Solar PV Systems I , Spring 2011

Final ProjectBob McGonigle

Grid Tied Solar PV System

• Limited amount of space• High efficiency panels• Inverter limited to min startup voltage

Annual Electricity Usage 11.6 kWh

0

200

400

600

800

1000

1200

1400

1600

kWh

Month/Year

kWh Used

Solar Pathfinder Results

Big Maple TreeBig problem !!!

Facing East

Facing West

PV Watts Analysis

Buy American (ARRA) Compliant Solar Panels

Zep System IIMounting System

Calculations

MODULE INFORMATION STCVOC = 36.90 VISC = 8.91 APtolerance = +5/-3%Max fuse rating = 15 APMAX = 245 WVPMAX = 29.8 VIPMAX = 8.23 AARRAY INFORMATIONNumber of modules in series = 5Total Watts = 1225 W

OPERATING VOLTAGEVPMAX = 29.8 VNumber of modules in series = 529.8 V VPMAX x 5 = 149 Volts

OPERATING CURRENTIPMAX = 8.23 AMAXIMUM SYSTEM VOLTAGEModule Voc = 36.9 VNumber of Modules in series = 5 Lowest temp. on record = -21.7°C

(Coefficient of 1.25 from NEC 690.7)Maximum System Voltage36.9 V x 5 x 1.25 = 230.63 Volts < 600 Volts

MAX PV SOURCE CIRCUIT CURRENTISC = 8.91 A8.91 A x 1.25 = 11.4 A8.91 A x 1.56 = 13.9 A

Calculations

WIRING OVERCURRENT PROTECTION

CONDUCTOR AMPACITYFrom PV Array8.91 AISC x 1.25 = 11.14 A11.14 A x 1.25 = 13.92 A

Record High Temp. 39.4°CAmbient Temp. Adjustment for conduit exposed to sunlight on rooftops 22°CAmpacity Correction Factor = .58 CFtemp

# of wires in conduit correction factor = .80 CFconduit

13.92 A ÷ (.58 x .80) = 30 A = 12 AWG USE-2

VOLTAGE DROPVdrop = Iop x Rc x LVdrop% = Vdrop ÷ Vop

Vdrop = 8.23 A x 1.93 x .019 = 301.79 mVVdrop% = 301.79 mV ÷ 149 V = .002025 < 1%

Calculations

INVERTER KACO Blue Planet 360Ixi grid tied invertermax. continuous power at 40°CDC input voltageAC output voltage range

MINIMUM INVERTER OUTPUT CIRCUIT CONDUCTOR AMPACITYInverter continuous output rating = 3600 WMinimum Inverter Voltage = 125 VMax Operating Current = 3600 W ÷ 125 V = 28.8 AMin. Inverter Output Circuit ampacity = 28.8 A x 1.25 = 36 A

Calculations

POINT OF CONNECTIONsum of the supply breakers feeding the busbar of a panel can be up to 120% of busbar rating100 A busbar100 A main breaker100 A x 120% = 120 APV breaker = 20 A

GROUNDINGWEEB Grounding Washers (between module and rack)WEEB Grounding Lug (to rack)

ARRAYMOUNTING INFORMATIONZep System II