ITER is based on the 'tokamak' concept of magnetic confinement, in which the plasma is contained in a doughnut-shaped vacuum vessel. The fuel—a mixture of deuterium and tritium, two isotopes of hydrogen—is heated to temperatures in excess of 150 million°C, forming a hot plasma. Strong magnetic fields are used to keep the plasma away from the walls; these are produced by superconducting coils surrounding the vessel, and by an electrical current driven through the plasma
International Tokamak Experimental Reactor
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Unprecedented size and technology: large and heavy components, challenging to be built by industry (one of a kind pieces)
Project Challenges
Highly integrated components, built in different parts of the world: quality assurance, machine interface, integration
How to make it profitable: additional and not negligible requirement for industry
The Consortium made by ASG, Iberdrola Ingenieria and Elytt Energy has been awarded the contract for the supply of the10 European TFC WPs in July 2010.
The 18 toroidal field (TF) magnets produce a magnetic field around the torus, whose primary function is to confine theplasma particles
TFC Coils contractA
SG
Sup
erco
nduc
tors
s.p
.a. r
eser
ves
all r
ight
s on
this
do
cum
ent t
hat c
an n
ot b
e re
prod
uced
in a
ny p
art
with
out
its w
ritte
n co
nsen
t
• Technical Responsible of the
project
• Site Responsible
• Manufacturing of all (10) WP
•Design & Manufacturing of
specific tooling
•Project Management and
Schedule
•Quality Assurance
•Engineering support
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
The poloidal field (PF) magnets pinch the plasma away from the walls and contribute in this way to maintaining the plasma's shape and stability. The poloidal field is induced both by the magnets and by the current drive in the plasma itself
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
TF WP Facility
The manufacturing facility
The manufacturing activities are taking place in a workshop in the city of La
Spezia, 100km southwards of ASG’s headquarters in Genova.
1.2Km to the commercial harbour
ASG Superconductors s.p.a. reserves all rights on this document that can not be reproduced in any part
without its written consent
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
The manufacturing facility
ASG Superconductors s.p.a. reserves all rights on this document that can not be reproduced in any part
without its written consent
The workshop extends over an area of
25000m2, 4bays and an office building.
It hosts a clean area extending over 6000m2
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Material Reception and Acceptance
DP Winding He-Inlet & Terminations Assembly
Conductor HT Conductor Insertion into RP RP
Turn Insulation & Cover Welding
Ground insulation / VPI DP Stacking / Ground insulation / VPI
Terminations assembly and WP test before shipment
Manufacturing Process
ASG Superconductors s.p.a. reserves all rights on this document that can not be reproduced in any part
without its written consent
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Manufacturing Process – Floor plan
Tooling/Plants installed and commissioned.
Tooling/Plants installed and yet to be commissioned.
The workshop extends over 25000m2, over 4 bays, one of which is currently not used.
6
AS
G S
uper
cond
ucto
rs s
.p.a
. res
erve
s al
l rig
hts
on th
is
docu
men
t tha
t can
not
be
repr
oduc
ed in
any
par
t w
ithou
t its
writ
ten
cons
ent
Clean Area.
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Bay 1 – Class ISO 8 clean condition over 6000m2
AS
G S
uper
cond
ucto
rs s
.p.a
. res
erve
s al
l rig
hts
on th
is
docu
men
t tha
t can
not
be
repr
oduc
ed in
any
par
t w
ithou
t its
writ
ten
cons
ent
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Winding Line – Commissioned April 2012A
SG
Sup
erco
nduc
tors
s.p
.a. r
eser
ves
all r
ight
s on
this
do
cum
ent t
hat c
an n
ot b
e re
prod
uced
in a
ny p
art
with
out
its w
ritte
n co
nsen
t
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
DP Layers Separation – He-inlet, Terminations AssemblyA
SG
Sup
erco
nduc
tors
s.p
.a. r
eser
ves
all r
ight
s on
this
do
cum
ent t
hat c
an n
ot b
e re
prod
uced
in a
ny p
art
with
out
its w
ritte
n co
nsen
t
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
RHT Furnace – Commissioned – Dec. 2012A
SG
Sup
erco
nduc
tors
s.p
.a. r
eser
ves
all r
ight
s on
this
do
cum
ent t
hat c
an n
ot b
e re
prod
uced
in a
ny p
art
with
out
its w
ritte
n co
nsen
t
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
DP transfer into RP Plant –Commissioned – Dec 12A
SG
Sup
erco
nduc
tors
s.p
.a. r
eser
ves
all r
ight
s on
this
do
cum
ent t
hat c
an n
ot b
e re
prod
uced
in a
ny p
art
with
out
its w
ritte
n co
nsen
t
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
RP CP Laser Welding Plant – Commissioned
December 2012A
SG
Sup
erco
nduc
tors
s.p
.a. r
eser
ves
all r
ight
s on
this
do
cum
ent t
hat c
an n
ot b
e re
prod
uced
in a
ny p
art
with
out
its w
ritte
n co
nsen
t
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Paschen Test Vacuum Chamber Installed And tested - Feb. 2013A
SG
Sup
erco
nduc
tors
s.p
.a. r
eser
ves
all r
ight
s on
this
do
cum
ent t
hat c
an n
ot b
e re
prod
uced
in a
ny p
art
with
out
its w
ritte
n co
nsen
t
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Turn Insulation Wrapping Station, installed in dec. 2013A
SG
Sup
erco
nduc
tors
s.p
.a. r
eser
ves
all r
ight
s on
this
do
cum
ent t
hat c
an n
ot b
e re
prod
uced
in a
ny p
art
with
out
its w
ritte
n co
nsen
t
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Winding of DP prototype: DONE in summer 2013
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Reaction Heat Treatment of DP prototype: DONE in winter 2013
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Transfer of DP prototype into RP: DONE in 2014
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014
Conclusions
After 3 years in the project:
• Design and manufacture of the main tooling has proved to be a very
challenging task, many novel issues requiring novel solutions,
• All the special tooling for DP manufacturing have either been positively
commissioned or in the final assembly/installation phases,
• The procedures for the acceptance of conductors and RPs have been
tested and are routinely executed,
• The Prototype DP related activities are underway and turn insulation is
planned in the next weeks. Passage from stage 1 (R&D + process
qualification) to stage 2 & 3 (manufacturing of 1st and subsequent WPs)
awarded to CON at the end of 2013. Production has already started
(winding of first series DP).
INFN-Energia e Industria verso Horizon 2020 e nuovi mercati – Genova 15-16 gennaio 2014