Steel Fabricated Building -...

Post on 04-Aug-2020

0 views 0 download

transcript

Steel Fabricated Building

Compliance with;

Turkish Regulations,

EU Earthquake Regulations,

California Earthquake Regulations,

Steel Fabricated Building;

Shortens the construction period by %70,

Delivers a 50% cost advantage,

Provides the highest carrying capacity ratio,

Non-Oxidising stainless steel does not require painting or service,

Steel Fabricated Building;

Allows non-bearing walls to be replaced and change the interior design,

Provides long-life buildings,

Provides ultra safety against Lightning by its prevention systems,

Steel Fabricated Building;

Allows to use all kinds of building materials,

Provides highest levels of insulation for;

Heat

Sound

Water & Corrosion,

Fire,

Wall Details;

Plasterboard

10 cm YTONG Wall

Heat Isolation (Straphor)

Exterior Thermal Sheathing

OSB

Coating

Roof Details;

Plasterboard

Rock Wool Isolation

OSB

Membrane Water Isolation

Shingle Coating

Efficiency in Construction