Task 4 - Planning
Plan – Week 1
This table shows the plan I made on week 1 of how I thought I would work on each task. I will update and add a new version of this plan once a week at the end of it and add any changes I think would be necessary for the future and for the week tat has passed.
Plan – Week 2
This week, I have changed the character profile to week 2 as I have found out that I did not have enough time to even start it.
Plan – Week 3
This week, have changed the length of the production bar as I believe I will need a lot of time to finish the final piece.
Plan – Week 4
This week, I have decided that I will keep the plan as it is as I believe that this is how I will carry out the rest of the tasks.
Plan – Week 5
This table shows my overall, complete plan of when I began, continued and finished the various tasks in the assignment. I planned to spend most of the time I have on the production as I would like to get my final piece to look as good as possible, so I spent a total of four weeks making the character and background image. In two of these weeks though, I also began to finish task 3, 4, 6 and 7.