* To create an autonomous robotic mouse that will navigate a maze

*

M

Project Overview

System Diagram

Program Module

Tracking Algorithm

Wall Hugger Algorithm

Sense walls

If offset sensors turn on, you are no longer centered.

Increase speed on side of offset sensors until centered

Go as long as there is a wall on the left

if there is a wall on the front, turn right

if there is no wall on the left, turn left

Mechanical Module

Subsystems Chassis Sensor Placement Batteries Motor Electrical Circuitry

Chassis

Completed Chassis

Sensor Layout

Test Sensors

Completed Tasks

Sensor layout

Chassis Attached Wheels Determined type/placement of batteries Pillars

Attained all necessary supplies

What Remains To Be Done

Integrating the sensor circuit ( currently underway)

Determine how many motor pulses needed to move one cell (pending)

Attach motors to circuit (pending)

Programming (in progress)

Functionality Tests (in progress)

Potential Problems

Subsystems not working as planned

Parts breaking

Too much time on troubleshooting

Exams, quizzes, conflicting with working on project

Spring Break: team availability not optimal

Updated Project Timeline

March

Tasks 1       5        10        

15        

20        

25          

31

Build Sensors Circuit                                                              

Build Motors Circuit                                                              

Solder                                                              

Test Motors                                                              

Test Sensors                                                              

Program Sensors                                                              

Program Motors                                                              

Program Mapping                                                              

Program Solving                                                              

Complete Forward Moving

Mouse                                                              

Complete Wallhugger                                                              

First Draft of Paper                                                              

Team Progress Meeting                                                              

Project Timeline (cont)

April

Tasks 1 5

10

15

20

25

30

Debugging/Improvements                                                            

Complete Mouse                                                            

Finishing Touches                                                            

Second Draft of Paper                                                            

Final Draft of Paper                                                            

Team Progress Meeting                                                            

May

Tasks 1       5        1

0      

Finishing Touches                          

Prepare Presentation                          

Team Meeting                          

Final Presentations                          

Questions?