t RIVERFRONT HOTEL AND v rE 5 2 1 4 D POST OFFICE ... · 19.09.2016  · SCOPE DOCUMENTS The...

Post on 02-Aug-2020

1 views 0 download

transcript

RIVE

R ST

REET

SINA

TRA

DRIV

E

EASEMENT

PROPERTY LINE

EASE

MENT

PROP

ERTY

LINE

PROPERTY LINE

DN

OVERHANG

PORT

E CO

CHER

E OVE

RHAN

G

NEWARK STREET

SHARED REAR ACCESS

USPS LOADING

HOTELLOADING

HOTEL LOBBY

HOTELENTRY

WILEY BUILDING

95 RIVER STREET

POST OFFICE

BIKEPATH

765421 3

(PROPOSED,EXISTING 2 WAY)

1

2

ELEV: 7'-0"

ELEV: 10'-0"

WILEY LOADINGPARKING ENTRANCE

EXISTING PARALLEL PARKING

1 2 3 4 5 6 7 8 9 10 11 12 13

1ST STREET

(PROPOSED,EXISTING 1 WAY)

PRO

POSE

D PA

RALL

EL P

ARKIN

G

3

4

5

8

14

ELEV: 17' - 0"

ELEV: 7' - 0"

APPROX. 9%RAMP DN TOP.O. PARKING

4.5% RAMPTRANSITION

P.O. LLV FOOTPRINT

RETAIL

PROPOSED ANGLED PARKING

TOWER EDGE

ELEV: 10'-0"

ELEV: 14'-0"

LAUNDRY

FIREPROTECTION

PANTRY

CIRCULATION

1

2

3

4

5

6

7

8

ELEV: 10'-10"

USPSPARKING

1

2

3

PROPOSEDCURB CUT &RAMP TO USPSPARKINGGARAGE

EASEMENT

EASEMENT

ATLANTA WASHINGTON NEW YORK

©

75 Broad StreetSuite 2210New York, NY 10004(212) 691-0271www.coopercarry.com

SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may beincomplete or not coordinated. The documents issued indicate the general scope ofthe Project. The Contractor is responsible for complete and coordinated pricing andWork, and shall include all items necessary for the proper execution and completionof the Project, whether indicated or not. All components of the Project shall complywith any and all requirements of national, state, and local codes. The Contractor shallinform the Owner and Architect of any omissions, inconsistencies or errors in theinformation provided. If no notice is given and any omissions, inconsistencies orerrors are discovered, the Architect's decisions on items of Work included in thescope shall be binding on the Contractor, when consistent with the general scope andquality of the Project.

Principal-in-Charge

Project Manager

Project Architect

Staff Architect

Project No.

Date

Drawing No.

NOT ISSUED FOR CONSTRUCTION

1

A

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

BC

DE

FG

HJ

KL

MN

P

AB

CD

EF

GH

JK

LM

NP

Copyright Cooper Carry 2016

Q:\2

012\

2012

0240

\d-7

dra

win

gs\d

-7-1

revi

t\use

rs\2

0120

240_

2015

_sch

eme_

25_g

oeth

e020

41.rv

t4/

2 6/2

016

10:4

8 :58

AM

A1.01

2016.03.17

20120240.01JBW

JA

JA

WG

SITE PLAN

RIVERFRONT HOTEL ANDPOST OFFICE RENOVATION

SCHEME 25

Hoboken, New Jersey

KMS Development

PROJ

ECT N

UMBE

R: 20

1202

40.01

PR O

JECT

NAM

E: R

IVER

FRON

T HO T

EL A

N D P

OST O

FFIC

E RE

NOV A

TION

S CHE

ME 25

SHE E

T NUM

BER:

A1 .0

1 - S

I TE P

LAN

ISSUANCESNo. Drawing Issue Description Date

SCALE: 1/16" = 1'-0"A1.011 SITE PLAN

PROJECT N°

75 Broad Street, Suite 2210, New York, New York Tel.212-691-0271© 2016 , Inc.,C COOPER ARRY

20120240.01 05/06/16 AERIAL VIEWS

RIVERFRONT HOTEL AND POST OFFICE RENOVATION Hoboken, New Jersey

Looking Northeast

rreed
Typewritten Text

Looking East Looking Southwest

PROJECT N°

75 Broad Street, Suite 2210, New York, New York Tel.212-691-0271© 2016 , Inc.,C COOPER ARRY

20120240.01 05/06/16 AERIAL VIEWS

RIVERFRONT HOTEL AND POST OFFICE RENOVATION Hoboken, New Jersey