Testing of water penetration under pressure – NBR 10.787/94 (April 2007) Cement: CPII-E 32

Post on 15-Jan-2016

80 views 0 download

Tags:

description

Testing of water penetration under pressure – NBR 10.787/94 (April 2007) Cement: CPII-E 32. Testing of water penetration under pressure – NBR 10.787/94 (April 2007) Cement: CPII-E 32. Applied water pressure: day 1 to day 2: 0,1MPa day 3:0,3MPa day 4 to day 7:0,7MPa. - PowerPoint PPT Presentation

transcript

Testing of water penetration under pressure – NBR 10.787/94 (April 2007)Cement: CPII-E 32

Testing of water penetration under pressure – NBR 10.787/94 (April 2007)Cement: CPII-E 32

Applied water pressure:• day 1 to day 2: 0,1MPa• day 3: 0,3MPa• day 4 to day 7: 0,7MPa

cement content CPII-E 32 350kg/m³

design strength 20MPa

fine aggregate 388kg/m³

coarse aggregate 0 421kg/m³

coarse aggregate 1 632kg/m²

water 192kg/m³

plasticiser admixture 0,3% a 0,4% mc

Slump 90±10mm

W/C ratio 0,54

Penetron Admix 1% of the cement content

Testing of water penetration under pressure – NBR 10.787/94 (April 2007)Cement: CPII-E 32 - 1 week after start of water pressure

Testing of water penetration under pressure – NBR 10.787/94 (April 2007)Cement: CPII-E 32 - 2 weeks after start of water pressure

Testing of water penetration under pressure – NBR 10.787/94 (April 2007)Cement: CPII-E 32 - 3 weeks after start of water pressure

Testing of water penetration under pressure – NBR 10.787/94 (April 2007)Cement: CPII-E 32 - 4 weeks after start of water pressure