WHAT?

WHY?

25% increased labor productivity

10% PROJECT COST SAVINGS

Improved SAFETYVALUEEfficiencyBeing LeadersBetter Capital EfficiencyGood Business

Tool Time33%

Gained 11%

Wait / idle33%

Mat’lMvmt & Planning23%

WFP Productivity Improvement

RECAP

WHAT?

WHY? HOW?

RECAP

CHALLENGES

CUSTOMER FOCUS

SYSTEMS,PROCESSES &TOOLS

SYSTEMS, PROCESSES & TOOLS

PEOPLE

RECAP

RIGHT PEOPLERIGHT ROLE

CHALLENGES

CUSTOMER FOCUS

PEOPLE

SYSTEMS, PROCESSES & TOOLS

SYSTEMS,PROCESSES &TOOLS

RECAP

THINKING WITH THE END IN MINDAT THE START

RECAP

NOT JUST THE WHAT BUT ALSO 

THE HOW

CHALLENGES

SYSTEMS, PROCESSES & TOOLS

CUSTOMER FOCUS

PEOPLE

CUSTOMER FOCUS

RECAP

THINK SAFETY ADAPTABILITY SCALABILITY

CHALLENGES

SYSTEMS, PROCESSES & TOOLS

CUSTOMER FOCUS

PEOPLE

CHALLENGES

RECAP

BUY‐INQUALIFIED PEOPLE

CULTURE

RECAP

Thank-you