+ All Categories
Home > Documents > Spring 2011 final project master

Spring 2011 final project master

Date post: 16-May-2015
Category:
Upload: bobmcgonigle
View: 271 times
Download: 4 times
Share this document with a friend
Popular Tags:
35
Solar PV Systems I , Spring 2011 Final Project Bob McGonigle
Transcript
Page 1: Spring 2011 final project  master

Solar PV Systems I , Spring 2011

Final ProjectBob McGonigle

Page 2: Spring 2011 final project  master

Grid Tied Solar PV System

• Limited amount of space• High efficiency panels• Inverter limited to min startup voltage

Page 3: Spring 2011 final project  master

Annual Electricity Usage 11.6 kWh

0

200

400

600

800

1000

1200

1400

1600

kWh

Month/Year

kWh Used

Page 4: Spring 2011 final project  master

Solar Pathfinder Results

Big Maple TreeBig problem !!!

Page 5: Spring 2011 final project  master

Facing East

Page 6: Spring 2011 final project  master

Facing West

Page 7: Spring 2011 final project  master
Page 8: Spring 2011 final project  master
Page 9: Spring 2011 final project  master
Page 10: Spring 2011 final project  master
Page 11: Spring 2011 final project  master
Page 12: Spring 2011 final project  master
Page 13: Spring 2011 final project  master
Page 14: Spring 2011 final project  master
Page 15: Spring 2011 final project  master
Page 16: Spring 2011 final project  master

PV Watts Analysis

Page 17: Spring 2011 final project  master
Page 18: Spring 2011 final project  master
Page 19: Spring 2011 final project  master
Page 20: Spring 2011 final project  master

Buy American (ARRA) Compliant Solar Panels

Page 21: Spring 2011 final project  master
Page 22: Spring 2011 final project  master

Zep System IIMounting System

Page 23: Spring 2011 final project  master
Page 24: Spring 2011 final project  master
Page 25: Spring 2011 final project  master
Page 26: Spring 2011 final project  master
Page 27: Spring 2011 final project  master

Calculations

MODULE INFORMATION STCVOC = 36.90 VISC = 8.91 APtolerance = +5/-3%Max fuse rating = 15 APMAX = 245 WVPMAX = 29.8 VIPMAX = 8.23 AARRAY INFORMATIONNumber of modules in series = 5Total Watts = 1225 W

OPERATING VOLTAGEVPMAX = 29.8 VNumber of modules in series = 529.8 V VPMAX x 5 = 149 Volts

OPERATING CURRENTIPMAX = 8.23 AMAXIMUM SYSTEM VOLTAGEModule Voc = 36.9 VNumber of Modules in series = 5 Lowest temp. on record = -21.7°C

(Coefficient of 1.25 from NEC 690.7)Maximum System Voltage36.9 V x 5 x 1.25 = 230.63 Volts < 600 Volts

MAX PV SOURCE CIRCUIT CURRENTISC = 8.91 A8.91 A x 1.25 = 11.4 A8.91 A x 1.56 = 13.9 A

Page 28: Spring 2011 final project  master

Calculations

WIRING OVERCURRENT PROTECTION

CONDUCTOR AMPACITYFrom PV Array8.91 AISC x 1.25 = 11.14 A11.14 A x 1.25 = 13.92 A

Record High Temp. 39.4°CAmbient Temp. Adjustment for conduit exposed to sunlight on rooftops 22°CAmpacity Correction Factor = .58 CFtemp

# of wires in conduit correction factor = .80 CFconduit

13.92 A ÷ (.58 x .80) = 30 A = 12 AWG USE-2

VOLTAGE DROPVdrop = Iop x Rc x LVdrop% = Vdrop ÷ Vop

Vdrop = 8.23 A x 1.93 x .019 = 301.79 mVVdrop% = 301.79 mV ÷ 149 V = .002025 < 1%

Page 29: Spring 2011 final project  master

Calculations

INVERTER KACO Blue Planet 360Ixi grid tied invertermax. continuous power at 40°CDC input voltageAC output voltage range

MINIMUM INVERTER OUTPUT CIRCUIT CONDUCTOR AMPACITYInverter continuous output rating = 3600 WMinimum Inverter Voltage = 125 VMax Operating Current = 3600 W ÷ 125 V = 28.8 AMin. Inverter Output Circuit ampacity = 28.8 A x 1.25 = 36 A

Page 30: Spring 2011 final project  master

Calculations

POINT OF CONNECTIONsum of the supply breakers feeding the busbar of a panel can be up to 120% of busbar rating100 A busbar100 A main breaker100 A x 120% = 120 APV breaker = 20 A

GROUNDINGWEEB Grounding Washers (between module and rack)WEEB Grounding Lug (to rack)

ARRAYMOUNTING INFORMATIONZep System II

Page 31: Spring 2011 final project  master
Page 32: Spring 2011 final project  master
Page 33: Spring 2011 final project  master
Page 34: Spring 2011 final project  master
Page 35: Spring 2011 final project  master

Questions


Recommended